HomeMy WebLinkAboutItem 09 Consideration of Change Order No. 2 with Prime Construction Group, Inc. for Old Winter Garden Road/Professional Parkway Project cellteI of Good Ll _ 85'~ o co#. AGENDA ITEM COVER SHEET Meeting Date: March 15, 2005 q Item # Contact Name: Contact Number: David Wheeler 407-905-3100, ext. 1504 Reviewed By: ~ / Department Director:::=; _ t; ~I:V City Manager: _ -------==- Subject: Change Order No. 2 with Prime Construction Group, Inc. for the Old Winter Garden Road/Professional Parkway Project Background Summary: The Old Winter Garden Road/Professional Parkway project included upgrades to the Orange County Utility system, addition of a reuse system, and improvements to the existing utilities and stormwater systems within the road project limits. Change Order NO.2 includes eleven changes to the Orange County Utility system, three changes to reuse system, and five changes to the overall road project. Details of the proposed changes are included in the attached copy of the Change Order NO.2. The amount of the change order is an increase of $56,228.14, with no adjustment in contract time. Issue: The Engineering -Public Utilities Department has proposed changes to the Old Winter Garden Road/Professional Parkway project to and requests that the City Commission approve Change Order no. 2 with Prime Construction Group, Inc. in the amount of an increase of $56,228.14, with no adjustment in contract time. Recommendations The Engineering - Public Utilities Department recommends that the City Commission approve Change Order No. 2 for the additional work and increase the construction contract by $56,228.14, with no adjustment in contract time, and authorize the Mayor and City Clerk to execute the change order. Attachments: 1) Change Order No. 1 between the City of Ocoee and Prime Construction Group, Inc. Financial Impact: This change order will be funded in part by Orange County Utilities ($16,922.00), Orange County Public Works ($4,009.95), and funds from the Ocoee Utility Bond Issue ($33,269,78), and Ocoee Transportation Bond Issue ($2,026.41). Type of Item: o Public Hearing o Ordinance First Reading o Ordinance First Reading o Resolution o Commission Approval o Discussion & Direction For Clerk's Deot Use: o Consent Agenda o Public Hearing o Regular Agenda cgj Original Document/Contract Attached for Execution by City Clerk D Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) ~Wndfl ~ L8J N/A D N/A D N/A City Manager Robert Frank l/j~~'~ .0(:. Commissioners Danny Howell. District 1 Scott Anderson. District 2 Rusty Johnson. District 3 Nancy J. Parker, District 4 Mayor S. Scott Vandergrift STAFF REPORT TO: The Honorable Mayor and City Commissioners FROM: David A. Wheeler, P.E. City Engineer & Director of Public Utilities DATE: March 7, 2005 RE: Approval of Change Order No. 2 With Prime Construction Group, Inc, For Old Winter Garden RoadJProfessional Parkway Project ISSUE The Engineering -Public Utilities Department requests that the City Commission approve Change Order no. 2 with Prime Construction Group, Inc, on the Old Winter Garden Road/Professional Parkway project in the amount of a reduction of $56,228.14, with no adjustment in contract time. BACKGROUNDIDISCUSSION The Old Winter Garden Road/Professional Parkway project will widen these roads to a four lane divided section and realign the intersection of Bluford Avenue from a "wye" intersection to a signalized "cross" intersection. The project also includes relocation of underground utilities within the roadway right-of-way, All of the utilities in the area are affected and require some amount of relocation. Change Order NO.2 includes adjustments and additions for the work being performed for Orange County Utilities, Ocoee Utilities, and as part of the joint venture Ocoee/Orange County roadway widening project. The Orange County Utilities work is being performed under a JP A Agreement, between both parties, and is funded totally by Orange County Utilities. The roadway widening project is being performed under a JP A Agreement and the funding is spelled out in that agreement. Ocoee Utilities is funding its work. The first 11 items on the change order involve additions of fittings, pipe, and services and the removal of an existing fire hydrant to the Orange County Utilities portion of this project. All of these changes have been approved by Orange County Utilities and the reimbursement will be forwarded upon transmittal of the approved change order to Orange County Utilities. The changes to the road widening project are covered in items 2-12 to 2-15, inclusive, The changes involve addition of Bahai sod, which was not included in the original bid, and the deletion of the same amount of St. Augustine sod. This areas where the sod has been changed are areas that will not receive irrigation. Item 2-14 involved extra work associated with conflicts with an Ocoee water main and its thrust restraint. The water main and representative work was under Old Winter Garden Road and required night time construction in order to close the road. The water main was not where it was shown and the thrust restraint was a massive concrete obstruction. The work required that the water main be moved and the concrete thrust block be removed. Item 2-15 involves the placement of temporary striping at the intersection of Old Winter Garden Road and Professional Parkway to aide in traffic control. Items 2-16 to 2-18 involve changes to the Ocoee utilities being installed as a part of this project. All three items are on the reuse system. They involve connections to the Wal-Mart outside irrigation, Oak Forest Apartments phase 2, and extending the reuse system to serve the Citrus Medical and Office Complex. Wal-Mart and Oak Forest Apartments phase 2 are currently using potable water for irrigation and changing over to reuse water will help Ocoee reduce potable water production to meet its CUP permit. Citrus Medical will be a new customer. Item 2-19 is an adjustment in a substantial completion requirement for the temporary traffic signal at Blackwood and Old Winter Garden Roads. The delay was due to the three hurricanes in august and September. There is no cost for this delay. The change order is attached for review. City of Ocoee Eng in eeri n glUti I ities 150 North Lakeshore Drive Ocoee, Florida 34761-2258 CHANGE ORDER NO. 02 CITY OF OCOEE PROJECT NO.: 804-05 1 OE-382-3.0 DATE: March 4, 2005 CONTRACTOR: Prime Construction GrouP,lnc AGREEMENT DATE: June 16. 2004 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $6.656.540.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $6.628.360.00 Net IncreaselDecrease Resulting from this CHANGE ORDER $ 56.228.14 The current CONTRACT PRICE including this CHANGE ORDER $6.684.588.14 ORIGINAL CONTRACT TIME: 660 Consecutive Calendar Days from Notice to Proceed Date: May 23. 2006 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: May 23. 2006 Net Increase Resulting from this CHANGE ORDER Days: -0- Current CONTRACT TIME Including this CHANGE ORDER Date: May 23. 2006 k: \const\document\oe\oe- 3 82\co Vl02CO- R 1. wpd Page 1 of 6 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. . II. REQUIRED CHANGES A. Orange County Utilities (OCU) JPA Changes 2-1 OC-11, Furnish and install 12" DI Cap (with restraint). 2-2 OC-12, Furnish and install 12" Cutting-in sleeve (with restraint). 2-3 OC-13, Furnish and install 12" x 12" Tee (with restraint). 2-4 OC-14, Furnish and install 12"x 6" Tee (with restraint). 2-5 OC-15, Furnish and install 6" GV (3 each) (with restraint). 2-6 OC-16, Furnish and install 6" Plug (with restraint). 2-7 OC-17, Furnish and install 6" x 6" Tee (with restraint). 2-8 OC-18, Furnish and install 6" Cutting-in sleeve (with restraint). 2-9 OC-19, Remove existing hydrant. 2-10 OC-20, Furnish and install 1" Potable water service. 2-11 OC-21, Furnish and install 6" DI Potable water main. B. Orange County/City of Ocoee Changes 2-12 Bahia Sod: change sod type from St. Augustine to Bahia where no irrigation system is to be provided. 2-13 St. Augustine: Delete sod quantity changed to Bahia Sod. 2-14 Additional Work associated with storm sewer cross of Old Winter Garden Road at ST A 128+80, left. Conflict with existing WM and WM thrust block. 2-15 Furnish and install traffic strip at the intersection of Old Winter Garden Road and Professional Parkway as safety improvement. C. Ocoee Utility Changes 2-16 Furnish and install RW service at STA 135+8, left to Walmart. Work includes 16" x 4" reducer, 4" GV, 4" cap and miscellaneous DI RW pipe (with restraint). 2-17 Furnish and install RW service at STA 138+50 to east section of Oak Forest Apartments. Work includes 6" wet tap and valve to 16" RWM, 6" cap and 130'\7' of 6" DI RW pipe (with restraints). 2-18 Modify RWM at Blackwood increasing size from 4" to 6", provide 2" RW service to median of Blackwood south of Old Winter Garden Road and extend 6" RWM from STA 143+00 to STA 149+00, right. Work includes 16" x 6" tee, 2-6" GV's, 2-6" 450 bends, 2-6" 900 bends, 1-6" 11.50 bend, 6" x4" tee, 4" x 2" reducer, 875' of 6" DI RWM and 2" RW service (130' of 2" HDPE piping with curb stop and box) (with restraint). Cost includes providing deleted 4" DI RWM pipe, valves and fittings to the City for storage/use. 2-19 Change Substantial Completion requirements for Temporary Traffic Signal at the intersection of Old Winter Garden Road and Blackwood Avenue to reflect a completion date of November 1, 2004. k:\const\document\oe\oe- 3 82\coVl02CO-R1. wpd Page 2 of 6 III. JUSTIFICATION A. Orange County Utilities (OCU) JPA Changes 2-1 through 2-8 2-9 2-10 2-11 OCU required changes at connection locations to existing system. OCU required additional work. OCU required additional work. OCU required additional work. B. Orange County/City of Ocoee Changes 2-12 Sod type change per Owner's request. 2-13 Sod type change per Owner's request. 2-14 Existing WM and WM thrust block found to be in conflict with proposed storm sewer at STA 128+80, left. Additional Contract Work performed to relocate and restraint WM and remove thrust block to allow for storm sewer installation. 2-15 Safety improvements per Owner's request. C. Ocoee Utility Changes 2-16 Provide RWM service per Owner's request. 2-17 Provide RWM service per Owner's request. 2-18 Modify RWM per Owner's request. 2-19 Temporary signal Substantial completion date change due to delay associated with HurricaneslProgress Energy-Florida, Inc., relocations. IV. NARRATIVE OF NEGOTIATIONS - CHANGE ORDER NO. 02 A. Orange County Utilities (OCU) JPA Changes 2-1 through 2-8 RFP No. 001 was issued on December 7, 2004. Contractor's CPS was received on December 10, 2004. Final quantity and cost negotiations on December 22,2004. 2-9 Contractor's proposed removal cost on November 17, 2004. OCU accepted proposed cost on December 22, 2004. 2-10 Contractor proposed using established City of Ocoee unit price for potable water service for OCU potable water service. OCU verbal acceptance addressed with PEC on January 27,2004. 2-11 Measured quantity of 6" DI WM installed. Reimbursed at established City of Ocoee unit price for 6" DI WM. k:\const\document\oe\oe- 382\coVl02CO-R1. wpd Page 3 of 6 B. Orange County/City of Ocoee Changes 2-12 and 2-13 CitylPEC requested Bahia sod unit cost during project progress meeting NO.5. Contractor proposed unit cost of Bahia sod at $1.48/sy. Same results in decrease quantity adjustment for St. Augustine sod by 9,134 SY at $3.00/sy. Total decrease adjustment for St. Augustine sod at $27,402.00. Contractor's proposal appears reasonable and is hereby recommended for acceptance by Engineer (PEC, Inc.). 2-14 Contractor submitted request for compensation for additional work on January 26,2005 at a total cost of $17,128.04. No extension of time requested. Same appears reasonable and is hereby recommended for acceptance by Engineer (PEC, Inc.). 2-15 RFP No. 003 was issued on January 11, 2005. Contractor's CPS received on January 21, 2005 at a total cost of $2,792.00 and no request for time extension. Same appears reasonable and is hereby recommended for acceptance by Engineer (PEC, Inc.). C. Ocoee Utility Changes 2-16 RFP No. 004 was issued on January 11,2005. Contractor's CPS received on January 19, 2005 at a total cost of $3,272.66 and no request for time extension. Same appears reasonable and is hereby recommended for acceptance by Engineer (PEC, Inc.). 2-17 RFP No. 006 was issued on January 11, 2005. Contractor's CPS received on January 19, 2005 at a total cost of $10,057.12 and no request for time extension. Same appears reasonable and is hereby recommended for acceptance by Engineer (PEC, Inc.). 2-18 RFP No. 007 was issued on January 17, 2005. Contractor's CPS received on January 26,2005 at a total cost of $19,940.00 and no request for time extension. Same appears reasonable and is hereby recommended for acceptance by Engineer (PEC, Inc.). 2-19 Time only item. k:\const\document\oe\oe- 382\co\#02CO-R1. wpd Page 4 of 6 V. PAYMENT 1. Orange County Utilities changes at $16,922.00 2. Orange County percent changes at $4,009.95 (66.43% of $6,036.36) and City of Ocoee percent changes at $2,026.41 (33.57% of $6,036.36). 3. City of Ocoee Utility changes at $33,269.78. Change Description Net Increase Unit Unit Price Net Increase/ Order Item / (Decrease) (Decrease) No. Quantity Price ORANGE COUNTY UTILITIES CHANGES 2-1 F&I 12"WM Cap (w/restraint) 1 EA $1,141.00 $1,141.00 2-2 F&I 12" WM Cutting-in-sleeve (w/restraint) 1 EA $1,101.00 $1,101.00 2-3 F&I 12"x12" WM Tee (w/restraint) 1 EA $3,142.00 $3,142.00 2-4 F&I 12"x6" WM Tee (w/restraint) 1 EA $812.00 $812.00 2-5 F&I 6" WM GV (w/restraint) 3 EA $1,000.00 $3,000.00 2-6 F&I 6" WM Plug (w/restraint) 1 EA $339.00 $339.00 2-7 F&I 6"x6" WM Tee (w/restraint) 1 EA $549.00 $549.00 2-8 F&I 6" WM Cutting-in-sleeve (w/restraint) 1 EA $369.00 $369.00 2-9 Remove existing WM hydrant 1 EA $1,619.00 $1,619.00 2-10 F&I 1" Potable water service 1 EA $1,700.00 $1,700.00 2-11 F&I 6" DI Potable water main 105 LF $30.00 $3,150.00 Subtotal of Orange County Utilities Changes $16,922.00 ORANGE COUNTY/CITY OF OCOEE CHANGES 2-12 F&I Bahia Sod 9,134 SY $1 .48 $13,518.32 2-13 Bid Item 575-1-4, St. Augustine Sod (9,134) SY $3.00 ($27,402.00) Storm SewerlWM Conflict STA 128+80, left 2-14 All LS $17,128.04 $17,128.04 2-15 F&I Temporary Traffic Strip All LS $2,792.00 $2,792.00 Subtotal Orange County/City of Ocoee Changes $6,036.36 OCOEE UTILITY CHANGES 2-16 F&I RW Service to Walmart All LS $3,272.66 $3,272.66 F&I RW Service east section, 2-17 Oak Forest Apartments All LS $10,057.12 $10,057.12 Change RWM Blackwood Avenue to STA 2-18 149+00, right All LS $19,940.00 $19,940.00 2-19 Temporary signal Substantial Completion date - - - - change. Time only item. Subtotal Ocoee Utility Changes $33,269.78 Total Net Increase Change Order No. 02 $56,228.14 k:\const\document\oe\oe- 3 82\co\#02CO-R1. wpd Page 5 of 6 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: Professional EnClineerinCl Consultants. Inc. Prime Construction Group. Inc. By: By: Signature Signature Date: Date: Title: Construction Manaqer Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: S. Scott Vandergrift, Mayor Date Attest: Beth Eikenberry, City Clerk FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,2005 APPROVED BY THE OCOEE CITY COMMISSION IN A MEETING HELD ON ,2005 FOLEY & LARDNER By: City Attorney k:\const\document\oe\oe- 3 82\coVl02CO-R1. wpd Page 6 of 6