Loading...
Item VII (B) Discussion/ Action re: Effluent Disposal - (1) Ocoee/Winter Garden lnterlocal Agreement 2) Addendum No. 98-3 to Agreement for Consulting Engineering Services between Ocoee and PEC to be paid by the City of Winter Garden Agenda 7-7-98 o2. Item VII B vp i or JAMES W. SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: July 1, 1998 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utilities erector SUBJECT: Ocoee/Winter Garden Interlocal Agreement In October 1997 I brought before the City Commission a request to authorize staff and our consultants to work with the City of Winter Garden to develop a conceptual wastewater reuse and effluent disposal plan that would benefit both cities. The plan we envisioned would enable both cities to work together to minimize construction costs while maximizing the amount and effective use of treated wastewater effluent. The authorization was granted, and we have since had several meetings with our consultants, Professional Engineering Consultants, Inc. (PEC), Andreyev Engineering, City of Winter Garden staff,the St. John's River Water Management District and the Florida Department of Environmental Protection(DEP)to discuss the proposed plan. As a result of those discussions, we have received conceptual approval of our plan from DEP and the St. John's River Water Management District. The proposed plan calls for Ocoee and Winter Garden to share equally in the cost of a pipe that will run between the Forest Lakes golf course and Winter Garden's existing rapid infiltration basin(RIB) effluent disposal site on Ocoee-Apopka Road. This pipe will serve two purposes. During most of the year, effluent from Winter Garden's plant will be pumped through the pipe to the golf course, where it will be used for irrigation. The effluent from Ocoee's plant which is currently being used by the golf course will then be available for use along Clarke Road and nearby developments. During wet periods of the year, when the demand for irrigation is reduced, effluent from Ocoee's plant will be pumped through the pipe to the RIB site, for filtration through the soil and eventual discharge to Lake Apopka. Both Ocoee and Winter Garden will need to make certain improvements to their wastewater treatment plants to enable them to implement this plan. The improvements to Ocoee's plant are currently under design by PEC. Due to PEC's familiarity with the project, Winter Garden has determined that the most cost effective design of their plant improvements would be realized by also using PEC's design THE PRIDE OF WEST ORANGE vc3 services. To that end,the attached proposed Interlocal Agreement allows each city to use the other's existing design services contracts to the extent required to implement this plan. Attached for your review and action are two documents. The first is an Interlocal Agreement between Ocoee and Winter Garden. This agreement lists the responsibilities of each city in order to implement the proposed regional effluent disposal/reclaimed water system. The second is Addendum No. 98-3 to PEC's contract with Ocoee. This Addendum, and the referenced PEC Proposal No. P-8126/P-8130, describes the work to be performed by PEC and their fee, for the design of the Winter Garden plant improvements. While this is an Addendum to the Consulting Engineering Services Agreement between Ocoee and PEC,the referenced services are to be performed by PEC for the City of Winter Garden, and PEC's engineering services fee is to be paid directly by the City of Winter Garden. By using PEC for their plant improvement design, Winter Garden will be able to complete design and construction of the required improvements concurrent with the completion of Ocoee's improvements. Approval of this Addendum and Interlocal Agreement will enable Ocoee and Winter Garden to proceed with the development of their regional effluent disposal/reclaimed water system. I recommend that the City Commission authorize the Mayor and City Clerk to: 1) execute the Interlocal Agreement between Ocoee and Winter Garden, and 2) execute Addendum No. 98-3 to the Agreement for Consulting Engineering Services between Ocoee and PEC for the not-to-exceed fee of$108,598.00, such fee to be paid entirely by the City of Winter Garden. Attachments INTERLOCAL AGREEMENT THIS INTERLOCAL AGREEMENT is made this day of , 1998, by and between the CITY OF WINTER GARDEN, FLORIDA, a Florida municipal corporation (hereinafter referred to as "Winter Garden") and THE CITY OF OCOEE, FLORIDA, a Florida municipal corporation (hereinafter referred to as "Ocoee"), collectively referred to as the "parties." RECITALS WHEREAS, Ocoee owns and operates a 3.0 MGD wastewater treatment system that produces public-access quality effluent; and WHEREAS, Ocoee owns and operates a reclaimed water system providing reclaimed water to the Forest Oaks Golf Course and is designing and permitting an expansion of its City- wide reclaimed water program; and WHEREAS, Winter Garden owns and operates a wastewater treatment system that produces an advanced secondary effluent that is programmed to be upgraded to public-access quality effluent; and WHEREAS, Winter Garden owns and operates an underdrained rapid infiltration basin (RIB) system with effluent disposal capacity (2.0 MGD); and WHEREAS, Winter Garden and Ocoee desire to establish an agreement under which a regional effluent system will provide an expanded reclaimed water program for Winter Garden and Ocoee and additional wet weather disposal for Ocoee; and WHEREAS,Winter Garden and Ocoee desire to provide cost-effective and timely design and permitting services for the regional reclaimed water program; and NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, it is agreed as follows: Section 1 - Incorporation of Recitals. The foregoing recitals are true and accurate and are incorporated herein by reference. Section 2 - Purpose. The purpose of this Agreement is to facilitate a regional effluent disposal/reclaimed water system that shall be used jointly by the City of Winter Garden 1 0E-253 and the City of Ocoee. The implementation of the regional effluent disposal/reclaimed water system shall result in the reduction of total nutrient loadings into Lake Apopka. The initial phase of the reclaimed water program will allow Winter Garden to dispose public- access quality effluent to the Forest Lake Golf Course. The Forest Lake Golf Course is currently permitted to accept up to 1.0 MGD (at'erage annual) of public-access quality effluent. Ocoee will divert public-access effluent from the Forest Lake Golf Course to the new City-wide reclaimed water storage, pumping, and distribution system. Ocoee's expanded reclaimed water program will provide reclaimed water to residential, commercial and open space along the Clarke Road corridor from S.R. 50 to Ocoee Clarcona Road. Concurrently the City of Ocoee will have access to the underdrained rapid infiltration basin (RIB) system owned by the City of Winter Garden. The City of Ocoee will only use the Winter Garden RIBS during wet weather conditions for disposal of up to .25 MGD (average annual). Ocoee will send wet weather flows up to 1.0 MGD for a maximum of 90 days to the Winter Garden RIB system. The purpose of this Interlocal Agreement is to enable Winter Garden and Ocoee to share effluent disposal facilities and reduce the capital expenditures paid by the respective utility customers. Winter Garden and Ocoee agree to allow either City use of existing continuing engineering/hydrogeological services to implement the design and permitting of the Regional Reclaimed Water Program. Another benefit of the regional concept for effluent disposal/reclaimed water system is to maximize the quantity of public-access quality effluent from both parties that is available for reclaimed water. Implementation of Phase 1 of the Regional Effluent Disposal/Reclaimed Water Program will require the following improvements: Winter Garden shall be responsible for the design. permitting and construction of the following capital improvements: (Within 18 months of the effective date of this agreement): 1. High level chlorination and filtratipn at the treatment facility or pumping facility. 2. 3,500 feet of 12-inch transmission main from the existing underdrain collection system to the storage and holding pond(s) at the Forest Lakes Golf Course. The cost of design, permitting, and construction of the transmission main shall be divided evenly between Winter Garden and Ocoee. 3. Any other reclaimed water related capital improvements at Winter Garden's treatment facility or RIB system that may be required by the approved Florida Administrative Code as implemented by the Florida Department of Environmental Protection (FDEP). 2 OE-253 Ocoee shall be responsible for the design. permitting and construction of the following capital improvements: (Within eighteen months of the effective date of this agreement): 1. Reclaimed water pumping and storage facilities at A.D. Mims Treatment Facility. 2. Reclaimed water distribution system along A.D. Mims Road and Clarke Road. 3. 3,500 feet of 12-inch transmission main from the existing underdrain collection system to the storage and holding pond(s) at the Forest Lakes Golf Course. The cost of design, permitting, and construction of the transmission main shall be divided evenly between Winter Garden and Ocoee. 4. Nutrient reduction capital improvements of the Ocoee Wastewater Treatment Facility to meet advanced-secondary treatment as required by the existing wastewater operating permit issued by FDEP. 5. Any other reclaimed water related capital improvements at Ocoee's treatment facility that may be required by the Florida Administrative Code as implemented by the Florida Department of Environmental Protection (FDEP). Section 3 - Conditions Precedent. All rights, obligations and liabilities of Winter Garden and Ocoee under this Agreement shall be subject to the satisfaction of the following conditions precedent: 1. The complete execution of this Interlocal Agreement by Winter Garden and Ocoee. 2. No action, suit, proceeding or official investigation shall have been threatened, announced, or commenced by any person or federal, state or local governmental authority or agency that seeks to enjoin, assess civil or criminal penalties against, assess civil damages against, or obtain any judgment, order or consent decree with respect to either party hereto, in connection with their respective representations and obligations under this Interlocal Agreement. 3. The parties shall exercise good faith and due diligence in satisfying the conditions precedent set forth immediately above. 3 OE-253 Section 4 - Representations of Ocoee. Ocoee makes the following representations to Winter Garden: 1. Ocoee is duly organized and in good standing under the laws of the State of Florida, and is duly qualified and authorized to carry out the governmental functions and operations set forth in this Agreement. 2. Ocoee has the power, authority, and legal right to enter into and perform the obligations set forth in this Agreement, and the execution, delivery and performance hereof by Ocoee (I) has been duly authorized by the City Commission of the City of Ocoee; (ii) does not constitute a default under, or result in the creation of any lien, charge, encumbrance or security interest upon the assets of Ocoee, except as otherwise provided herein. Section 5 - Representations of Winter Garden. Winter Garden makes the following representations to Ocoee: 1. Winter Garden is duly organized and in good standing under the laws of the State of Florida, and is duly qualified and authorized to carry on the governmental functions and operations set forth in this Agreement. 2. Winter Garden has the power, authority, and legal right to enter into and perform the obligations set forth in this Agreement, and the execution, delivery and performance hereof by Winter Garden (I) has been duly authorized by the City Council of the City of Winter Garden; (ii) does not constitute a default under, or result in the creation of any lien, charge, encumbrance or security interest upon the assets of Winter Garden, except as otherwise provided herein. Section 6 - Statutory Authority, This Agreement shall be considered an Interlocal Agreement pursuant to Chapter 163.01, F. S. A true and correct copy of this Agreement shall be filed with the Clerk of the Circuit Court in Orange County. Section 7 - Effective Date: Commencement of Seryice: Term of Agreement 1. The effective date of this Agreement shall be the date of the signature of the last party to sign this Agreement (the "Effective Date"). 2. The commencement of service shall occur on March 31, 1999, or on an earlier date mutually agreed to by the parties (the "Commencement Date"). The commencement is, however, contingent upon receipt of all applicable permits from FDEP and OCEPD. A delay in the obtainment of said permits may cause day-for-day time delay in commencement, but in no 4 0E-253 event shall such delay in commencement exceed one (1) year. The Commencement Date under this Agreement may be extended by either party upon thirty (30) days' prior written notice to the other party for a period not-to-exceed one (1) year after March 31, 1999. In the event both parties are unable to obtain all of the required permits by March 31, 1999, then the Commencement Date of this Agreement may be extended only by the mutual agreement of the parties. References to the Commencement Date shall include any extension authorized herein. 3. The term of this Agreement shall be for a period of 10 years beginning on the Commencement Date of this Agreement. Sections 8 - Duties of the Parties Prior to the Commencement Date 1. Prior to the Commencement Date, each party shall acquire all necessary easements and rights-of-way to effectuate the purposes of this Agreement. 2. Each party will cooperate with the other party in obtaining any and all regulatory permits necessary or convenient to the operation of the effluent/reclaimed water disposal system. Each entity is authorized to use any existing professional services contract to complete the design and permitting of the Regional Reclaimed Water Project. 3. Not later than one year after the Commencement Date, Winter Garden shall have completed all identified (Section 3) improvements and infrastructures that Winter Garden is responsible to complete, including, but not limited to, pipelines and disinfection improvements excluding those improvements and infrastructures required to be provided by Ocoee. 4. Not later than the Commencement Date, Ocoee shall have completed all improvements and infrastructures identified (Section 3) that Ocoee is responsible to complete, including, but not limited to, pipelines, reclaimed water storage and pumping facilities and nutrient reduction treatment. 5. The point of connection between the two systems shall be at a location where the respective facilities boundaries meet, the exact site will be mutually agreed upon at a later date. 6. Winter Garden and Ocoee shall bear all expenses to design, permit and construct improvements and infrastructures as identified in Section 3 respectively necessary to ensure efficient transfer and distribution of treated effluent and reclaimed water pursuant to the terms of this Agreement. 5 0E-253 7. All construction of improvements and infrastructures shall be in accordance with all applicable federal, state, county or municipal laws, ordinances and regulation. 8. The schedule for completion of the capital improvements necessary to implement the proposed Regional Reclaimed Disposal is attached as Exhibit IIA 11 Section 9 - Wet Weather Capacity. On and after the Commencement Date and during wet weather conditions, Winter Garden agrees to accept advanced-secondary quality effluent from Ocoee in an amount equal to an annual average of 250,000 gallons per day. The Wet Weather Capacity shall remain fixed for each 10 year period of this Interlocal Agreement; the first such period shall begin on the Commencement Date. Winter Garden and Ocoee shall, one (1) year prior to the expiration of each 10 year term, negotiate any adjustments to the Wet Weather Capacity. Such adjustments',to the Wet Weather Capacity shall be made only upon mutual agreement of the parties. In the event that the parties fail to adjust the Wet Weather Capacity, the Wet Weather Capacity for the immediately following 10 year period shall remain at its then current level. Section 10 - Reclaimed Water Capacity. In order to operate as an integrated effluent disposal system, an operating protocol will be established by the parties that is compatible with the existing effluent system(s) such that both systems may operate as an integrated regional effluent disposal system. An operating protocol shall be established such that both systems may also operate independent of the other. On or after the Commencement Date, the City of Ocoee agrees to accept public-access level treated effluent from Winter Garden to provide irrigation at the Forest Lakes Golf Course in an amount equal to an average annual 750,000 gallons per day. The Reclaimed Water Capacity (up to .75 MGD) shall remain Fixed for each 10 year period of this Interlocal Agreement, first such period shall begin on the commencement date. Winter Garden and Ocoee shall, one (1) year prior to the expiration of each 10 year term, negotiate any adjustments to the Reclaimed Water Capacity. Such adjustments to the Reclaimed Water Capacity shall be made only upon mutual agreement of the parties. In the event that the parties fail to adjust the Reclaimed Water Capacity, the Reclaimed Water Capacity for the period shall remain at its current level. Section 11 - Indemnificatiott 1. Ocoee agrees that it will indemnify and hold harmless Winter Garden to the extent permitted by law, from any and all liability, claims, damages, expenses, proceedings and causes of action of any kind and/or nature arising out of or connected with Ocoee's management, control, use, operation, maintenance or repair of the reclaimed water distribution 6 0E-253 facilities provided for hereunder subject to Section 768.28, F. S. Ocoee agrees that it will, at its own expense, defend any and all actions, writs or proceedings which are brought against Winter Garden and which arise out of circumstances set out previously in this paragraph and that it will satisfy, pay and discharge any and all judgments that may be entered against Winter Garden in any such actions or proceedings. 2. Winter Garden agrees that it will indemnify and hold harmless Ocoee to the extent permitted by law, from any and all liability, claims, damages, expenses, proceedings and causes of action of any kind and/or nature arising out of or connected with Winter Garden's management, control, use, operation, maintenance or repair of the reclaimed water distribution facilities provided for hereunder subject to Section 768.28, F. S. Winter Garden agrees that it will, at its own expense, defend any and all actions, writs or proceedings which are brought against Ocoee and which arise out of circumstance set out previously in',this paragraph, and that it will satisfy, pay and discharge any and all judgments that may be entered against Ocoee in any such actions or proceedings. Section 12 - Notices. All notices required pursuant to this Agreement shall be in writing, and shall be delivered to the parties by United States mail, postage prepaid, as follows: Winter Garden Representative City of Winter Garden City Manager 251 W. Plant Street Winter Garden, Florida 34787 Ocoee Representative: City of Ocoee City Manager 150 N. Lakeshore Drive Ocoee, Florida 34761 Section 13 - Permits and Approvals, The parties agree that the implementation of this Agreement will be subject to the exercise of the regulatory authority by various state and local agencies. Winter Garden and Ocoee agree that each entity will at its own expense obtain and maintain any and all necessary governmental permits and approval for the provision of effluent disposal through the underdrained rapid-infiltration basin system and the reclaimed water distribution system. Winter Garden and Ocoee agree each shall use its best efforts to assist in obtaining any such permits or approvals such that a volume of properly treated wastewater can he disposed of on the property consistent with Section 3 hereof; and toward that end, shall execute and consent to the filing of any necessary 7 OE-253 documents and applications with governmental agencies to accomplish the purposes set forth in this Section. Reporting and Monitoring. Winter Garden and Ocoee agree that each entity shall keep a daily log of the total gallons per day of effluent that is applied to the RIB site and the Forest Lake Golf Course. This information shall be transmitted monthly to each party. Each entity shall be responsible for the background groundwater quality and compliance groundwater quality, sampling and reporting as described in the respective operating permits, and shall provide copies of such reports to other city. Enforcement. A default by either party under this Agreement shall entitle the other party to all remedies available at law or in equity, including, but not limited to the right of damages, injunctive relief and specific performance. Section 14 - Notice. Any notice or document required or permitted to be delivered under this Agreement or the easement to be granted hereunder shall be in writing and shall be deemed delivered at the earlier of 1) the date received, or 2) three (3) business days after the date deposited in a United States Postal Service depository, postage prepaid, registered or certified mail, return receipt requested. Section 15 - Nonwaiver. Failure by either party to demand compliance with a provision of this Agreement will not constitute a waiver of that party's right to demand compliance with the provision thereafter. Section 16 - Governing Law. This Agreement shall be governed, construed, and controlled in accordance with the laws and rules of the State of Florida. Section 17 - Recordation Upon execution of this ',Agreement, Winter Garden and Ocoee shall have the right to record this Agreement in the Public Records of Orange County, Florida, at their respective expense. Section 18 - Time of the Essence. Time is hereby declared to be of the essence to this contract. Section 19 - Term/Modifications/Renewal. 1. This Agreement shall expire 10 years from the commencement date. 2. If for any reason during the term of this Agreement, any local, district, state or federal governments or agencies shall fail or refuse to issue necessary permits, grant necessary approvals, or shall require any change 8 0E-253 in the operation of the treatment plant, treated wastewater lines, irrigation facilities, or the application and use of treated wastewater, then to the extent that such requirements shall affect the ability of either party to perform any of the terms of this Agreement, the affected party shall be excused from the performance thereof. In such case, the parties shall attempt in good faith to modify this Agreement to make it conform with the terms of such required changes. Additionally, the parties to this Agreement shall be excused from performing under this Agreement during such time as prevented by act of God. 3. This Agreement may be modified pr the expiration extended at any time, by mutual written consent of the parties. 4. This Agreement may be extended or renewed at the option of either party for at least 3 additional 10 year terms as follows: a. Between the 24th month and the 18th month prior to the expiration date, either party may mail a Notice of Intention to Renew Effluent Agreement to the other party by CER111-1hD MAIL to the address set forth beneath the signature line, hereinbelow. Upon timely mailing and receipt of sudh notice, the parties shall commence negotiations for a new agreement or for an extension or a renewal of this Agreement. b. If the parties are unable to reach a new agreement, or agree upon the terms for an extension or renewal, by the end of the 12th month prior to the expiration date of this Agreement, either party may invoke arbitration to determine the reasonableness of each party's disputed proposals. The arbitration panel shall consist of three residents of Florida, two of whom shall be selected by the respective parties (one by each party), and the third shall be selected by the other two arbitrators. If the two arbitrators fail to agree upon the third, they shall request that the Presiding Judge for the Circuit Court in and for Orange County, make the selection. The arbitrators shall have power to determine and resolve all disputes under the proposed new agreement, extension or renewal, except for the following: (1) Its term, which shall be three years. (2) That the parties may be excused from the minimum or maximum GPDs established by this Agreement. 9 OE-253 Section 20 - Grant of Easement. Winter Garden and Ocoee shall grant an assignable easement over, upon, and under the property described in Exhibit A, that shall run concurrently with the term of this Agreement, for the purpose of: 1. Installing and/or modifying treated wastewater lines to the existing effluent disposal facilities; 2. Transmitting treated wastewater that meets the Florida Department of Environmental Protection standards both as to the quality of such wastewater and as to the amount of wastewater than can be discharged onto Winter Garden's property via irrigation facilities and/or RIBS as they are currently permitting or may be permitted and constructed in the future; 3. Detaining, retaining and storing treated wastewater in the RIBS system when and if constructed and permitted for such use; and 4. Maintaining and operating the irrigation facilities as appropriate to allow the discharge of treated wastewater onto the property and into the RIBS. Section 21 - Severability. If any section, subsection, sentence, clause, phrase or portion of this Agreement is for any reason held invalid' or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision of such holding, and such holding shall not affect the validity of the remaining portions hereof. Section 22 - Attorney's Fees. In the event of any litigation hereunder to enforce or construe the terms of this Agreement, the prevailing party shall be entitled to an award of its reasonable attorney's fees and court costs incurred in such action. Section 23 - Successors and Assigns, This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective',successors and assigns. Section 24 - Applicable Law, The laws of the State of Florida shall govern the validity, interpretation, construction and performance of this Agreement. Venue for any suit involving this Agreement shall be in Orange County, Florida. Section 25 - Entire Agreement. This is the entire Agreement between the parties, covering everything agreed upon or understood in the transaction, and supersedes all previous letters, correspondence, drafts, and other agreements or documents on the same subject. There are no oral promises, conditions, representations, understandings, interpretations, or terms of any kind as conditions or inducements to the execution hereof in effect between the parties. No change or addition is to be made to this Agreement, except by written agreement executed by the parties. 10 OE-253 IN WITNESS WHEREOF, the parties have set their hands and seals on the dates below stated. Attest: CITY OF WINTER GARDEN By: CITY CLERK MAYOR Dated; Attest: CITY OF OCOEE By: CITY CLERK MAYOR Dated: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, FLORIDA. APPROVED AS TO FORM AND LEGALITY this day of , 1998 FOLEY & LARDNER By: City Attorney 11 0E-253 Exhibit "A" The following schedule is planned to implement the Regional Reclaimed/Effluent Disposal System as agreed between the Cities of Winter Garden and Ocoee. Project Completion Date 1. 3,500 feet of interconnecting force January 1999 main 2. Reclaimed water storage and March 1999 pumping facility at Ocoee WWTF 3. Alum treatment facility at Ocoee March 1999 WWTF Reclaimed Water 4. Distribution System along A.D. March 1999 Mims Road and Clarke Road 5. Chlorination and filtration facilities at March 1999 Winter Garden Treatment Facility 12 0E-253 ADDENDUM NO. 98-3 TO AGREEMENT FOR CONSULTING ENGINEERING SERVICES INCLUDING ENGINEERING DESIGN AND PERMITTING SERVICES FOR EXPANSION AND IMPROVEMENT OF THE OCOEE/WINTER GARDEN REGIONAL RECLAIMED WATER PROGRAM This Addendum No. 98-3 hereinafter called the Addendum, as of this 19th day of June, 1998, shall constitute an Addendum to the Agreement for Consulting Engineering Services between the City of Ocoee, Florida (the CITY) and Professional Engineering Consultants, Inc., 200 East Robinson Street, Suite 1560, Lake Eola Centre, Orlando, Florida (the CONSULTANT), dated the 21st day of August, 1984, hereinafter referred to as the AGREEMENT. WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the CITY retained the CONSULTANT to provide professional engineering services as required from time to time, and WHEREAS the CONSULTANT will perform consulting engineering services for the CITY as herein defined. NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth on the part of both parties to be kept and performed, the parties do mutually agree as follows: Section 1 - Services of the Consultant 1.1 The CONSULTANT shall perform the Engineering services as outlined in the attached proposal P-8126/P-8130, revised as of June 19, 1998 relative to the provision of consulting engineering services to the CITY. 1.2 The CONSULTANT shall perform the Engineering services as outlined in accordance with the Winter Garden/Ocoee Interlocal Agreement for a Regional Reclaimed/Effluent Disposal System. Section 2 - Compensation 2.1 Compensation by CITY for engineering services provided under this Addendum shall be computed under Paragraph 6.1.2.3 of the Agreement, utilizing the Hourly, Not-To-Exceed Method of Compensation with the compensation for this authorization not-to-exceed $108,598.00, without further authorization from the CITY. 2.2 The compensation for engineering services shall be paid by the City of Winter Garden. The CONSULTANT acknowledges that the City of Ocoee is not obligated to compensate CONSULTANT for engineering services. Section 3 - Time of Completion 3.1 The CONSULTANT shall provide the design and permitting related services within four (4) months from receipt of Notice-To-Proceed, bidding and construction period is currently anticipated to require twelve (12) months. IN WITNESS WHEREOF, the parties have executed this Addendum No. 98-3 the day the year hereinabove set forth. � • �I!/ By: ATTEST: / Kenneth R. Hooper, Principal Date: e- Jc9 G:\cler\env\oe\ocoee98-3.AND BOARD OF CITY COMMISSIONERS CITY OF OCOEE, FLORIDA By: ATTEST: S. Scott Vandergrift, Mayor Date: For the use and reliance of City of Ocoee only. Approved as to form and legality this day of , 1998. City Attorney G:\clerlenv\oelocae698-3.AND J ` PEC \ JUN 1 91998 PROFESSIONAL ENGINEERING CONSULTANTS, INC. June 19, 1998 P- / MK-04 Mr. John Kirby, P.E. Mr. James W. Shira, P.E. City Engineer City Engineer/ Utilities Director City of Winter Garden City of Ocoee 251 W. Plant Street 150 N. Lakeshore Drive Winter Garden, Florida 34787-3011 Ocoee, FL 34761 Re: City of Winter Garden Wastewater Treatment Facility Fee Proposal Dear Messrs. Kirby and Shira: Professional Engineering Consultants, Inc. (PEC) and Andreyev Engineering are pleased to present an engineering proposal for the design, permitting, construction drawings and bidding assistance for the addition of automatic'backwash (ABW) filters and a chlorine contact tank at your existing wastewater treatment facility. Our proposal is based on the mutual understanding we developed at our meeting of May 18, 1998 at your wastewater treatment facility. Our proposal is for the addition of ABW filters rated at 2.0 MGD which are expandable to 4.0 MGD, plus a condrete chlorine contact tank at 2.0 MGD which is also expandable to 4.0 MGD. The addition of filters, chlorine contact chamber and associated pumping will result in the upgrading of the Winter Garden Treatment Facility to achieve public-access level treatment. 'Upon completion of the described capital improvements, the Winter Garden Facility will be able to supply reclaimed water to the Winter Garden/Ocoee Regional Reclaimed Water System. The basic design premise for upgrading of the existing treatment facility to public-access level of treatment includes: • The existing sand drying beds and/or the steel pressure filters will be demolished and/or removed from the site. • A new ABW filter and chlorine Contact tank will be constructed in the general vicinity of the old drying beds and pressure sand filters. • The ABW filter will connect to the effluent line from the existing final clarifiers and the effluent will gravity flow through the new ABW filter and the chlorine contact tank. • The existing effluent pumps will be relocated to the end of the new chlorine contact tank where they will pump effluent to the Winter Garden disposal site. We have prepared a preliminary construction cost estimate based on the cost of recently constructed filters and concrete tanks. The construction cost is preliminarily estimated to be $981,000.00. re:neers :ar're1s r.eScrs 200 . reet • 3..7? • .r ar co 32.°0 • 4C72.22-e.062 • n 10 8,19-;4C' Mr. John Kirby, P.E./Mr. James W. Shira, P.E. June 19, 1998 Page 2 Our engineering services include the following: 1. Preliminary design and permitting services (including subconsultants)$28,996.00 2. Final design, construction drawings (including subconsultants) $31,020.00 3. Bidding Assistance $8,074.00 4. Construction Phase Services and Periodic Inspections $40.508.00 TOTAL DESIGN FEE $108,598.00 Based on the preliminary construction cost estimate of $981,000.00 our total fee for preliminary design, permitting and construction drawings is 6.1% of the construction cost. Attachment "A" is a description of each task anti the associated manhours. Attachment "B" is a summary of the required manhours and hourly cost for each phase of the assignment. Also included is a detailed description of the construction cost estimate. The design/permitting phase is estimated to be four (4) months, the bidding phase is estimated to be two (2) months and the construction phase is estimated to be ten (10) months. The total schedule for design, permitting', bidding and construction is sixteen (16) months. Please review this proposal and contact me at your convenience. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Xa/(61-0-,12_ Kenneth R. Hooper Principal KRH/bk g:\cler\env\pro98\p-8126/p-8130.1tr ATTACHMENT A MANHOUR ESTIMATES for CITY OF WINTER GARDEN WINTER GARDEN FILTER AND CHLORINE CONTACT/ PUMP STATION P-8126 Page 1 d Task: NoRM.. . RPR. ; : Task Description/Scope of Services. '' M.. Sr.E. : Tech' CAM : : WP Total Premise: All information to be provided by the City is presumed to be accurate information and no verification of this data will be required. Work under this authorization shall not begin until all information which will enable the ENGINEER to proceed with this assignment is received by PEC. The generation of new data which may be required also is not included in this scope of services provided by this proposal,except as specifically stated herein. 1. PREUMINARY DESIGN A. Filter and Chlorine Contact/Pump Station 1. Review City As-Built drawings and data related to the site and proposed construction and coordinate survey for elevations and pipe locations. 1 8 6 0 0 0 15 2. Review and compile City WW Operating data(influent,effluent,solids)for incorporation into the FDEP permit application. 0 8 0 0 0 2 10 3. Prepare preliminary design for an ABW fitter,chlorine contact/pump station and miscellaneous minor site demolitions and improvements. 2 40 48 0 0 10 100 4. Review the above with the City of Winter Garden and make revisions. 0 12 16 0 0 2 30 5. Coordinate geotechnical investigation to address subsoil and groundwater conditions and general soil suitability including recommendations for foundation support and site soil preparation and dewatering. 1 4 2 0 0 2 9 (The following only pertains to the selected configuration): 6. Prepare preliminary cost estimate. 0 4 4 0 0 1 9 7. Meet with City of Winter Garden staff to review preliminary engineering data,design and estimates before proceeding with final design. 0 4 2 0 0 2 8 SUBTOTALTASK.IA-Preliminary:Design-'Chlorine<Contact'and Pump:Station - 4 80' 78 0 •0 ' '19 11/1:' B. Permitting(FDEP Wastewater Treatment Construction Permit Application) 1. Develop a brief Preliminary Design Report(PDR)based on the criteria developed above. 2 32 24 0 0 12 70 2. Complete FDEP Permit Application Forms 1 and 2A for the proposed improvements as a"Major Modification"to the existing facilities. 0 12 6 0 0 2 20 i 3. Submit two(2)copies of the draft FDEP application package to the City for review and revise accordingly. 0 8 4 0 0 4 16 4. Submit two(2)copies of the Preliminary Engineering Report and permit applications to FDEP. City of Winter Garden to pay all permitting fees. 0 2 0 0 0 1 3 5. Respond to Requests for Additional Information(RAI)from the FDEP. 0 12 6 0 0 4 22 • SUBTOTAL.:TASK:IB_ PemuttinS 2 66 :::40 0:.. 0 23 :, 134,;: SUBTOTAL.TASK1A4:1B:=,Preliminary:Desiign 6 146 118. . .. 0 ...: 0.. .. :::;42 .::1312.:- .1;:',...113R098\P-8126AB.WB2 12;`__:'...1PR098\P-8126AB.WB2(05/27/98) ATTACHMENT A MANHOUR ESTIMATES for CITY OF WINTER GARDEN WINTER GARDEN FILTER AND CHLORINE CONTACT/ PUMP STATION P-8126 Pa•e 2 Task . . ........... _ ,: — --- -- --- -- -- NO WP Tota4 Task Desai foNS pt cope otServices - • - P:M. Sr.E. Tech CAM. RPR II. FINAL DESIGN A. Final Design-Reuse HSPS&GST 1. Prepare Contract Drawings(24"x 36")as follows: No. Sheets Discipline Description 1 General Location Map/Notes 1 General Legends/Abbreviations 1 General Hydraulic Profile 1 General Equipment Location 1 Civil Site plan and geometry 1 Civil Grading and drainage 1 Civil Yard Piping 1 Civil Details,tie-in 1 CMI Demolitions 1 Mechanical Demolitions 1 Mechanical Filter,Plan 1 Mechanical Fitter,Sections 1 Mechanical Filter,Details 1 Mechanical Chlorine Contact/Pump Station,Plan 2 Mechanical Pump Station,Plan and Sections 2 Mechancial Details 4 Structural Filter,Plan/Foundation/Sections 3 Structural Chlorine Contact,Plan/Foundation/Sections 1 Structural Pump Station,Sections 2 Structural Details 1 Electrical Site Plan 3 Electrical Riser Diagram,MCC,Controls and Schem. 2 Electrical Details 1 Instrumentation Not Included 31 - Sheets Total 8 80 140 0 0 0 228 2. Prepare contract specifications with CSI format and NSPE General Conditions. 4 40 0 0 0 32 76 3. Meet with City of Winter Garden staff at 60%and 90%completion levels to review the status of the work. 0 12 0 0 0 4 16 4. Furnish three(3)copies of completed contract documents to City of Winter Garden and review with City staff. 0 4 8 0 0 1 13 5. Prepare final cost estimate. 1 8 8 0 0 2 19 SUBTOTALTACSKS2U4.-:E(nat:Design ......: t3 . :: ........... f9: 290< G:�..1PR098\P-8126AB.WB2(05/27/98) , ATTACHMENT A MANHOUR ESTIMATES for CITY OF WINTER GARDEN WINTER GARDEN FILTER AND CHLORINE CONTACT/ PUMP STATION r--- P-8126 Page 3 : task :,......:.: .: „ Task Descri iorJB - :P.M.: Sr.E. Tech CAM. .:.RPR� WP l Total: pt cope of Services i iIIII. BIDDING SERVICES- RECLAIMED WATER SYSTEM IMPROVEMENTS PROJECT A. Provide courtesy sets of bid documents to the City and other entities that will make 0 2 2 0 0 4 8 them available for review by prospective bidders(six(6)sets are anticipated). 1 B. Sell bid documents to interested Bidders and suppliers at cost. 0 0 0 0 0 24 24 C. Prepare for and attend a Pre-Bid Conference with the City. 0 6 0 0 0 0 6 i 1 0. Investigate questions and prepare technical revisions that become apparent during the 2 24 16 0 0 10 52 bid period as an addendum. Review addenda with City prior to issuance. E. Attend bid opening review bid submittals and provide the City with comments and 0 16 0 0 0 4 20 recommendations for award. '. .: .. .., . ..... ... .... SUBTOTALTASKUI BIDDING:SERVIGES . .. RECLAIMED WATER SYSTEM:i1MPROVEMENTS PROJECT 2 :48 18 tY 0 42 •.110 >. ... .... : . ......TOTAL..rMSKS...... OtJGffllli. 21... 338., ::292 Q :0. .:AVVii ... T4:a G:'..1PR098\P-8126AB.WB2(05/27/98) CO r CO O O O 141 • 0 U1 0 L O O 10 LO 0 y ` r 11 r 69 69 r 01 0 N 0 M N Ln r 01 01 p:V; Cl �. CO M COU, CO N r N r r CO.. 0 _ I _a'.�.::0 . N CO- vi d CO .:: ^ 69 69 69 69 69 69 r CO Nco .V X694 4 4 CO N2:.::':..' J m • 0) o v 69 69 N m .CY:0' 69 69 69 r � U. 69 • N 0.Q..: r M CN) O O N CO N 0:Q N M N r N CC 0 et O 0 0 O 0 c[ O 0 c[) O et Q: 0 N 0 0 0 0 69 N c) UCN 4) NQ CV Me LO � (0 N oro 0 0 0 (.4 o 43 t O 69 69 69 69 H o W C r N + : N O , OI0 0 0 0 . 0 0 0 0 0 0 0 O Ce a O O . 69 O 10 0 Lr) cA M N O }} N N to 0 0 O r N 6H 69 69 69 6n 1: 0 CSE— A M � � ooa) � 43 � � .°0n to to vi : Er V Tifii.Q . r r r M M H • F' Z_ O N CO OI 0 0 0 0 U) 0 0 0 0 0 tO M m V aQ. co c1n 69'' 69 69 69 69 N `3 • b4 (N (N � r - too ~ 0 Z N N CO0v O O N M N a0 69 Co r 69 69 .... 69 W H H m o co = UJ V rr o ol' 0 0 0 0 - 609000000UM N 0) 0 0 0 0 0 to 69 Lt) 0 u) u 0 ! 01 a wV Q CO 10 o, 0 0 LO 1) . 69 r 69 69 et , 1. EeO aOOOCA OM r N M N 43Co 69 w .w G CO N E9 9 69 69 9 9 MZ H etQ : wa np Ce Q W • w — J 3 ` 4J COO COO 10 O N O 0 Cl) Z Q c�i N N .cO tri ca N- G _ 69 69 69 69 69 44, Z W Q V1 iii N 5 � g W c 0 p CO W .Z _jI- d•cc1- I- o a wv o ZgoU - J O CL u) am cltoSH = 0 n li C m �► Q ? ill c H iv ::Ct O O < l- J w m v o m m J O .Z v a a. n y 0 m oga v � c' s- .� w 0 0 w o; a� ct °3 0 � 1- U3 CS U a) = a ac, ( Q 0o g � � wx TO" W F.- CL � o 0 H N N cu � _jw 7/.711. L � � c O 00 � � Qm 0 73 00 2 0 H H HCC 5 Q) v) a) 2 •= aD ;32 - 0 oa'o W a) gal .0 s .. O O y rn C. 0 o 0 0 0- SIL aa)) o Cl. Q 0 a < < CC 6 aa)) ° Q d a_ D D m H 2 o = aa) ami o a) a) o c O O a a. U) I— U CC S u) U) v) 0 w co cn 0 O U H a. lL , t- i— d I ATTACHMENT A MANHOUR ESTIMATES for CITY OF WINTER GARDEN WINTER GARDEN FILTER AND CHLORINE CONTACT/ PUMP STATION CONSTRUCTION ADMINISTRATION (CA) CONSTRUCTION PHASE SEf#VICES P-8130 Page 1 Task. :;:. No P meeting. P agendapl ._ Tech CAM RPR " Asst:RPR WP Total Task Descnption/Scope of Services P.M.. Sr. A. Schedule and administer reconstruction Ffe are for, preside over and prepare and distribute meeting minutes of preconstruction meeting. 0 4 0 8 0 0 6 18 B. Make visits to the site at intervals appropriate to the various stages of construction in order to observe the progress and quality of Contractors executed Work. Three(3)visits per month with an average visit duration for three(3)hours. 0 40 0 40 0 0 20 100 C. Review and approve Shop Drawings,Samples and Equipment O&Ms. 0 60 0 12 0 0 40 112 D. Schedule and administer periodic progress and specially called meetings throughout progress of work. Prepare agenda for,preside over and prepare and distribute meeting minutes of periodic progress and specially called meetings. Progress meetings will be held monthly. Number of progress meetings estimated at eight(8)with an average visit duration of four(4)hours. Number of specialty meetings estimated at two(2)with an average visit duration of four(4)hours. Note, observations of progress and quality of Contractors executed Work will be performed as part of meetings. 0 32 0 50 0 0 20 102 E. Review and approve Contractors initial construction progress schedule(s). Updated construction progress schedules reviewed as part of monthly progress meetings. 0 0 0 4 0 0 2 6 F. Review field questions or problems and provide interpretation of Contract Documents. Issue written clarifications or interpretations of Contract Documents as necessary. 0 8 0 12 0 0 8 28 G. Review and provide comments/recommendations concerning results of tests and inspections performed by project Quality Control Consultant. 0 6 0 8 0 0 4 18 H. Prepare and issue requests for proposals. Review,recommend and assist in negotiation of change proposal summaries. Prepare, recommend and distribute for signatures contract modifications. 0 12' 4 16 0 0 6 38 I. Review and recommend the Contractors monthly application for payment. Number of monthly applications for payment estimated at eight(8). 0 0 0 16 0 0 8 24 J. Observe project start-up Demonstration and Testing. 0 16, 0 8 0 0 4 28 K Upon written request by Contractor,conduct and inspect to determine if Work is substantially complete and prepare and distribute a punch list of items to be addressed,if any. Upon written request by Contractor, conduct a reinspect to confirm that substantial completion punch list items have been addressed. 0 6 0 6 0 0 2 14 L. Upon written request by Contractor,conduct an inspection to determine if Work is finally complete and prepare and distribute a punch list of items to be addressed, if any. Upon written request by Contractor, conduct a reinspect to confirm that final completion punch list items have been addressed. 06 0 6 0 0 2 14 M. Review final Application for Payment and accompanying documentation to determine compliance with Contract Documents. Prepare, recommend and distribute for signature final Contract Modification,if required,reflecting approved adjustments to Contract Price not previously made by other Contract Modifications. 0 0 0 4 0 0 4 8 N. Provide mylar reproducible set of record drawings based upon field data provided by the Contractor and upon information obtained during periodic site visits. Certify completion of construction on prescribed FDEP forms. 0 616 4 0 0 6 32 .TOTAL A THROUGH fit-CONSTRUCTION PHASE SERVICES ::; 0..... .t9f_I 20 194:.. 0-:..... 0 ;132. ;;542 , G:\...1PR0981P-8130AB.WB2(06/19/98) • O CO M N O O to co • coo 0 0 0 0 (n to o co r (A c) CO (D EA EH N 0 0 0 0 tl) (n u) 0 N N 0 0 N Qa] ° UT 07 O (D N N (0 EA EA EA to EA EA Ps : EA . 4 Cl U N 1- (f! fV N et FA V! o CA .. 69 to Mf/! 1 EA b9 N M N �. __ • _ ) O r) .- 0 0 0 v CO O O 0 0 0 0 0 u1 cn 0 `J U) (n N- (n EA EA CO : O o O LOU" to 0 N N 0 N cn co u) co N (o EA EA EA to EA EA C::DI O to 'Tt r N N N d' EA ER cy 3. ° EA EA EA EA EA EA TI (D N { 0 0 O 0 ON CD O o c) 1,... O za .wm , l ixav� € Z C.9 H- O Q � LU `to ) . F- ,-'W ZZ _'cn _ O z: I- O w < Z Z O . O } z;. _ 17 � 2 , E = 0J U U) 0 w _ n<: y < . 0 c.w 0 L. D to.Z U Z :::z:.: HQ Q9- t) I- IX oaW� _, w LU 0 H z 0 �ce .. ....... U ;.: o 0 in o (n 0 •a* Q Lu c...c6 co co to o N 00 O () cg r- CO CO ui (o 6 (N -- • O. Z _ CNI N6969 teV c ce o Q � gQ . Q0, (I)ce � L1 S = a a z. p �:u1 -Ft- ...I Ce O CJ :F- w OF Ow rw, rno 0 ❑ :Q c ° co OUIs 15 G p ca Dm O Eci0 2 0w Oic o 5 = m fo. U). c ( W F p c„, O F Nn • 0ai p `' ` m a O a ° °' Ct Q c) Q Q Z i f- : Q o O- 0 H (O c J w: a c� m c o J c J J -r _cc ul •t.. V) M Ill ° U) COm cc ao co M w a_ I- F- 1- G X. a) U) H , a`) c U) 1 V CO tr 000 tt W W Cl.)CIIO 'cv 5 t a) p) J J o a •o •c 2 N a m m CO =: 0_ E aa)) a y x H; 1a- a - a) a) Q a. u) -, DDM H :: 2 0 0 o a) o co 00> a. cn F 0 cc ¢ cn u) u) 0...:::.' w co ct U i- eau. 1- 1- d CITY OF WINTER GARDEN WINTER GARDEN FILTER AND CHLORINE CONTRACT/PUMP STATION CONSTRUCTION ADMINISTRATION(CA) CONSTRUCTION PHASE SERVICES PROPOSAL CONDITIONS 1. PEC will not be required to make exhaustive or continuous inspection$on the Site to check the quality or quantity of the Work. If due to required exhaustive or continuous inspections the total estimated manhours in this proposal is exceeded, additional construction phase services authorization will be required. 2. PEC will provide review of the initial shop drawing,sample and equipment O&M submittal and one resubmittal for each individual item requiring submission by the terms of the original Contract Documents. PEC will record time required by PEC and PEC's Consultants performed for additional resubmittal review(si If due to additional resubmittal review(s)the proposed task estimated manhours is exceeded, additional construction phase services authorization will be required. Contract Documents will require that the cost of additional resubmittal review be reimbursed by the Contractor to the Owner at PEC's standard hourly rate(s). 3. PEC will record time required by PEC and PEC's Consultants in eivaluating Contractor proposed substitutes and in making changes in the Contract Documents,if required. Whether or not PEC approves a substitute item so proposed or submitted by Contractor, the cost of evaluating Contractor proposed substitutes and in making changes in the Contract Documents,if required,will be reimbursed by the Owner at PEC's standard hourly fate(s). Contract Documents will require that the cost of evaluating Contractor proposed substitutes and in making changes in the Contract Documents,if required,be reimbursed by the Contractor to the Owner at PEC's standard hourly rate(s). 4. The project Quality Control Consultant will be provided by Owner. 5. Should PEC perform more than one substantial or final reinspection(s)due to failure of the work to comply with the claims of status of completion made by the Contractor,additional reinspects n(s)may require additional construction phase services authorization. PEC will record time required by PEC and PEC's Con,ultants performed for additional reinspection(s). If due to additional reinspection(s) the proposed task estimated manhot rs is exceeded, additional construction phase services authorization will be required. Contract Documents will require that the'cost of additional substantial and or final reinspection(s) be reimbursed by the Contractor to the Owner at PEC's standard hourly rate(s). 6. As a basis for this proposal it is assumed that PEC will provide the services required to process two(2)requests for proposals, two(2)change proposal summaries and two(2)contract modificatipns. PEC will record time required by PEC and PEC's Consultants performed for additional(over two(2)of any)proposals/summaries/modifications services performed. If due to additional proposal/summaries/modifications services performed the total estimated manhours in this proposal is exceeded, additional construction phase services authorization will be required. 7. All contractor proposed changes to the Work shall be considered as substitutes. The evaluation of substitutes will be as addressed in the Contract Documents and as detailed in Item No.3 above. 8. Certified Operations and Maintenance Manual addressing plant upgrades/revisions has not been addressed in the proposal. If Certified Operations and Maintenance Manual is to be provided adcitional construction phase services authorization will be required. 9. This construction administration services proposal is based on a not-to-exceed 300 calendar day construction period with non- overtime forty(40)hour work weeks. 10. If the Contractor works overtime outside the established regular working hours,as established by the Contract Documents, additional construction services shall be reimbursed by Owner at PEC's Standard hourly rate(s). The Contractor will be required by Contract Documents to reimburse Owner for these additional construction administration services costs. 11. Additional construction administration services will be required in connection with excusable contract days for which time extension to the original construction period is granted to the Contractor by the Owner. 12. Additional construction administration services costs associated with non-excusable contract delays shall be reimbursed by the Owner as part of Liquidated Damages to be received from the Contractor. Construction administration services costs are estimated at S200.00 per working day. Liquidated Damages should be established that take into consideration this cost. G:\...\PRO98\P-8 130.ATT (05/29/98)