HomeMy WebLinkAboutItem VI(A) Resolution No 94-16, establishing right-of-way utilization permit fees AGENDA 9-20-94
• r Item VI A
4jf*of 0000`>�`�� JAMES W.SHIRR,P.E.
CITY ENGINEER/LTTILITIES DIRECTOR
150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761
(407)656-2322
MEMORANDUM
DATE: August 8, 1994
TO: The Honorable Mayor and Board of City Commissioners
FROM: James W. Shira, P.E.
City Engineer/Utilities irector
SUBJECT: Resolution No. 94-16 - Right-of-Way Utilization Fees
_____ _
The attached resolution sets out fees for the installation, maintenance and repair of subsurface,
surface and overhead utilities and other facilities within public rights-of-way in Ocoee.
Ordinance No. 94-22 requires the payment of a permit fee for such work, with the fee being
set by Resolution.
I recommend that the City Commission adopt Resolution 94-16.
THE PRIDE OF WEST ORANGE /Ot'�-
RESOLUTION NO. 94- 16
A RESOLUTION OF THE CITY OF OCOEE, FLORIDA,
ESTABLISHING RIGHT-OF-WAY UTILIZATION PERMIT
FEES; PROVIDING FOR SEVERABILITY; PROVIDING AN
EFFECTIVE DATE.
WHEREAS, it is the policy of the City Commission of the City of Ocoee that
whenever possible, the costs of permitting shall be incurred by the developer, and not by the
taxpayers in general; and
WHEREAS, the City Commission of the City of Ocoee believes the most
practical method of defraying the costs of issuance of a permit and performance of the necessary
inspections by the City is through a system of fees directly associated with actual and/or
historical staff, legal and engineering expenses; and,
WHEREAS, the right-of-way utilization permit fees as set forth below are an
accurate method of assessing the costs of issuance of a right-of-way utilization permit and
inspections related thereto to ensure payment thereof; and
WHEREAS, Section 153-5 of Article I of Chapter 153 of the Ocoee Code of
Ordinances requires the City Commission of the City of Ocoee to adopt by resolution a schedule
of fees for the administration of Article I of Chapter 153.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION
OF THE CITY OF OCOEE, FLORIDA, AS FOLLOWS:
SECTION 1. The City Commission of the City of Ocoee has the authority to
adopt this Resolution pursuant to Section 153-5 of Article I of Chapter 153 of the Ocoee Code
of Ordinances, Article VTR of the Constitution of the State of Florida and Chapter 166, Florida
Statutes.
SECTION 2. Right-of-Way Utilization Permit. The City Commission of
the City of Ocoee hereby adopts and approves the SCHEDULE OF RIGHT-OF-WAY
UTILIZATION PERMIT FEES set forth in Exhibit "A" attached hereto and by this reference
made a part hereof.
SECTION 3. Severability. If any section, subsection, sentence, clause,
phrase or portion of this Resolution is for any reason held invalid or unconstitutional by any
court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the remaining portion hereto.
SECTION 4. Effective Date. This Resolution shall become effective
immediately upon passage and adoption.
PASSED AND ADOPTED this day of , 1994.
APPROVED:
ATTEST: CITY OF OCOEE, FLORIDA
Jean Grafton, City Clerk S. Scott Vandergrift, Mayor
(SEAL)
APPROVED BY THE CITY OF OCOEE
COMNIISSION AT A MEETING
HELD ON , 1994
UNDER AGENDA ITEM NO.
FOR USE AND RELIANCE ONLY BY
THE CITY OF OCOEE, FLORIDA
APPROVED AS TO FORM AND LEGALITY
this day of , 1994.
FO LEY & LARDNER
By:
City Attorney
2
EXHIBIT "A"
TO RESOLUTION NO. 94-
SCHEDULE OF RIGHT-OF-WAY
UTILIZATION PERMIT FEES
A. Inspection of utilization of right-of-way:
1. Longitudinal cuts:
a. basic fee $100.00 plus $5.00 per 100 feet or
fraction thereof
2. Transverse cuts:
a. Open cut - paved areas (each cut):
- cut greater than 50 square feet $300.00
- cut 50 square feet or less $100.00
b. Open cut - unpaved areas (each cut) $100.00
c. Bore and jack (each operation) $200.00
3. Overhead Utilities:
a. Installation of poles (other than
repair or maintenance) $75.00 plus $2.00 per pole
B. Inspection of Curb Cuts (driveway):
1. Residential driveway $50.00
2. Commercial - first driveway (Fee is
waived if site inspection fee is
applicable. No fees for curb cut in State
of Florida or Orange County right-of-
way jurisdiction) $400.00 per driveway
C. Construction of roads and other subdivision
improvements on public rights-of-way dedicated
to the public on recorded plats, the development
of which is not governed by current subdivision
regulations 2.00% of the total construction
cost of ALL committed
improvements for which
no other permits apply
D. Miscellaneous inspections for construction on
public property 2.00% of the total construction
cost for any other
construction over, through
or upon public property
not covered by any other
fees
Minimum fee $110.00
E. Landscape Permit for residential street $10.00 per 100 feet
F. Reinspections
1. Any reinspection on same item $150.00
Fees imposed in this Schedule are waived when then permit holder is required to relocate
improvements within the right-of-way due to construction or reconstruction of any road by the City
and such relocation takes place in conjunction with said construction. Similarly, fees will be
waived whenever utilities are placed in the right-of-way during and in conjunction with the
construction or reconstruction of any road by the City. All references herein to "right-of-way"
refers to the streets, rights-of-way and easements for which a right-of-way utilization permit is
required by Article I and Chapter 153 of the Ocoee City Code.
C.\VP5l\DOCS\OCOEE\RESOLUTE.I0118/11/94 I8W015;DPB:dp
4