HomeMy WebLinkAboutItem 03 Approval for Budget Adjustment for CIP Project- Bluford Avenue at Orlando Avenue AGENDA ITEM COVER SHEET Meeting Date: November 1, 2005 Item # 3 Contact Name: Contact Number: Bob Zaitooni 6002 Reviewed By: Department Director: City Manager: ~ Subject: Budget Adjustment for CIP Project- Bluford Avenue at Orlando Avenue Background Summary: The plans and bid documents have been completed for this CIP project. In order to proceed to the official advertisement for bid, it is necessary to adjust the budgeted funds for the project. The official engineer's estimate for construction is $453,000, which will be split between Road Impact Fees and Water Utilities R & R Funds. In addition, there is an unpaid balance of $8,500 for design of utilities by Professional Engineering Consultants (PEe). The current available budget balance is $300,000 from the Road Impact Fee Funds (after the design and preparation of bid documents fee of $50,000). No funds were budgeted from the Water Utility Funds for the design, replacement, and relocation of the water utilities within the project limits. Therefore, in order to proceed with advertisement, it is requested that City Commission consider approval of(1) an additional $71,000 from Road Impact Fees, and (2) $90,500 from the Water Utilities R & R for the project. The additional authorized funds will provide $453,000 for the construction phase of the project and $8,500 for utility design to PEC. Issue: Consider and approve budget adjustments in order to proceed with the advertisement for the construction of the project. Recommendations City Commission to consider approval of an additional $71,000 for Road Impact Fee Funds and $90,500 from Water Utilities R & R Funds to provide $453,000 for construction and $8,500 for utility design fees. Attachments: Engineer's estimate and utility design fee proposal Financial Impact: Available balance in Water Utilities R & R is $330,000 and the available capital for the current Road Impact Fee project exceeds $2,000,000. Type of Item: o Public Hearing o Ordinance First Reading o Ordinance First Reading o Resolution o Commission Approval o Discussion & Direction For Clerk's Deof Use: [8] Consent Agenda o Public Hearing o Regular Agenda o Original Document/Contract Attached for Execution by City Clerk o Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by Utility Department 10-2.5"- OS' Id-'Z..S-l>> dfi61t IZI N/A D N/A D N/A City Manager Robert Frank Commissioners Gary Hood. District 1 Scott Anderson. District 2 Rustv Johnson. District 3 Nancv J. Parker. District 4 Mavor S. Scott Vandererift STAFF REPORT TO: The Honorable Mavor and City Commissioners FROM: Bob Zaitooni, Director of Public Works DATE: October 24,2005 RE: Budget Adjustment for CIP Project- Bluford Avenue at Orlando Avenue ISSUE Should the Honorable Mayor and City Commission approve budget additional funds for the intersection improvements project at Bluford Avenue and Orlando from Road Impact Fee Funds ($71,000) and Water Utility R & R Funds ($90,500) to provide $453,000 for construction and $8,500 utility design to PEC? BACKGROUNDIDISCUSSION This CIP project involves (1) construction of stormwater collection and retention system to eliminate frequent flooding at the intersection, (2) addition of a westbound right turn lane on Orlando Avenue to relief congestion on Orlando Avenue, and (3) widening of Bluford Avenue to include a landscape median and a future left turn lane on northbound approach of the intersection. The plans and bid documents have been completed for this CIP project. In order to proceed to the official advertisement for construction bids, it is necessary to adjust the budgeted funds for the project. The official engineer's estimate for construction is $453,000, which will be split between Road Impact Fees and Water Utilities R & R Funds. In addition, there is an unpaid balance of $8,500 for the design of utilities by Professional Engineering Consultants (PEC). The current available budget balance is $300,000 from the Road Impact Fee Funds (after the design and preparation of bid documents fee of $50,000). No funds were budgeted from the Water Utility Funds for the design, replacement, and relocation of the water utilities. Therefore, in order to proceed with advertisement, it is requested that City Commission consider approval of (1) an additional $71,000 from Road Impact Fees, and (2) $90,500 from the Water Utilities R & R for the project. The additional authorized funds will provide $453,000 for the construction phase of the project and will and $8,500 for utility design to PEC. Available balance in Water Utilities R & R is $330,000 and the available capital for the current Road Impact Fee project exceed $2,000,000. RECOMMENDATION Staff respectfully requests that the Honorable Mayor and City Commission to approve an additional $71,000 from Road Impact Fee Funds and $90,500 from Water Utilities R & R Funds to provide $453,000 for construction and $8,500 for the utility design to PEC. City of Ocoee, Florida Probable Cost Estimate For: Bluford Avenue At Orlando Avenue Intersection Improvements Prepared By: Professional Engineering Consultants, Inc. October 13, 2005 Roadway Improvements Utility Improvements $310,071.00 $101,547.00 $31,007.10 $10,154.70 $341,078.10 $111,701.70 Project Total $452,779.80 ~ ~ I'.) '.'" 01 01 c..> c..> ~ ~ c..l c..> c..> 00 :'-,::: T' T' ~ l\) ~ ~ If ..... ..... 01 01 01 I'.) I'.) N Y' l\) ..... ..... ..... ..... ..... -..j I\) I\) ~ 0 /D ~ I\) 01 .!..i .!..i -..j ~ I\) I\) ~ 0 0 ~ I ~ I'.) ~ !.. 00 ~ ~ ..... ~ 0 ~ 1" ~ ~ . ~ ~ ~ r:-> ~ ~ ~ 0, <0 , .:': ..... I I ..... !.. <0 ..... 01 0 ~ ..... ~ W ~ 0 0 ~ ..... -..j . :':""" CJ) (') (') (') (') ii: m ii: ~ Z ~ ~ ii: 0 m m (') m ~ ii: m 0 0 0 0 0 =i r- 0 r r= ~ :s: >< r- :0 0 CJ) Cl Z Z Z Z r Cl z m "0 "0 r- ~ (') ~ 0 Z OJ -l m ~ m m (5 ~ ~ Cl (') (') (') (') :;0 ::;; :J: Cii Z :;0 CJ) -i r= z :;0 :0 :;0 :;0 m -< 0 CJ) CJ) G'l $ z (5 m ~ ~ G'l ~ m ~ ~ 1:1 0 r n ~ ~ ^ ?:j z z s;; --I )> ~ m m r 5: (5 G'l m m m m m r- CJ) C "0 "0 >< CD m )> (') z (5 c CJ) CJ) --I (') Z (') (jj ~ :0 :J: ::t (ii ~ z ~ 0 (') (') .... 1:1 <- OJ Z 0 0 ~ C 0 --I , )> )> --I -i 1:1 Z m z 0 .:::! :;0 -i IT! IT! :;0 CJ) z Z ~ ~ ~ ~ m m G) :;0 0 ~ 'TI o:! m C1 G) ~ ~ "Tl ~ .1 "0 n n '" '~ G> :;0 0 To ~ n ll<> :0 0 m ~ c C r -l ~ S (') (') :;0 r r (j') (5 ~ ~ (/) ): CD ~ C ^ ^ CJ) c m 0 0 "0 m CD (') .Ol ~ m :j z ~ ~ z Z ::t :0 Z "Tl ~ en "0 ^ (') (') )> G'l "Tl --I =0 ..... :;0 (j') n 5 m S :0 ::0 !:j --I --I ~ :;0 9 m ~ ~ 0 ~ Z :I: :I: m 0 0 d 'S! '0 (') ~ c )> --I ~ m m 'tl C .2S 0 c 3 ~ < ..... ,9 ~ :;0 'tl Z ~ :0 m ~ m S! m (') C ~ :s: .:!l :0 :! ~ (;l m -:::J 'tl ~ C 0 ..... z ~ li':[':::,'::,,',,[,,;!1 m 0 01 --I m ~ ::0 r- 0 ~ )> .::;:; m .C/l m CD r- ..... OJ ~ C/l en . )l r J: OJ ~ .~",;:,.::.[i,:lP:::1 r ..::S en ~ ~ m ~ ~ i5 0 ~ ~ .!!J )> ..... G'l .,~,;l';,:,: r- l\) m . "tJ >< 0 =0 ..... m .!!J ~ "tJ --I ..... ~ 'J::mmn:::.:,,[: I\) . >< ..... ,::mm:'t.[:,:.r: .~ I::,ij::r,;m'~::'::l; ':.:m' ,\,\!ji:.~:":1I CJ) (/) C/l r r ~ r m ~ ~ en C/l CJ) (/) (') (') G r r- r ~ l~,~. -< -< -< "Tl ." "Tl )> -< -< -< -< -< -< en C/l CJ) -< en ..... ..... ..... ~ ..... --J l\) l\) --J ..... 01 ~;,':;~. ,it:;:;l;1 ).. c..> w ~ ..... co .... .... c..> 0 Ol Ol 0 0 0 .... ..... ..... ..... 0 0 01 (J1 0 Ol 0 0'1 U1 0 0 0 0 0 0 ~ ~ ; ... i~tlr." ... ... ... Ol ... ~ !1' c..> !1' "0 l\) ~ ... ... ~ 00 ... 0'1 c..> N ... ~ ... ~ ~ 0 0 ~ ~ ! ... c..> c..> 0 01 0 0 0 ..... ... c..> 0 0 c..> 0 0 0 01 0 ~ 0 0 0 01 0 :l'>- 0'1 0 0 0 !=> l\) ~ '=> '=> '=> 0 '=> a '=> 0 '=> '=> '=> 0 0 a '=> a '=> 0 Co j." 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m ~ ~ ~ * ~ ... :z :z ... ... :~1l~~li ... ... ~ ... ... ... ... ... I\) I\) ~ ... ~ en ~ 0'1 0> --J ... 0 c..l 01 /D 0 01 0 ~ 01 0'1 0 I\) "I'.) "I\) 0 ).. Ol co .0 i.n "c..> 'en "0'1 i.n en i.n "0. 0 "0 0 '" "~ I ~ 0 0 01 01 01 0 ~ 0 0 0 0 0 0 0 0 0 0 0 ~ p 0 0 0 0 0 ~ 0 0 0 0 0 p 0 0 0 0 !=> l\) ~ m 0 '=> '=> 0 0 0 0 0 0 0 0 0 0 0 '=> 0 0 0 Co j." ml 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ... I\) Ol c..l ],m;:nl N ~ 0 ~'ji.m::'1 0 m m m $ m m m ~ m ~ ~ ~ 9 9 ~ g ~ ~ ~ ~ ~ ~ _ ~ ~ ~ g ~ ~ ~ t ~ ~ "D r- r Z en mOO C (5 000 c z m "D -0 C'> )> en )> )> -I r- -I en en -< ;ll en en :J: ~ ~ ~ 5 ~ o lJl to 0 )> !!l !:( !:( "Cl C x m,,'~cr= C'> c c ~ -I ::tI::tI )> o Z z ;ll ::tI en en ~ ffi " :t :J: 0 en ~ flo flo ::tI " zzz"~ en ~ en ~ z :t ;I> ;! Z en flo r- r en :t z .c .c :J: flo en -=i -=i flo Z ;! -< -< Z en r- riI riI en ;! .c :;::! r- ~EBFC ~ ~~ ~ ~ m ~ _~ i _ c o rn ::r ;! ?J .c !!Jra 5:: o .c "U "U m m o 0 m m ~ ~ ~ ::tI )> )> Z Z en en r.i r.i Z Z )> )> r- r- -:n -=n c: c :xl ;ll Z Z 1ii en :J: :J: IlO flo Z Z en en ;! ;! r r .c!: '?'? m m gg ~~ .~ ~ "UO()()en c:)>oO(5 r- to Z Z Z rr-co)> ~ m c: c: r- ~~~~~ ~ $ ~ ~ (5 ~.c~zZ <5 "" (J) ~ z ii ; IlO ~ ~ z z ~ :J: ~ ~ en IlO r- , " z .c ..c ~~o'2 z r ;a i5 en s m m :J: ~ ~ ~ <5:xl ~ $ 0 ;! r ~ E ~.9 ;ll -:00 c: , , OJ o x m !B ~ t;; t;; ~ m)>)>fT1"D_r, )> en en)> "T1"Tl .s:. .s:. "" -to. ~ -" N CD -a. c..:> '" o Vl o 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~ ~ 0 ~ * 000 0 000 0 0 0 m 8 8 8 8 g 8 g 8 8 8 8 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ gg-~~g ~gg~ o 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 000000000 ER N N (.,) co o o o N <n o 0 o 0 o 0 o 0 ~ ~ ~ .~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 8. 0 * ~ * ~ ~ = g ~ ~ ~ ~ ~ ~ ~ N ~ ~ ~ ~ ~ ~ en en en en en 0 f2 f2 f2 f2 f2 ;a c; 5 5 c; c; ~ ::;j -I -I -I -I -I ~ ~ ~ ~ ~ ~ "T1 "T1 'Tl "T1 'T1 r- o n 0 6 f.i )> (f) U) U) en cn AI -I -I -I -I -I ;;0 ::tI ::tI ;ll ;;0 ;;0 0 =c =c =c =c =0 ~ JTI JTI J11 .fT1 .m !Jl -I -I -I -I -I -I :J: ::I: :r :r :J: :J: m m m m m m ;ll ;;0 ;;0 ;;0 ;;0 ;;0 :s: s:: s: s: s:: :s:: o 0 0 0 0 0 "D -0 "D '1l -0 '1l ~ > 5:: 5:: ~ ~ en en cn cn ~ en ::! ::! ::! ::! - ::! () () C'> 0 () () ;;0 0 0 en en en qJ pJ E (5 15 (5 r- Z m ~ z z m m () m en Z ~ )> -I X Z G> <: <3 :s:: en G> flo m .;;0 ~ ::! 'm ~ "U ^ Z <"" )> -I m G> -0 <CAl~Om m UJ :;u en :::. s:c(3m-lm rn S; OJ 5 ? ~ ~ ~ ~ ~ ~ ~ )>lTis:.r!!:I!~ ~~g(j))>z ;;0 r Z z :: G> !Jl !!l il1 ~ N !?2 g ~ 3J ~ ~ g ~ ;:g::J -I (5 Z )> r- ~ ~ N ~ ~ ~ -< .... '1 ~ ~ [!J :L , r- =1 o ~ !!J ~ ~ ..:::: ~ ~ :r :J: =i =i !!l !!l ':( m r , ~ , , r r r rn m m )> )> )> 'T1 'Tl "T1 'T1 'T1 )> )> )> en en en ~~-a.c>>~ m ~ g g g g m co Q) ~ 0) -:.. {;j ~~~tl ~ ~ ~ ~ ~ ~ ~ ~ ~ g g o 0 0 0 0 0 0 000 0 o 0 0 0 0 0 0 000 0 tl ~ ~ ~ ~ tl tl ~ ~ tl g g g g g 8 ~ 8 ~ 8 8 o 0 0 0 0 0 0 000 0 o 0 0 0 0 0 0 000 0 ~ 51> .... .... 01 o o ',j..,;:m '~:;:i:' ;:':t:.;,:] i",\l![,!! I:~"']:!ii':;: . 'in;';::',':'::::;:: .Ii :.~ ::::.: i Ul Ul Ul Ul 8l ~ 8l Ul 0> 00 ex> c.n '" I)-> l\) l\) ~ C? (0 00 t- ~ ~ C? ~ I\) l\) '" ..... X ~ 5 <: Cf' ~ 0 5: <0 , Z )> ;0 z (0 <0 ::u s;: --I (J) (J) (J) 5: (J) s;: ::u :c :c :c c );! ;0 z m ::u ::u ;0 r- Z G> 0 m c c c (') :;lO: 0 ~ (J) (J) c:I c:I c:I :c Z (J) (') (J) en en Z G') (') (5 )> r= )> -0 m '? r r= G') )> -0 Z m x jj 0 m z m C/l m x (5 ::u x 0 -< en C1 0 < G') (J) );! -0 TI -I ="" ill ~ 0 c m 3: -< [II Z 5: Z 3: r- c a en m r- G') r- en c :c r- (') 5: ;0 "=t 5: iii )> :;; :;0 m fO 2! (') ~ m z ~ :c m --l ~ Z ~ )> m ~ z m m C/l 0 iii (') m W ~ -' ::ii z G') ~ -::. c ~ G') c:I )> W )> .j oS m 0 !: z W )> ~ z ~ (') C m !: CITY OF OCOEE BLUFORD AVENUE AT ORLANDO AVENUE WATER MAIN RELOCATION ENGINEER'S ESTIMATE OCTOBER 2005 U1 Furnish and Install 12-inch 0.1. Water Main. LF 477 $92.00 $43,884 U2 Furnish and Install6-inch 0.1. Water Main. LF 185 $70.00 $12,950 U3 Furnish and Install 12-inch Gate Valve and Box. EA 3 $2,000.00 $6,000 U4 Furnish and Install 6-inch Gate Valve and Box. EA 2 $900.00 $1,800 U5 Furnish and Install Fire HydrantlARV Assembly. EA 1 $3,600.00 $3,600 U6 Furnish and Install Fire Hydrant AssemblY'. EA 1 $3,500.00 $3,500 U7 Furnish and Install Water Service Connection. EA 4 $1,300.00 $5,200 U8 Remove and Dispose of 12-inch PVC Water Main. LF 406 $14.00 $5,684 U9 Remove and Disoose of 6-inch PVC Water Main. LF 88 $12.00 $1,05E U10 Remove and Dispose of 6-inch AC Water Main. LF 483 $35.00 $16,905 U11 Retire 2-inch Water Main. LF 242 $4.00 $968 SUBTOTAL - TOTAL UTILITY IMPROVEMENT BID $101,547 CONTINGENCY (10%) $10,155 ENGINEER'S ESTIMATE $111 ,702 The embossed seal of the Engineer indicates that this cost estimate was prepared under the direct supervision of the undersigned registered professional engineer. The presence of this seal does not certify, warrant or guarantee the estimated construction cost will be the actual value of the bid(s) received. The Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and qualifications and represents the Engineer's best judgment at the time this estimate was prepared Professional Engineering Consultants, Inc K:\ .\ENGEST OE-394/2 0 (10/11/05) PB PROFESSIONAL ENGINEERING CONSUL TANTS, INC. March 31, 2005 n"'-l . .'.' 1 P-5093R1/MK-04 OE\PR005 Mr. David A. Wheeler, P.E. Public Works Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 lU SUBJECT: Bluford Avenue at Orlando Avenue Intersection Improvements RE: Proposal for Engineering Services for Water Main Relocations Dear Mr. Wheeler: We are pleased to present the attached proposal for Engineering Services related to the above referenced project. The Engineering Services include the design and preparation of construction plans and specifications, and permitting assistance for the Bluford Avenue at Orlando Avenue Water Main Relocations Project. The objective of this assignment is to provide construction documents for the construction and relocation of City of Ocoee water main affected by the proposed highway and drainage improvements along Bluford Avenue from Columbus Street to Washington Street (platted right-of-way). Based on a review of the highway base sheets; information provided by John Cockrell, Collection and Distribution Supervisor on March 15, 2005; and a field visit performed on March 15, 2005, the City of Ocoee water main relocations required are as follows: The existing 12-inch water main located on the west side of Bluford Avenue between Station 202+40:f: and Station 206+15:f: requires relocation due to the construction of Structures S-2 and S-3. In addition, the proposed ditch grading between Structure S-2 and Station 202+40 will leave insufficient cover over the existing water main (cover over the existing water main would range from only one (1) foot at Station 203..QOt to two (2) feet at Station 206+00t). We propose to relocate the existing 12-inch water main parallel to and approximately five (5) feet west of the existing sidewalk from Columbus Street to Orlando Avenue. This involves the installation of approximately 500 feet of 12-inch water main and 100 feet of 6- inch water main. The existing 6-inch asbestos cement (AC) water main located on Bluford Avenue between Station 202+30:t to Station 206+30:t will be adversely affected by the compaction required due to the roadway widening along the east side of Bluford Avenue. (Refer to Bluford Avenue Typical Section No.1.) In addition, this same 6-inch AC water main is in conflict wirh the construction of proposed Structure S-4 and Pipe P-3 at the Bluford Avenue/Orlando Avenue intersection. engineers planners surveyors "fnQirworing Our Community" 200 East Robinson Street ~ Suite 1560 ~ Orlando, Florida 32B01 ~ 1107 /422-g0G:? c, IIOl lEi!'; (i1U1 Mr. David A. Wheeler, P.E. March 31, 2005 Page 2 P-5093R 1 /MK-04 OE\PRO-05 We propose to place the existing 6-inch AC water main out-of- service from Columbus Street to Orlando Avenue and transfer the existing water services to the newly located 12-inch water main. PEC will provide the City of Ocoee with Technical Specifications, General Requirements, and Measurement and Payment specifications which the City of Ocoee will include with their standard bidding and "front end" documents. Utility relocation plans will be prepared on the Intersection Improvements plans base sheets which have been prepared by Professional Engineering Consultants. Please find attached a general schematic layout of the proposed utility relocations (three (3) plan sheets). We are prepared to perform the following engineering services described herein for the lump sum fee of $8,436. Of this total fee lump sum amount: a) $ 1,905 b) $ 5,808 c) $ 723 represents fees for Preliminary Design; represents fees for Final Design; and represents fees for Permitting Assistance. Enclosed for your review are Man-hour Estimates included in Attachment A and Cost Estimates shown in Attachment B. We appreciate the opportunity to provide our services for this assignment. If you have any questions or require additional information, please do not hesitate to contact the undersigned. Sincerely, PROFESSIONAL ENGINEERING CONSULTANTS, INC. ~~.1Y\~ ~ Geoff Hennessy, P.E. Utility Department Manager/Project Manager TK/GH/cs K:\.. .\OE\PR005\P-5093R 1 Enclosures: (1 ) (2) Attachment A - Man-hour Estimates Attachment B - Engineering Fee Estimate cc: Fursan Munjed, P.E., PEC Cynthia K. Malone, P.E., PEC