HomeMy WebLinkAboutItem 04 Consideration of Approval of Change Order No. 3 With Prime Construction Group, Inc. for Reclaimed Water Booster Pumping Facility Project - AGENDA ITEM COVER SHEET Meeting Date: March 1, 2005 Item # Lf Contact Name: Contact Number: David Wheeler 407-905-3100, ext. 1504 Reviewed By: ~ J // Department Director: ~ ". i{/~ City Manager: ~ ) Subject: Change Order NO.3 with Prime Construction Group, Inc. for the Reclaimed Water Booster Pumping Facility Project Background Summary: To perform the work in tapping the CONSERV pipeline, the contractor was required to work around the existing water mains in the area; one of the existing gate valves was not operating correctly and needed to be replaced. Progress Energy changed the required electrical connection from what was designed to an isolated breaker meter connection for safety reasons. The contractor requested additional time because of delays associated with the three hurricanes. Their location was either unknown or in an area that was not in the way of the new construction. The change order amount to include these items is $5,322.67 with an increase of forty-three calendar days. The attached document is Change Order NO.3 with Prime Construction Group, Inc. Issue: The Reclaimed Water Booster Pumping Facility Project requires the additional equipment to operate effectively according to the design intent. Recommendations The Engineering - Public Utilities staff recommends that the City Commission approve Change Order No. 3 for the additional gate valve, upgrade in electrical connection, and additional days associated with hurricane delays in the amount of $5,322.67, with an increase in contract time of forty-three days, and authorize the Mayor and City Clerk to execute the change order. Attachments: 1) Change Order No. 1 between the City of Ocoee and Prime Construction Group, Inc. Financial Impact: This change order will result in an increase of the project's construction contract by $5,322.67. Funds are available for this change order in the contingency for this project. Type of Item: o Public Hearing o Ordinance First Reading For Clerk's Deot Use: o Consent Agenda o Ordinance First Reading o Resolution o Commission Approval o Discussion & Direction o Public Hearing o Regular Agenda D Original Document/Contract Attached for Execution by City Clerk o Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) \~~/Lc:Itn ~ r5ZI N/A D N/A D N/A City Manager Robert Frank - Commissioners Dannv Howell District 1 Scott Anderson, District 2 Rusty Johnson. District :3 Nancy J. Parker. District 4 Mayor s. Scott Vandergrift STAFF REPORT TO: The Honorable Mayor and City Commissioners FROM: David A. Wheeler, P.E. City Engineer & Director of Public Utilities DATE: February 4, 2005 RE: Approval of Change Order NO.3 With Prime Construction Group, Inc. For Reclaimed Water Booster Pumping Facility Project ISSUE The Engineering - Public Utilities Department requests that the City Commission approve Change Order no. 3 with Prime Construction Group, Inc. on the Reclaimed Water Booster Pumping Facility Project for the installation of an additional gate valve, change to the electrical service equipment as required by Progress Energy, and additional time as a result of delays caused by the hurricanes. The change order results in an increase of $5,322.67, with an increase in contract time of forty-three calendar days. BACKGROUNDIDISCUSSION The Reclaimed Water Booster Pumping Facility project includes the construction of a pump station, connection to the CONSER V pipeline, and associated piping and instrumentation to allow for the drawing of reclaimed water from the CONSER V pipeline, a system operated by the City of Orlando and Orange County. The City of Ocoee purchased a lot on south Maguire Road near the CONSERV pipeline that generally runs along Moore Road to be the location of the Reclaimed Water Booster Pumping Facility. The additional gate valve was required to replace an existing gate valve that was not operating correctly. The replacement of this valve was required to allow the contractor to perform required work at another location and will provide for better operations in the future. The electrical panel changes were based upon Progress Energy's requirement for a isolation breaker for the meter connection. This change was provided when the contractor contacted Progress Energy and was different than what was required when the design was performed. The additional days are as a result of delays associated with the three hurricanes. The contractor was required to safe the site before, clean up the site afterward, and delays associated with deliveries from suppliers. The negotiated cost for these work items was $5,322.67 and forty-three additional calendar days in contract time. This change order provides for an increase of 0.48% in the contract amount of $1,097,000. The new contract value including this change order is $1,144,176.42 and the new contract completion date is May 18, 2005. The change order is attached for review. CITY OF OCOEE Engineering/Utilities 150 North Lakeshore Drive Ocoee, Florida 34761-2258 (407) 905-3100, Ext. 1505 (407) 656-7835 (Fax) CHANGE ORDER NO. 003 CITY OF OCOEE PROJECT NO.: OE-387 / 3.0 DATE: January 25.2005 CONTRACTOR: Prime Construction GrouP. Inc. AGREEMENT DATE: May 4.2004 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $1.097.000.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $1.138.853.75 Net Increase (Decrease) Resulting from this CHANGE ORDER $5.322.67 The current CONTRACT PRICE including this CHANGE ORDER $1.144.176.42 ORIGINAL CONTRACT TIME: 300 Consecutive Calendar Days from Notice to Proceed Date: June 7.2004 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: April 5. 2005 Net Increase Resulting from this CHANGE ORDER Days: 43 Current CONTRACT TIME Including this CHANGE ORDER Date: Mav 18. 2005 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES C03-01 Required changes include a 12-inch gate valve to accommodate necessary piping reconfiguration of the existing watermain located along the east side of Maguire Road serving the Hess Station. No additional days will be added to the contract term as a result of the change. C03-02 Required changes include a 600 amp meter base and disconnect. No additional days will be added to the contract term as a result of the change. C03-03 Required changes include an additional 14 calendar days to the Contract Terms for the Jack and Bore and 29 calendar days to the Contract Terms for wet tap to the 54-inch Conserv II Reclaimed Water Main. A total of 43 calendar days to be added to the Contract Terms as a result of this change. III. JUSTIFICATION C03-01 The addition of a 12-inch gate valve in the reconfiguration/relocation of the 12-inch and 4- inch watermain serving the Hess Station allows for the least amount of interrupted service to the Hess Station and provides for an easier reconnect once the wet tap to the 54-inch is complete. C03-02 Progress Energy requires a 600 amp "K" meter base and a disconnect on the line side of the meter base. The proposed C.T. metering was not acceptable per Progress Energy. C03-03 The Contractor has requested (1) an additional 14 calendar days to be added to the Contract Terms due to the impact and the aftermath of the September 5th hurricane which affected the Jack and Bore originally scheduled for September 13, 2004 and rescheduled for September 27, 2004 and (2) an additional 29 calendar days as a result of the rescheduling of the wet tap to the 54-inch Conserv II Reclaimed Water Main due to excessive high water levels resulting from the September hurricanes. IV. NARRATIVE OF NEGOTIATIONS C03-01 Contractor provided lump sum cost of $1,340.33 as shown in the proposal dated November 10, 2004, which includes furnishing and installation of the 12-inch valve at the 54-inch Conserv II Wet Tap. Contractor's proposal appears reasonable and is hereby recommended for acceptance by the Engineer (PEC, Inc.). C03-02 Contractor provided a lump sum cost of $3,982.34 as shown in the attached proposal dated November 24, 2004 and includes a credit for the C.T. Box and Sase and the labor involved. Contractor's proposal appears reasonable and is hereby recommended for acceptance by the Engineer (PEC, Inc.). C03-03 Contract provided a proposal for an extension of the Contract by 14 calendar days due to the delay of the Jack and Bore and by 29 calendar days due to the time delay of the wet tap. Both are due to hurricane related conditions and are addressed in the attached proposal dated December 9, 2004. Contractor's proposal appears reasonable and is hereby recommended for acceptance by the Engineer (PEC, Inc.). V. PAYMENT Change Order Net Increase Net Increase Item No. Description (Decrease) Unit Unit Price (Decrease) Quantitv Price C03-01 12-inch GV All LS $1,340.33 $1,340.33 C03-02 600 Amp meter base and disconnect All LS $3,982.34 $3,982.34 C03-03 Contract extension N/A N/A -0- -0- Total Net Increase (Decrease) Change Order No. 003 $5,322.67 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or -CO/lated by this Change Order. /' .,. RECOMMEND~rrBY: ACCEPTED BY: By: (Signature) Date: /- JI- Dr Date: Title: Construction ManaQer Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: S. Scott Vandergrift, Mayor (Date) Attest: Beth Eikenberry, City Clerk FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,2005. APPROVED BY THE OCOEE CITY COMMISSION IN A MEETING HELD ON , 2005 UNDER AGENDA ITEM NO. FOLEY & LARDNER By: (City Attorney) END OF SECTION 11/11/2004 08:28 FAX 4078568182 PRIME CONSTRUCTION I4l 001 FACSIMILE COVER SHEET PRIME CONSTRUCTION GROUP, INC. 1000 Jetstream Drive, Orlando, FL 32824 P.O. Box 590507. Orlando, FL 32859-0507 FL License # CG C037504 FL License # CU C056650 Fl License # PE 0039513 Telephone: (407) 856-8180 Facsimile: (407) 856-8182 PLEASE CALL IMMEDIATELY IF ALL PAGES HAVE NOT BEEN RECEIVED lEGIBLY. SEND YO: ~ROM: Professional Engineering Consultants, Inc. Corliss M. Fur Furo ATTENTION: DATE: Stephanie Chang 11-Nov-04 FAX; PHONE: # OF PAGES: (407) 849-9402 (407) 422-8062 (Inc. Cover Sheet) [] Urgent D Reply ASAP D Please Comment o Document will not be mailed 0 For your Information REfERENCE: OE-375/2.1 - Reclaimed Water Booster Pumping Facility - City of Ocoee COMMENTS: Stephanie, Attached, please find the proposal for the 12" Valve for the above referenced project. Should you have any questions. please do not hesitate to contact Tom at (407) 856-8180 ext229. -..c!f!!" 1'.. ~1 \\ \...j .~. ..tJ..~':'''~ ~ \;~;- ~~ j -,~..~ -- 11/11/2004 08:28 FAX 4078568182 PRIME CONSTRUCTION 141002 -, PRIME CONSTRUCTION GROUPJ INC. Post Office BOl( 590507 Orlando, FL 32859.0507 037504 Telephone 407-856-8180 Fax 407-856-8182 Fl License #CGC November 10th. 2004 Mr. Robert Rudd, P.E. Professional Engineering Consultants, Inc. 200 E. Robinson St, Ste. 1560 Orlando, FL 32801 Re: OE,375/2.1 RECLAIMED WATER BOOSTER PUMP FACILITIES - CITY OF OCOEE peG Project: #477-03 Installation of new 12" valve Dear Mr. Rudd: Prime Construction Group, Inc. will provide and install a 12~ valve at the 54" tap. The cost below is for material only and no cost for labor. TOT At AMOUNT...........,... ..... ......... ...................... $1 ,340.33 We request 2 additional days be added to the contract term. If you have any questions please don't hesitate to contact me at (407) 856~8180. Thank you. ::;:y~ Project Manager TMP/cmf F:\ProjeccManagemettt\1ob.\477 Reclaime(l. W~tcr Booster Pumping Facility\06Cost Management\Change Ordcrs\CO 477-03 llwNe.doc Change Order Proposal ;,ange Request No.: 477-04 Date: 24.Nov.04 , '1er Reference: D, ;ription: New Electrical Service Pel Crew Size Quantity Unit Unit Price Extension Labor with Burden - PCG Labor Subtotal peG Labor Markup 15.00% Materials Material Subtotal Material Tax 6.50% Material Markup 15.00% Equipment and Other Rentals Rental Subtotal Rental Tax 6.50% Rental Markup 15.00% Subcontracts 1 Credit for C.T. Box and Base .1 LS $455.00 ($455.00) 2 Credit Labor .4 Hr. $65.00 ($260.00) 3 600 4X Disconnect and Base 1 LS $3,525.00 $3,525.00 4 Labor 9 Hr. $65.00 $585.00 Subcontractor Subtotal $3,395.00 Subcontractor Markup 15.00% $509.25 Change Order Su btotal $3,904.25 Daily Jobsite Overhead Days $159.00 Small Tool Allowance $3,904.25 $3,904.25 Bond Amount 2.00% $78.09 Change Order Grandtotal $3,982.34 Additional Contract Time requested Days The items listed above are for classification any, this is a Lump Sum proposal. This estimate is valid for 30 days. F:\Project_Management\J0b6\4n Reclaimed Water Booster Pumping Facility\D6Cost Management\Change Orders\(Change Order tl417-04.XlS]Ch8nge Slleel 10~22-2004 12:40 A 0 ELECTRIC 352 242 0989 PAGE: 1 ~\\0, /'\60 PROPOSAL/CONTRACT A & D Electric Inc. ~28 Che,c;l.nlll ~l. C1en1101lt. Fl. 34711 EC 00027?1) .:'..;:'~'''';''CI'\I:'''' . ..~. no -::-:1"\1". , \ '.. . . "^ & D Eleelric". hcrcinan.CT refcrred to ;i~ "Ehxlrk C olltraclor", proposes to furnish material ,1I1d lahor in at:conlallce wirh rhe job dcseliplion idcntified In lhls Propm:aI/Cnnl.r:\l;1. pursuamlolhc lilllllwing: L SUBMITTED TO~ Tom, Prime ConSlmclioll GrOll)) Ine . PO Box 5l){)()(,2 . Orlando, FI. 321:159-0507 2. JOB PHONES: Phone 1: S56-!WW Phone2 ~ Fax: ~~6-R II< 2 ~. JOB LOCATION: Ocoee 4. pr.ANS DESCRr'PTTON: :'i. JOR DESCRIPTTON. Pcr .Je(( Z;lh;\f:Il' cngincr wilh Pmgrc.~c; Encrgy. the C.t. metering will not be aecepl:lhlc. Progress Energy reqwles a 600a "K" meter base and .1 disconnecr on line sidc o( Ihc rncl.cr hase. Credil ror c.t. ho.\: and hase $455.()(I Labor 4 hIS (<<~ 65.00 - $2(,(1.00 roral credit $71:'>.00 AddeI for 6UOa 4x disconnect and K basc .~,S25.()() Labor 9 hTS @ (is.OO == $5115.()/) lol.;ll atWcr.$ 4110.00 - $ 715.00 == $1195.00 total C,O additional em;\. WE PROPOSE (0 pcrfurm the wl/rl. 1I~ ~[lIlcd In [hlx Cl/l1ttllt:[ In 1Il:Cl/tdllhl:C' with the .~ptcifica(iong and plans submitted and completed in " workmanlike m",mer for (he sum of: with payments: This Contract is executed at "Clennont FI.34 711" bv Electric Contractor AC<:JI.PT ANCF. OF PROPOSA L: The prit:cx. specification.., tCtlnX 1I11lll;Ohdjtion,~ are hereby accepred. You are authorized to do the work as spedfit'.ll. Paymenl will he l1"..dc ll.' f\utlinc,l ..hllV". If. I.' llrlilc:r~IN)d and ,1greed lhallhl~ work i;:; noL provided (or in allY other .1g.rcCillCl1t al,d 110 oLhcr cl.m\r'lct\\al r:ighl~ ,uil;1; unlll thlS propo:lal i:l HC~I..-plCd in We 1f.\lIg Date ............ ......,.,,,,.,,.. Signal.ure ..... ................. ......., ,..".. ........ ..... ...... .... .... ...... ....... ............ . ............ ._.....:.: .. .....:_....:....... ..... ..... .:" .. '..-...:i,!?"i:':,... ... ...... .,.. ., -:-: .".::,:-:.: :- : .,:".. -:.. ..:'.. . .,..-: . . ,. ,... .. ..... .... ..., ... PRIME CONSTRUCTION GROUP, INC. CGC 037504 cue 056650 1000 Jetstream Drive, Orlando, FL 32824 P.O. Box 590507, Orlando, FL 32859-0507 (Mailing Address) 407-856-8180 PH 407-856-8182 FX December 9, 2004 Mr. Robert P. Rudd, P.E. Professional Engineering Consultants, Inc. 200 E. Robinson Street, Suite 1560 Orlando, FL 32801 RE: Construction Delay Project-#OE-375/2.1 Project Name- Reclaimed Water Booster Pumping Facility Dear Robert; Per our conversation at the November 24th Progress Meeting, please find our request for additional days to be added to our construction contract for the following reasons: JACK & BORE The Jack and Bore was scheduled for September 13th but due to weather conditions resulting from the hurricane on September 5th we had to reschedule for September 27th. This request is for an additional 14 calendar days. TAP On September 30th Conserv II requested a rescheduling of the tap due to the excessive high water levels brought on by the September 5th and September 26th hurricanes. The tap was scheduled to be performed on October 5th and 6th but was rescheduled for November 2nd and 3rd. This request is for an additional 29 calendar days. The above request for time is only for the extension of the contract and not for any monetary consideration. Should you have any questions or concerns, please do not hesitate to contact me. Sincerely, ~ Thomas Perley Project Manager TP/cmf