Loading...
Item 10 Approval of Waterside Water Reclamation Distribution System Project and Award of Construction Contract to Florida Contracting, Inc. AGENDA ITEM COVER SHEET Meeting Date: August 16,2005 Item # ~O Contact Name: Contact Number: David A. Wheeler 407 -905-31 00, ext. 1505 Reviewed By: Department Director: City Manager: Subject: Waterside Water Reclamation Distribution System Project Award of Construction Contract to Florida Contracting, Inc. Background Summary: The Waterside Water Reclamation System project generally includes the installation of reuse mains within the Waterside subdivision in order to supply reuse water for irrigation and to take those customers off potable water for irrigation. By doing this reuse retrofit project, it will help reduce potable water production and bring the City into compliance with our CUP permit with the St. Johns River Water Management District. The project includes the installation of the piping, valves, meters, and other associated appurtenances. The attached letter from Tetra Tech, Inc. (TTI) is a recommendation to award the contract to Florida Contracting Tnc. in accordance with the base bid for the directional drill option. The Engineering and Public Utilities staffs concurs with TTI's recommendation to award the Waterside Water Reclamation Distribution System project to Florida Contracting, Inc. in the amount of $286,823.00. Issue: The Engineering and Public Utilities Departments request that the Mayor and City Commission authorize the award of the construction contract for the Waterside Water Reclamation System project to Florida Contracting, Inc. Recommendations Staff recommends that the City Commission authorize the Mayor and City Clerk to execute a contract with Florida Contracting, Inc. in the amount of $286,823.00 for the Waterside Water Reclamation Distribution System project in accordance with the following steps: . Authorize the Engineering and Public Utilities Departments to execute the Notices of Intent To Award and secure executed contract documents, bonds and insurance from the contractor. . Authorize the Mayor and City Clerk to execute the contracts with Florida Contracting, Inc. at such time as the contract documents are reviewed for compliance by staff and legal counsel, as needed. Attachments: Tetra Tech letter on award recommendation Bid Tabulations . .'inanciallmpact: This project is funded from the 2003 Utility Bond issue and is under budget based upon the engineer's estimate. Type of Item: (please mark with an "x'? Public Hearing _ Ordinance First Reading Resolution _ Commission Approval Discussion & Direction For Clerk's DeDt Use: _____ Consent Agenda _____ Public Hearing _____ Regular Agenda Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) ~.(] tI N/A N/A N/A , City Manager Robert Frank Commissioners Danny Howell. District 1 Scott Anderson. District 2 Rustv Johnson. District 3 Nancy J. Parker. District 4 Mayor S. Scott Vandergrift STAFF REPORT TO: The Honorable Mayor and City Commissioners FROM: David A. Wheeler, P.E., City Engineer DATE: August 8, 2005 RE: Watenide Water Reclamation Distribution System Project Award of Construction Contract to Florida Contracting, Inc. ISSUE The Engineering and Public Works Departments request that the Mayor and City Commission authorize the award of the construction contract for the Waterside Water Reclamation System project to Florida Contracting, nc. BACKGROUNDIDISCUSSION On Thursday, May 26, 2005, bids were received for the Waterside Water Reclamation System project. The work for this project generally includes the installation of reuse mains within the Waterside subdivision in order to supply reuse water for irrigation and to take those customers off potable water for irrigation. By doing this reuse retrofit project, it will help reduce potable water production and bring the City into compliance with our CUP permit with the St. Johns River Water Management District. The project includes the installation of the piping, valves, meters, and other associated appurtenances. This project was publicly advertised in the Orlando Sentinel and through Central Florida Builder's Exchange, F.W. Dodge Construction Reports, and the Business Alliance. Five contractors submitted bids on this project. CONTRACTOR WATERSIDE WATER RECLAMATION SYSTEM PROJECT Open Cut Direct Bury Option Central Florida Tapping & Construction Services, Inc. American Persian Engineers & Constructors, Inc. Cathcart Contracting, Inc. Gibbs & Register, Inc. $ 388,802.50 $ 397,390.00 $ 446,454.00 $ 552,000.00 Directional Drill Option Florida Contracting, Inc. Gibbs & Register, Inc. $ 286,823.00 $ 557,000.00 The attached letter from Tetra Tech, Inc. (TTI) is a recommendation to award the contract to Florida Contracting Inc. in accordance with the base bid for the directional drill option. The Engineering and Public Utilities staffs concurs with TTI's recommendation to award the Waterside Water Reclamation Distribution System project to Florida Contracting, Inc. in the amount of $286,823.00. The construction cost of this project is lower than the engineer's estimate, of approximately $550,000. The project will be funded from the 2003 Utility Bond Issue. MarkA. Rynning, I'E., MB.A. 'ames E. Christopher, P.E. larJes W. Drake, P.G. illiam D. Musser, PE., P.H. ....awrence E.]enkins, PS.M. SA engineers, hydrogeologists, surveyors & management con~ultants ASSOCIATES. OFFICERS. Marco H. Rocca, C.M.C. Roderick K. Cashe, P.E. Douglas P. Dufresne, P.G. Jon D. Fox, I'E. Daniel M-. Nelson. P.E. June 2, 2005 Les H. Porrerfield, P.E. Andrew T. Woodcock, P.E., M.B.A. John P. Toomey, PE. Jennifer L. Woodall, P,E. Rafael A. Tcrrcro, P.E., DEE Jill M. Hudkins, I'E. Valerie C. Davis, P.G. Charlos M. Shultz, I'E. Soan M. Parks,AIcp, QEP W. Bruce Lafrenz, P.G. HAI# 98-037.05 AJexisK.Stewart,I'E. Christopher W Hanlin, PE. James R. Wamer, PE. SENIOR ASSOCIATES: Via Facsimile & U.S. Mail Mr. David Wheeler, P.E. Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 Subject: City of Ocoee Bid #B05-04 (Waterside Water Reclamation Distribution System) Dear Mr. Wheeler: We have completed our review of the bids submitted for the Waterside Reclaimed Water Distribution System. The lowest apparent bidder was Florida Contracting with a total lump sum bid price of $286,823. We have contacted the references provided by the Contractor and have found that client satisfaction and work quality is good. It is our opinion that the Contractor is qualified to complete the project. Based on this, we recommend issuance of award to the lowest apparent bidder, Florida Contracting for a total awarded contract of $286,823. As discussed, this will conclude Tetra Tech HAl's contractual obligations for the Waterside Reclaimed Water Distribution System. We can prepare a scope of services for construction administration services upon the City's request. If you have any questions, please feel free to contact me or Mr. Mark Rynning at your earliest convemence. KL W/smalcorresp/Wheeler-060205 .klw .doc xc: Joyce Tolbert, City ofOcoee Mark A. Rynning, M.B.A., P.E., Tt HAl Melanie Moretta, E.!., Tt HAl Linda Adams, CCCA, Tt HAl 201 EAST PINE STREET. SUITE 1000 . ORLANDO, FL 32801-2723 TELEPHONE (407) 839-3955 . FAX (407) 839-3790. www.consulthaLcom Bid Tabulation for City of Ocoee Waterside Reclaimed Water Distribution System 98.037.05 Bid Tab "An (Open Trench) Bid Date: May 26, 2005 Central FL Tapping & American Persian Engineers and Construction Services Engineers and Constructors Cathcart Contracting Co. Gibbs & Reaister Inc. Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price U1 Mobilization/Demobilization LS 1 $5,395.00 $5,395.00 $20,000.00 $20,000.00 $13,100.00 $13,100.00 $15,000.00 $15,000.00 U2 General Requirements LS 1 $36,585.00 $36,585.00 $15,000.00 $15,000.00 $58,000.00 $58,000.00 $75,000.00 $75,000.00 U3 Indemnification LS 1 $255.00 $255.00 $500.00 $500.00 $130.00 $130.00 $1,240.00 $1,240.00 U4 Utility Test Pits LS 1 $1,555.00 $1,555.00 $5,000.00 $5,000.00 $1,300.00 $1,300.00 $15,000.00 $15,000.00 U5 Connection to Existing Water Main EA 1 $1,025.00 $1,025.00 $7,500.00 $7,500.00 $1,400.00 $1,400.00 $2,000.00 $2,000.00 U6 Furnish and Install 4" HDPE Reclaimed WM LF 3600 $26.50 $95,400.00 $15.00 $54,000.00 $25.29 $91,044.00 $25.00 $90,000.00 U7 Furnish and Install 6" HDPE Reclaimed WM LF 800 $31.00 $24,800.00 $20.00 $16,000.00 $29.69 $23,752.00 $30.00 $24,000.00 U8 Furnish and Install 8" HDPE Reclaimed WM LF 3400 $35.50 $120,700.00 $30.00 $102,000.00 $33.59 $114,206.00 $37.00 $125,800.00 U9 Furnish and Install 4" DI Gate Valve and Box EA 11 $825.00 $9,075.00 $1,600.00 $17,600.00 $1,130.00 $12,430.00 $1,000.00 $11,000.00 U10 Furnish and Install 6" 01 Gate Valve and Box EA 2 $975.00 $1,950.00 $1,950.00 $3,900.00 $1,242.00 $2,484.00 $1,200.00 $2,400.00 U11 Furnish and Install 8" 01 Gate Valve and Box EA 4 $1,495.00 $5,980.00 $2,890.00 $11.560.00 $1,534.00 $6,136.00 $1,600.00 $6,400.00 U12 Furnish and Install DI Flushing Valve EA 1 $1,050.00 $1,050.00 $1,590.00 $1,590.00 $1,596.00 $1,596.00 $1,500.00 $1,500.00 U13 4" 01 22.5 de9ree bend LB 350 $10.50 $3,675.00 $5.00 $1,750.00 $5.22 $1,827.00 $9.00 $3.150.00 U14 4" 01 45 de9ree bend LB 150 $9.25 $1,387.50 $7.00 $1,050.00 $10.15 $1,522.50 $9.00 $1,350.00 U15 6" DI 22.5 de9ree bend LB 150 $6.85 $1,027.50 $8.00 $1,200.00 $5.12 $768.00 $9.00 $1,350.00 U16 6" DI 45 degree bend LB 1.50 $5.50 $825.00 $10.00 $1510" $5.08 $762.00 $9.00 $1,350.00 U17 8" DI 22.5 degree bend LB 1320 $4.75 $6,270.00 $10.00 $13,200.00 $4.26 $5,623.20 $9.00 $11,880.00 U18 8" DI 45 degree bend LB 660 $4.10 $2,706.00 $12.00 $7,920.00 $4.26 $2,811.60 $9.00 $5,940.00 U19 4" DI Tee LB 80 $6.50 $520.00 $8.50 $680.00 $5.37 $429.60 $9.00 $720.00 U20 6"x4"DITee LB 115 $4.50 $517.50 $9.00 $1,035.00 $5.00 $575.00 $9.00 $1,035.00 U21 8" DI Tee LB 370 $4.75 $1,757.50 $7.00 $2,590.00 $3.60 $1,332.00 $9.00 $3,330.00 U22 8" x4" DI Tee LB 1155 $5.50 $6,352.50 $8.00 $9,240.00 $3.69 $4,261.95 $9.00 $10,395.00 U23 8" x 6" DI Tee LB 175 $5.00 $875.00 $9.00 $1,575.00 $3.64 $637.00 $9.00 $1,575.00 U24 6" x 4" DI Reducer LB 120 $7.70 $924.00 $7.50 $900.00 $5.91 $709.20 $9.00 $1,080.00 U25 8" x 6" DI Reducer LB 95 $6.00 $570.00 $10.00 $950.00 $4.61 $437.95 $9.00 $855.00 U26 Double Service Connection EA 41 $265.00 $10,865.00 $500.00 $20,500.00 $619.00 $25,379.00 $800.00 $32,800.00 U27 Double Service Connection (wI Railroad Crossin9) EA 26 $905.00 $23,530.00 $750.00 $19,500.00 $1,198.00 $31,148.00 $1,800.00 $46,800.00 U28 Single Service Connection EA 3 $300.00 $900.00 $450.00 $1,350.00 $617.00 $1,851.00 $600.00 $1,800.00 U29 Single Service Connection (w/ Railroad Crossing) EA 8 $875.00 $7,000.00 $600.00 $4,800.00 $1,447.00 $11,576.00 $1,500.00 $12,000.00 U30 Asphalt Removal and Temporary Repair SY 1111/111/111/11/111/11/11/11111111/111/1111/1 REMOVED /1/1/1/1/1///11/////11///////////11 REMOVED //////////////////// /11//////////////11 /111111/11////// REMOVED ////////// U31 Removal and Replace Concrete Sidewalk SY 25 $95.00 $2,375.00 $150.00 $3,750.00 $150.00 $3,750.00 $120.00 $3,000.00 U32 Removal and Replace Concrete Driveway SY 115 $85.00 $9,775.00 $250.00 $28,750.00 $165.00 $18,975.00 $150.00 $17,250.00 U33 Maintainence of Traffic LS 1 $3,180.00 $3,180.00 $22.000.00 $22,000.00 $6,500.00 $6,500.00 $25,000.00 $25,000.00 TOTAL LUMP SUM BID (TOTAL OF ITEMS U1 - U33) $388,802.50 $397,390.00 $446,454.00 $552,000.00 Bid Tabulation for City of Ocoee Waterside Reclaimed Water Distribution System 98.037.05 Bid Tab "B" Bid Date: May 26, 2005 Florida Contracting Co. Inc. Gibbs & Register Inc. Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Ul Mobilization/Demobilization LS 1 $15,000.00 $15,000.00 $13,000.00 $13,000.00 U2 General Requirements LS 1 $5,950.00 $5,950.00 $80,000.00 $80,000.00 U3 Indemnification LS 1 $100.00 $100.00 $1,090.00 $1,090.00 U4 Utility Test Pits LS 1 $6,750.00 $6,750.00 $15,000.00 $15,000.00 U5 Connection to ExistinQ Water Main EA 2 $2,800.00 $5,600.00 $2,000.00 $2,000.00 U6 Furnish and Install 4" HDPE Reclaimed WM LF 3,600 $14.00 $50,400.00 $28.00 $100,800.00 U7 Furnish and Install 6" HDPE Reclaimed WM LF 800 $22.00 $17,600.00 $36.00 $28,800.00 U8 Furnish and Install 8" HDPE Reclaimed WM LF 3,400 $26.00 $88,400.00 $39.00 $132,600.00 U9 Furnish and Install 4" DI Gate Valve and Box EA 11 $1,020.00 $11,220.00 $1,000.00 $11,000.00 U10 Furnish and Install 6" DI Gate Valve and Box EA 2 $1,200.00 $2,400.00 $1,200.00 $2,400.00 U11 Furnish and Install 8" DI Gate Valve and Box EA 4 $1,400.00 $5,600.00 $1,600.00 $6,400.00 U12 Furnish and Install DI Flushino Valve EA 1 $1,400.00 $1,400.00 $1,500.00 $1,500.00 U13 4" DI 22.5 deoree bend LB 350 $9.10 $3,185.00 $9.00 $3,150.00 U14 4" DI45 deQree bend LB 150 $6.30 $945.00 $9.00 $1,350.00 U15 6" DI 22.5 degree bend LB 150 $11.00 $1,650.00 $9.00 $1,350.00 U16 6" DI 45 deoree bend LB 150 $11.00 $1,650.00 $9.00 $1,350.00 U17 8" DI 22.5 degree bend LB 1,320 $7.55 $9,966.00 $9.00 $11,880.00 U18 8" DI 45 degree bend LB 660 $7.10 $4,686.00 $9.00 $5,940.00 U19 4" DI Tee LB 80 $5.05 $404.00 $9.00 $720.00 U20 6" x 4" DI Tee LB 115 $5.00 $575.00 $9.00 $1,035.00 U21 8" 01 Tee LB 370 $5.60 $2,072.00 $9.00 $3,330.00 U22 8" x 4" 01 Tee LB 1,155 $6.00 $6,930.00 $9.00 $10,395.00 U23 8" x 6" 01 Tee LB 175 $6.00 $1,050.00 $9.00 $1,575.00 U24 6" x 4" 01 Reducer LB 120 $11.00 $1,320.00 $9.00 $1,080.00 U25 8" x 6" 01 Reducer LB 95 $14.00 $1,330.00 $9.00 ' $855.00 U26 Double Service Connection EA 41 $410.00 $16,810.00 $800.00 $32,800.00 U27 Double Service Connection (w/ Railroad Crossino) EA 26 $580.00 $15,080.00 $1,800.00 $46,800.00 U28 Single Service Connection EA 3 $580.00 $1,740.00 $600.00 $1,800.00 U29 SinQle Service Connection (wi Railroad Crossing) EA 8 $580.00 $4,640.00 $1,500.00 $12,000.00 U30 Asphalt Removal and Temporary Repair SY 45 $26.00 $1,170.00 - - U31 Maintainence of Traffic LS 1 $1,200.00 $1,200.00 $25,000.00 $25,000.00 TOTAL LUMP SUM BID (TOTAL OF ITEMS U1 - U31) $286,823.00 $557,000.00