Subject: Water Plants High Service Pump Upgrades
Background Summary:
The City is in the process of decommissioning the Jamela Water Plant and the Jamela Elevated Storage Tank. To
accomplish this decommission, two pumps at each of the remaining water plants needs to be increased in
pumping capacity and modified to accommodate variable frequency drive type pumps. This up-grade was
included in the 2005-2009 Capital Improvement Plan (CIP) in the approved 2005/2006 budget.
The Florida Department of Environmental Protection (FDEP) has served notice through a preliminary consent
order, which established an expectation that the Jamela Water Plant will be decommissioned by the end of Spring
2006. On November 1, 2005, City Commission and Mayor approved to have staff negotiate directly (best source
vendor) with Sanders Company, Inc. for of the installation of high service pump up-grades at the Forest Oaks
Water Treatment Plant and the South Water Treatment Plant. This best source awarding of the work shall
facilitate a schedule that will meet FDEP's expectation.
Issue:
Should the City Commission approve and authorize the City Manager to execute a purchase order with Sanders
Company, Inc. for the installation of VFD/Pump upgrades at the Forest Oaks and the South Water Plants in the
amount of $184,470.00.
Recommendations
Motion to authorize the City Manager to:
Contract with Sanders Company, Inc. for the installation of two (2) new high service pumps with variable
frequency drives for the Forest Oaks and South Water Plants and all associated improvement as outlined by
the attached proposal and clarification in the amount $184,470.00; and
Authorize an increase in project funding from the Repair and Replacement Fund in the amount of
$28,440.00.
Attachments:
Sanders Company, Inc. Proposal for the FVD/Pump Upgrades and the Forest Oaks and South Water Plant dated
November 23, 2005.
Sanders Company, Inc. Response to Request For Information by Engineer December 5,2005.
Engineer's Recommendation to award a contract December, 2005.
Financial Impact:
Actual Total Budget for this project is $214,440.00 and is based on $184,470.00 for construction, $14,970.00 for
Engineering and $15,000.00 for the FDEP Permit Fee. $186,000.00 was approved in the 2005-2009 Capital
Improvement Plan (CIP) in the approved 2005/2006 budget.
Type of Item: (please mark with an "x'J
Public Hearing
_ Ordinance First Reading
Resolution
~ Commission Approval
Discussion & Direction
For Clerk's Deot Use:
_____ Consent Agenda
Public Hearing
_____ Regular Agenda
_ Original Document/Contract Attached for Execution by City Clerk
_ Original Document/Contract Held by Department for Execution
Reviewed by City Attorney
Reviewed by Finance Dept.
Reviewed by ( )
N/A
N/A
N/A
Citv Manager
Robert Frank
Commissioners
Garv Hood. District 1
Scott Anderson. District 2
Rustv Johnson. District 3
Nancv J. Parker. District 4
Mayor
S. Scott Vandergrift
STAFF REPORT
DATE:
Charles K. Smith, P.E., Utilities Director
TO:
FROM:
October 10, 2005
RE:
Water Plants High Service Pump Upgrades
ISSUE
Should the City Commission approve and authorize the City Manager to execute a purchase order with
Sanders Company, Inc. for the installation of VFD/Pump upgrades at the Forest Oaks Water Treatment Plant
and the South Water Treatment Plant in the amount of $184,470.00.
BACKGROUNDIDISCUSSION
The Jamela Water Plant has reached a condition that it either needs to be completely refurbished or to be
decommissioned. The cost to refurbish the plant exceeds the benefit obtained by the existing system. Therefore;
staff is recommending the decommissioning of this facility. Decommissioning will consist of the following:
1. The relocation of the groundwater capacity well from the Jamela Water plant to one of the remaining
water treatment plants, which would be most likely the Forest Oaks Water Treatment Plant. The City of
Ocoee has corresponded with the SJRWMD on this issue; and although they can not approve the action
until permitted, they did not see any objections.
2. Demolition of plant's treatment facility which shall include; chemical feed system, high service pump,
and pump enclosure. In addition, the abandonment of groundwater welles).
3. Conversion of the ground storage tank into long term city wide record storage by enclosing aeration feed
within the tank ceiling, installing a hatch door on the side of the tank and providing climate (air
conditioning) control. It is anticipated that some site improvements will be required.
4. The Jamela elevated storage tank, which provides system hydraulic stability, will be demolished by
salvage through a competitive bidding process after each of the existing water plants have had high
service pump up-grades with the variable frequency drives.
Staff has investigated the impact to the water system when the Jamela Water Plant is taken off-line. The
investigation includes system modeling, field verification and re-calibration of the model and then a final
evaluation. The model predicts, and field verification confirms, that the Jamela plant can be taken off-line with
minimal system impact. However, when the elevated storage tank is taken off-line the system becomes unstable
and requires constant manual monitoring. Included in the consideration for the demolition of the Jamela Water
Treatment Plant site, is the loss of ground water capacity, which will be regained with the transfer of the new
well to one of the other water treatment plants.
The Florida Department of Environmental Protection has cited continued issues with the Jamela Water Plant and
the City has agreed through a Consent Order (to be authorized by City Commission/Mayor) to decommission the
Jamela Water Plant by April 6, 2005. To facilitate the decommissioning and maintain system stability the
existing water plant requires high service pump modifications. Due to a short schedule, staff is recommending
to award the Sanders Company, Inc. the upgrade work as a best source procurement method. This method limits
design time, the bidding/award phase and shop submittal time for a shorten project schedule.
Sanders Company, Inc.
2816 Southeast Monroe Street
Stuart, Florida 34997
Telephone: 772.220.2900 Facsimile: 772.220.3088 sales@sanderscompany.com
SCOPE OF SUPPLY
November 23, 2005
City of Ocoee
RE: Forrest Oaks & South Water Treatment Plans
Ocoee, Florida
Bid Date: 2: 00 PM November 2, 2005
Gentlemen:
Sanders Company, Inc. is pleased to offer the following equipment for your
consideration for the above referenced project. Within this Scope of Supply we are
offering US FILTER CONTROL SYSTEMS, Danfoss Drives and, FAIRBANKS
MORSE pumps, motors, services and accessories that shall be consistent with the
attached specifications. If the proposal is accepted, Sanders Company, Inc. shall
provide and maintain insurance levels as required by the City for the length of the
project.
Method of Payment shall be based on material allowance at 90% of on-site major
materials and percentage complete of the remaining work. If requested, Sanders
Company will provide a bill of material for tracking purposes.
PUMPS
All pump will complete units with pump, motor, coupling, structural steel base,
drip pan, and split gland.
Forrest Oaks WTP - two (2) new Fairbanks Morse splitcase pumps rated for
1500-gpm @ 179' tdh with 100-hp vfd rated motors
South WTP - two (2) new Fairbanks Morse splitcase pumps rated for 1500-gpm
@ 179' tdh with 100-hp vfd rated motors
VARIABLE FREQUANCY DRIVES
All new pumps will receive a Danfoss VFD mounted in the existing motor control
center. A remote mounted keypad will be installed in the enclosure door. The
drives will be fed from a properly rated circuit breaker.
A total of four (4) 100-hp drives will be supplied with the base bid.
No other equipment and/or services are included other than those specifically stated on this Scope of Supply. This offer is made on the
TERMS OF SALE AS FOLLOWS: Net Thirty (30) days from and invoice or at start-up whichever occurs first based on initial and
continuing credit approval of Sanders Company, Inc. All material is offer FOB factory with freight added to the invoice.
Sanders Company, Inc.
2816 Southeast Monroe Street
Stuart, Florida 34997
Telephone: 772.220.2900 Facsimile: 772.220.3088 sales@sanderscompany.com
SCOPE OF SUPPLY
The alternate add for the jockey pump add include a SO-hp VFD
CONTROL SCADA PANELS
Lot of field mounted parts for the existing Forest Oaks WTP panel (Shop order 61758)
To include:
2 Model CMX24 isolated analog VFO ramp output modules
1 Integra-TR radio with internal modem
1 Bulkhead coaxial radio cable lightning arrestorlinstallation kit
1 100' of LMR400 coaxial cable with connectors
1 YAGI array antenna
1 FCC licensing assistance
1 Revised flash chip for the existing 0620i with the following software changes
. Add radio interface
. Add PIO ramp output for the customers two remote mounted VFO's and revise
pump sequence to provide matrix selection of duty pump & alternation of similarly
sized pumps
1 Set of marked up drawings
6 Sets of revised drawinQs that include the field chanQes
Lot of field mounted parts for the existing South WTP panel (Shop orders 45944-A, 60231 &
503577)
To include:
2 Model CMX24 isolated analog VFO ramp output modules
1 Model 5201-0FNT-OFCM Ethernet to OFI network device
1 Revised flash chip for the existing 0620i with the following software
changes
. Add Ethernet interface to the existing central PLC
. Add PIO ramp output for the customers two remote mounted
VFO's and revise pump sequence to provide matrix selection
of duty pump & alternation of similarly sized pumps
1 Legacy HMI software and test time to modify the existing
Wonderware software package to add the Forest Oaks WTP & South
WTP screens, additional information to the status, alarm and report
screens
No other equipment and/or services are included other than those specifically stated on this Scope of Supply. This offer is made on the
TERMS OF SALE AS FOLLOWS: Net Thirty (30) days from and invoice or at start-up whichever occurs first based on initial and
continuing credit approval of Sanders Company, Inc. All material is offer FOB factory with freight added to the invoice.
Sanders Company, Inc.
2816 Southeast Monroe Street
Stuart, Florida 34997
Telephone: 772.220.2900 Facsimile: 772.220.3088 sales@sanderscompany.com
SCOPE OF SUPPLY
1 Set of marked up drawings
6 Sets of revised drawings that include the field chanaes
Lot of field mounted parts for the existing Waste Water Treatment Plant panel (Shop order
503577)
To include:
1 Software and test time to modify the existing Allen-Bradley PLC with
the following software changes
. Add Ethernet interface from the existing D620i to the HMI
system
. Add radio interface from the existing Forest Oaks WTP panel
to the H M I system
Lot of field mounted equipment for the existing Cutler Hammer MCC located at the South
WTP
To include:
1 Base units with door & 150 A feeder breaker
2 Fans
2 Exhaust
1 CPT for the exhaust fans
Lot of field mounted equipment for the existing Allen-Bradley MCC located at the Forest Oaks
WTP
To include:
1 78" high x 24 1/2" wide MCC door
1 78" high x 34 1/2" wide MCC door
4 Enclosure ventilation louver kits
4 10 II exhaust grilles and filters
2 10" cooling fans with thermoswitch
2 CPT for the exhaust fans
Installation of pump, vfds, and control system is included in the proposal. The
system will be complete in function and operation.
Startup and training is included.
PRICE FOR BASE SYSTEM AS DECRIBED ABOVE
$184,470
ALTERNATE ADD FOR 50-HP JOCKEY PUMP. VFD AND CONTROLS TO
SOUTH WATER PLANT.
PRICE
$ 25,926
No other equipment and/or services are included other than those specifically stated on this Scope of Supply. This offer is made on the
TERMS OF SALE AS FOLLOWS: Net Thirty (30) days from and invoice or at start-up whichever occurs first based on initial and
continuing credit approval of Sanders Company, Inc. All material is offer FOB factory with freight added to the invoice.
Sanders Company, Inc.
2816 Southeast Monroe Street
Stuart, Florida 34997
Telephone: 772.220.2900 Facsimile: 772.220.3088
sales@sanderscompany.com
SCOPE OF SUPPLY
SUBMITTAL DATA PUMPS: 2-3 WEEKS after receipt of an acceptable
order.
Shipment PUMPS: 12-14 WEEKS after complete submittal data approval is
received at the Fairbanks Morse corporate offices in Kansas City, KS.
SUBMITTAL DATA CONTROLS: 4-6 WEEKS after receipt of an acceptable
order.
Shipment CONTROLS: 12-14 WEEKS after complete submittal data
approval is received by US Filter Control Systems.
Thank you for the opportunity to offer these prices and services. Should you have
any questions or require additional data, please feel free to contact either of the
following at anytime: Ron Robinette 407.282.6622 or 800.247.0880.
fJ.R SPPV tfull
j~(S
Ron Robinette
Sales
No other equipment and/or services are included other than those specifically stated on this Scope of Supply. This offer is made on the
TERMS OF SALE AS FOLLOWS: Net Thirty (30) days from and invoice or at start-up whichever occurs first based on initial and
continuing credit approval of Sanders Company, Inc. All material is offer FOB factory with freight added to the invoice.
13028 BELLERIVE LANE
ORLANDO FL 32828
407.282.6622 FAX 407.282.9300
E-MAIL Ron@Mrsewage.com
SANDERS COMPANY, INC.
December 12, 2005
City of Ocoee
Attention Charles Smith
Reference High Service Pump Project
This response is for clarification and amendment of the current contract between the City of Ocoee and
Sanders Company to upgrade the cities South and Forrest Oaks water treatment plants.
Scope
1 - This has been addressed and the pumps will be rated for 1500 @ 1S0'tdh.
3 - If concrete work is necessary Sanders Company will perform the work.
4 - Piping reducers and spool pieces are included in the bid, valves and check valves are sized properly
and are not included in this contract.
5 - Painting is by the city.
6 - Spare packing for each pump is included
7 - Breakers are ether existing or Sanders Company will provide
8 - Old equipment will be given to Owner
Pump
1 - Pump shop drawings will not have piping changes.
2 - Rotation of pumps will be confirmed during submittal process.
3 - Shafts will be high grade steel
4 - Pumps will be packed as all existing pumps
5 - Motor will be ODP
6 - Pumps will be fully tested in the field and factory testing for this model pump will be provided
Controls and SCADA
1 - US Filter Control Systems has over Eighty years (80) of experience and hundreds of references
2 - VLT 8000
3 - Yes
4 - Forrest Oaks 1 and 2 will alternate, South 2 and 3 will alternate.
5 - Unless upgraded pump 1 will not run at all, if upgraded it will shutoff when 2 or 3 starts.
Sincerely,
Ron Robinette
Ron Robinette
Sales
............. ........... ....
SERVING THE WATER & WASTEWATER
INDUSTARY SINCE 1975
Dyer, Riddle, Mills
& Precourt, Inc.
Principals
Wayne D. ChaIifuux
DoIlllldJon K. Bartal.1r,
Lucius 1. Cusbmaa.1r.
Jon S. Meadows
Stepheo L. Precowt
l.awmIoeL. Smith, Jr.
3611 St. J_ Bluft'_ Snlll
Suite 14
JacksmrriIIe, Florida 32224
Plloee: .984..83..6500
Fu: _.O3.6!O1
!lorlow Flmida
CbarIotte, North Carolina
Cbipley. PIorida
DeLaDd. Florida
Ft. Myen. Florida
<laiDoovillc, Florida
1adcsoovi1lc, Florida
0rIaDd0. Florida
Pamoma City BeacIl. PIorida
Tallahassee, Florida
Tampa, Florida
1.800.375.3767
. www.drmp.com
@)I).RMf!
Formerly
North Beach Engineering
Inc.
December 7, 2005
Mr. Charles Smith
Utilities Director
City of Ocoee
1800 A. D. Mims Road
Ocoee, FL 34761
Subject: Forest Oaks and South Water Treatment Plant Improvements
Dear Mr. Smith:
We have reviewed "Scope of Supply" dated November 23, 2005 provided by the Sanders
Company. Comments on the Scope of Supply were submitted by DRMP, Inc. to the Sanders
Company on December 1,2005. The December 1,2005 comments and the subsequent response
from Sanders on December 5, 2005 are considered supplemental information and are attached to
the Scope of Supply.
After careful consideratiotl, DRMP, Inc. recommends awarding the Sanders Company, Inc. the
supply and installation of the following:
1. (2) Fairbanks Morse split case pwnps rated for 1500 gpm @ 150 ft lDH with 100 hp
motors, Danfoss Variable Frequency Drives (VFDs), and a US Filter SCADA
Control System at the South WTP.
2. (2) Fairbanks Morse split case pumps rated for 1500 gpm@ 150 ft IDHwith 100 hp
motors, Danfoss VFDs, and a US Filter SCADA Control System at the Forest Oaks
WTP.
3. All necessary accessories, including circuit breakers, plumbing, spare parts, testing,
and field verification in accordance with the submitted Scope of Supply from the
Sanders Company, Inc., dated November 23,2005 with subsequent documentation
dated December 1, 2005 and December 5, 2005.
The total project cost, including the equipment and installation is $184,470.00.
If you have any questions, please feel free to contact me at (904) 493-6500.
Sincerely,
IJUdk UJ.g~
Heather W. Baxter, P.E.
Senior Project Manager