Loading...
HomeMy WebLinkAboutAdd On Item - Transfer of the Ocoee Crown Point PUD Phase 1 Water and Sewer Systems to Orange County Utilities Add-ori T-}-ern Center of Good ire Ceniv. > � OCOER AGENDA ITEM COVER SHEET Meeting Date: March 1, 2005 Item # Reviewed By: Contact Name: David A. Wheeler Department Director: "1 4(1_ Contact Number: 407-905-3100, ext. 1504 City Manager: / Subject: Transfer of the Ocoee Crown Point PUD Phase 1 Water and Sewer Systems to Orange County Utilities Background Summary: As a part of the phase 1 infrastructure for the Ocoee Crown Point PUD project development, the City of Ocoee has constructed the water and sewer systems which will be connected to Orange County Utilities. These systems have been constructed in accordance with the project plans and specifications and have been cleared for use by the Florida Department of Environmental Protection. As the developer of this project, the City is required to transfer the water and sewer systems to Orange County by execution of the Bill of Sale document. The execution of a Bill of Sale and a Maintenance Bond or Letter of Credit is required by Orange County, which is similar to the City of Ocoee' requirements for development. Issue: Authorization by the City Commission for the Mayor and City Clerk to execute the Bill of Sale to transfer the water and sewer systems constructed as a part of the Ocoee Crown Point PUD phase 1 infrastructure to Orange County. Recommendations: The Engineering and Public Utilities staff recommends the City Commission authorize the Mayor and City Clerk to execute the Bill of Sale to transfer the water and sewer systems constructed as a part of the Ocoee Crown Point PUD phase 1 infrastructure to Orange County and authorize delivery of a Maintenance Bond or Letter of Credit to Orange County in accordance with Orange County Utility requirements. Attachments: Bill of Sale-Water and Sewer Facilities Financial Impact: These facilities were constructed and funded as a part of the Ocoee Crown Point PUD phase 1 project. Type of Item: (please mark with an "x") Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Resolution Public Hearing Commission Approval Regular Agenda Discussion& Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by ( ) N/A center of Good Liv Mayor Il1d, Commissioners S. Scott Vandergrift �� Danny Howell,District 1 Scott Anderson, District 2 CityManager Rusty Johnson,District 3 Robert Frank - F Nancy J. Parker,District 4 BILL OF SALE WATER AND WASTEWATER FACILITIES The City of Ocoee, a political subdivision of the State of Florida, located at 150 North Lakeshore Drive, Ocoee, Florida, County of Orange, State of Florida, Seller, for an in consideration of the sum of One ($1.00) Dollar and other valuable consideration paid to Seller by County of Orange, a political subdivision of the State of Florida, Buyer, receipt of which is hereby acknowledged does grant, sell, transfer, convey and deliver to Buyer all pipes, lines, gate valves, valve boxes, fittings, thrust blocks, hydrants, equipment, lift stations and other goods which comprise the water and sewer system installed by Seller and located on the following County easements or rights-of-way as shown on the record drawings, more specifically described as follows: PROJECT: Ocoee Crown Point PUD Phase I Infrastructure Exhibit"A" Legal Description Attached Buyer shall have all rights and title to the goods in itself and its assigns. Seller warrants that it is lawful owner of the goods and the goods are free from all liens and encumbrances. Seller has good right to sell the goods and will warrant and defend the right against the lawful claims and demands of all persons. IN WITNESS WHEREOF, Seller has executed this Agreement at , Florida, on , 200_. SIGNED,SEALED AND DELIVERED ATTEST: BY: S.Scott Vandergrift, Mayor Beth Eikenberry, City Clerk FOR USE AND RELIANCE ONLY BY APPROVED BY THE OCOEE CITY CITY OF OCOEE, FLORIDA COMMISSION ATA MEETING HELD APPROVED AS TO FORM AND LEGALITY ON , 200_UNDER THIS DAY OF , 200 . AGENDA ITEM NO. FOLEY& LARDNER LLP By: City Attorney City of Ocoee• 150 N Lakeshore Drive•Ocoee,Florida.34761 phone: (407)905-3100•fax: (407)656-8504•www.ci.ocoee.fl.us 2/15/2005 I Description I Qty I Unit j Unit Cost I Unit I Total I Ocoee Crown Point Water Cost Breakdown 16"water main 3330 If $ 34.43..per If $114,651.90 16"gate valve&box 11 ea $3,842.54 per ea $ 42,267.94 Hydrant assembly 9 ea $3,375.63 per ea $ 30,380.67 Blow off valve assembly 1 ea $ 670.07 per ea $ 670.07 16"cap 1 ea $ 763.24 per ea $ 763.24 16"x 20"reducer 1 ea $2,116.90 per ea $ 2,116.90 16"45 degree fitting 14 ea $1,102.44 per ea $ 15,434.16 12"PVC water main 1012 If $ 18.50 per If $ 18,722.00 16:x 12"Tee 1 ea $1,331.40 per ea $ 1,331.40 12"gate valve&box 8 ea $1,522.54 per ea $ 12,180.32 TOTAL $238,518.60 P:\6082502\docs\reports\OCU\Water Cost Breakdown 2/15/2005 Description Qty Unit Unit Cost Unit Total Ocoee Crown Point Wastewater Cost Breakdown Furnish and Install 12"PVC Gravity Sewer 170 LF $ 28.96 LF $ 4,923.20 Furnish and Install 8"PVC Gravity Sewer 827 LF $ 21.50 LF $ 17,780.50 Furnish and Install 8"PVC Force Main 7325 LF $ 11.38 LF $ 83,358.50 Furnish and Install Manhole 7 EA $ 4,101.30 EA $ 28,709.10 Furnish and Install 8"Gate Valve and Box 1 EA $ 908.44 EA $ 908.44 Furnish and Install 8"Plug Valve and Box 3 EA $ 1,486.50 EA $ 4,459.50 Furnish and Install 8"45 degree Fitting 4 EA $ 485.50 EA $ 1,942.00 Furnish and Install ARV Assembly 7 EA $ 2,776.93 EA $ 19,438.51 Furnish and Install Lift Station and All Appurtenances 1 EA $165,226.00 EA $165,226.00 TOTAL $326,745.75 P:16082502\docs\reports\OCU\Ocoee Crown Point Wastwater cost breakdown