VI (E) DISCUSSION/ACTION RE: Forest Oaks and South Water Treatment Plants, Well Pumps and Ground Storage Tanks Project, Bid No. B96-05, Change Order Request No. 1, Wharton Smith, Inc. AGENDA 10-02-'26 ;Ocoee o� , - - Item VI E v 1 0 *AE41 `>a``�, JAMES W. SERA,P.E. OF-coo° CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE.OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142.FAX(407)656-7835 MEMORANDUM DATE: September 26, 1996 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. 41,,/ City Engineer/Utiliti-. I irector SUBJECT: Forest Oaks and South Water Treatment Plants Well Pumps and Ground Storage Tanks Project,Bid No. B96-05 Change Order Request No. 1 Attached for your review is Change Order Request No. 1 on the Forest Oaks and South Water Treatment Plants Well Pumps and Ground Storage Tanks Project, Bid No. B96-05. This change order request was initiated by City staff due to operational problems at the treatment plants that occurred after PEC had completed design and the City was in receipt of the bids for the improvements currently under construction. This additional construction request initiated due to a multitude of cascading problems. For approximately three months in the spring of this year, we experienced periods of operation when all four high service pumps were operating at the South Plant and we were unable to maintain system pressure in the southern portion of our distribution system even with the Forest Oaks and Jamela Plants on line. In May of this year, the variable speed driver on one of the high service pumps at the Forest Oaks Plant went out of service and needed to be replaced. Due to the age of a similar high service pump at the Forest Oaks Plant, it is anticipated that its variable speed driver will need to be replaced in the near future. Additionally, the City has been experiencing excessive growth over the past few years,this growth rate is above what PEC had projected in the Water Master Plan. With the addition of the West Oaks Mall and the potential additional growth in that portion of the City,the addition of these pumps and controllers are needed so that the City can continue to provide drinking water and fire protection to the residents and businesses in the manner in which the City has in the past. PEC had foreseen these type of improvements and had proposed recommendations in the Water Master Plan as a near-term future project, but the growth within the City has accelerated that time schedule to a more immediate need. PEC has proceeded with the design of the needed improvements and has negotiated with Wharton-Smith, Inc. for the change order. PEC has recommended that the change order be THE PRIDE OF WEST ORANGE Gd The Honorable Mayor and Board of City Commissioners September 26, 1996 Page Two approved as negotiated with the intent so the contractor can order the materials in a timely manner to facilitate installation without requesting a time extension. The change order request is for$261,086.33, and does not include a request for a contract time extension. This represents an increase of 11.33% over the original contract price of$2,304,000. Although this amount is over the project's budgeted contingency amount of 10%, there are sufficient funds in the operations account to cover this overrun in the Contingency Fund. The alternative to change ordering this work into Wharton-Smith's contract would be to wait until Wharton-Smith has completed their work at the plants and advertise this work as a separate construction project. This would entail the preparation of complete contract documents, technical specification and design drawings,the advertisement/bidding process, complete construction process and field inspection services. Besides the additional engineering costs associated with making this a separate project, the construction dollars would also increase due to contractor mobilization, administration, demolition of some equipment being installed by Wharton-Smith, instead of"swapping out"prior to installing, and construction around equipment installed by Wharton-Smith under the current construction contract. Staff concurs with PEC that the Change Order route is most cost effective, less time consuming, and will have the equipment in place by next spring than the separate bid alternative. I recommend that the City Commission approve Change Order No. 1 by increasing the contract amount by$261,086.33, with no extension in contract time, and authorize the Mayor and City Clerk to execute Change Order No. 1. Attachment • * Adjustment as of Change Order No. 01 Change Order No. 00 (Short title of Change Order) CHANGE ORDER FORM PROJECT: 170MRIP,MicRAMMPAWPacmtvitumm.4,NP :001441$1P41.50,4§ CHANGE ORDER NO. 01 DATE: September 25, 1996 CONTRACTOR: Wharton-Smith, Inc. OWNER: arTOPTieriSSMOVIDA. AGREEMENT DATE: May 9, 1995 The following changes are hereby made to the CONTRACT DOCUMENTS: Original CONTRACT PRICE $2,304,000.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $2,304,000.00 Net Increase (Decrease) Resulting from this CHANGE ORDER $261,08633 The current CONTRACT PRICE including this CHANGE ORDER $2,565,08633 ORIGINAL CONTRACT TIME: 270 Days Date February 3, 1997 Current CONTRACT TIME adjusted by previous CHANGE ORDERS* Date February 3, 1997 Net Increase Resulting from this CHANGE ORDER Days -0- Current CONTRACT TIME Including this CHANGE ORDER Date February 3, 1997 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITIONS,SUPPLEMENTARY CONDITIONS,SPECIFICATIONS and all parts of the Project Manual listed in Article 1,Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. Change Order No. 01 II. REQUIRED CHANGES Extension of Contract Time By this Change Order, Section 00500, Agreement, Article 3, Contract Time, shall be modified as follows: 3.1 Delete in its entirety and insert the following in its place: "The Work shall be Substantially Completed (success pressure testing and bacteriological testing of completed potable water pumping station and completion of acceptable potable Water Demonstration Test of the completed facility which shall include,High Service Pump additions addressed in Change Order No. 1) in Two Hundred Fifty Four(254) consecutive calendar days from the effective date of Notice to Proceed as provided in paragraph 23 of the General Conditions (Commencement of Contract Time; Notice to Proceed)." 33 Shall be Modified as follows: Delete - •... substantially completed on or before January 4, 1997 ..." Insert - Substantially complete on or before January 17, 1997 ..° Item 1-A Item 1-A Forest Oaks WTP -Replace the 100 HP motor on existing HSP No.3 with a 125 hp motor,replace existing HSP No. 1 and install HSP No.4,construct new precast meter vault with a 16" propeller meter, and furnish and install new Consolidated Electric model 620 control system. South WTP - Furnish and install HSP No. 5 and a Consolidated Electric model 620 control system. One spare model 620 controller shall furnished to the Owner. �• JUS I'U ICATION Extension of Contract Time Extension of project substantial completion date required to allow High Service Pump Work additions to be installed and demonstrated. Item 1-A Item 1-A High Service Pump changes at Forest Oaks WTP and South WTP included under this contract per Owner request. • is • • IV. PAYMENT Change Description Net Increase Unit Unit Price Net Increase Order Item (Decrease) (Decrease) No. Quantity Price 1-A HSP Changes at Forest Oafs WI?and ill LS S261,08633 S261,08633 South WTP Total Net Increase(Decrease)Change Order No.1 S261,08633 V. NARRATIVE OF NEGOTIATIONS Extension of Contract Time The Contractor agreed to perform work in accordance with the Engineer's projected construction schedule which extended substantial completion date 14 calendar days. No change with regard to final completion date is made. Items 1-A Item 1-A RFP No.2 detailing required HSP additions was transmitted to the Contractor by the Engineer on August 19, 1996. The Contractor transmitted CPS No.2 on August 28, 1996 at total reimbursement value of$284,106.25. Negotiations lowered total value of Work to $261,08633 (More basic pump and motor package at $250,323.85 plus Engineers recommended optional items at a value of$10,762.48). Final values are represented in Engineer's Recommendation of September 19, 1996 and CPS 2A. VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Council. 3 Acknowledgments: • The aforementioned change, and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. Change Order Request by: MITAKEINA. Change(s) Ordered by: City of Ocoee RECOMMENDED BY: ACCEPTED BY: PROFESSIONAL ENGINEERING CONSULTANTS, INC. 1�,�.4e-gm✓- /d✓o Engineer Contr or ,,�eo By: / �• , By: /00177.:- G�"I y Signatur Signature Date: 9/0 96/ Q Date: 1�2-5( (Q Title: L.;4_rt`•l..c-iii414, iinv�� Title: ✓R_ APPROVED BY: - C"dfti ' e`EV riil Owner By: Signature Date Change Order No. 01 • G:\CLER\CONSI\OE1OE-238\001N.CO 4 • • PEC/PROFESSIONAL ENGINEERING CONSULTANTS,INC. Suite 1560,Bola Park Centre Job No.: OE-238-3.0/3-6.3 200 East Robinson Street Time: 3:00 PM • Orlando, Florida 32801 Date: September 19,.1996 (407)422-8062 • • To: James Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 P.ecomnmendation by Engineer: (Forward ioOwner for Review) This correspondence details results of:re-negotiation of Cost Proposal Summary(CPS)No. 2 in reference to Request'for Proposal (RFP)No. 2. Summary of attached CPS No. 2A follows (Note, value of Cost Plus Markup): - 1. Direct Labor: The Contractor agreed to reduce Direct Labor Cost by SI0,350.00. Same shown in CPS No. 2A as a Lump Sum Credit. 2. Materials and Equipment: a. Pumps and Motors: • The following tables provide cost information for optional equipment. Note, costs plus markup shown [sales taxes(6%) and Contractor Materials and Equipment Markup (15%)]. Pump and Motor Option Table • Description 4"-5823,50-hp 6"-5823,125-hp S°'-5823,ISO-hp Cost Plus Markup Cost Plus Markup Cost Plus Markup Wear Rings Bronze S172.68 S211.50 5290.82 Structural Stiel Base 51,229.00 • S1,445:03 . $3,445.03 Prtssuc Gauges with Snubbers : S38235 - - : S38235 • $38235 .. . . •-.. . and Valves .. .. = - - - VP1.11000 Coating • 5575?A _;_ =`='S935.43 •: - S],230.00 S13 Hardware SI34.03 :._` - S134.03 . S134.03 - Shod Commercial Tcst . S39.63 S39.63 - S39.63 . EEP-74 l+NE 16;43 CITY otr.ISE GINE' f i 40'7 S5G 7E35 P.03 Spare Motor and Check Valve Option Table Description Cost Plus Markup Spare 12S-hp Moire Motor w!No Options-S3,393.25 • Cost DitTerenca between 10"Slanting Disc la 10" S4,29492 • Weighted Lever Check Valves Cost Difference}wean 12"Sisnting Disc&12" SS,390.67 Weiehted Lever Cheek Valves b. Gravel: • The Contractor agreed to reduce cost for same by S1,150.00. 3. Subcontractors: (No Change from CPS No. 2) ' 4. Consultants: (No Change from CPS No. 2) 5. Fee Structure: If all equipment options are included the total value of CPS No. 2A would be S272,606.25. This would include spare motor with all options and slanting disc check valves. If PEC minimum additional recommended options are included the total value of CPS No. 2A would be S261,086.33. This would include Pump and Motor bronze wear rings and stainless steel hardware options and.10" and 12" slanting disc check valves. If all equipment options are not included the total value of CPS No. 2A would be S250,324.00. No spare motor is included in this value. Weighted lever check valves are included in this value. 6. PEC Recommendation: • With the understanding that the City of Ocoee is interested in reducing the cost of the Contractors Cost Proposal Summary(CPS)No. 2 as much as possible,PEC recommends that the City accepts the more basic pump and motor package with bronze wear rings and stainless steel hardware. As the capacities of the proposed HSP No. 4 at Forest Oaks and the proposed HSP No. 5 at South Plant are appreciably greater than the capacities of the existing pumps,the chance for slamming is also appreciably higher. Therefore, P recommends installation of slanting disc check valves. Date: 7 -2O-16 Signature of,Engineer: YR‘. Signature of Construction Administrator �/ri! Date: )// eceptarice by Owners (Reltrrn re' neerFo Pnoc . `.The'.City"of Ocoee 'authorizes PEC to proceed-with preparation of formal submittal of this change order request for. approval by the 'City." The option which has been selected includes the slanting disk check valves. bronze wear rings and stainless steel hardware; as sj,ecifie for the total amount of $261,087.33. To get this change order on the commission agendaL we need the submittal returned no later than end of of the d y Th rsday (9/26/96). Signature of Owner's Authorized Representative: �,/, 4''''. Date: `"/f, ' . —by�ts CITY OF CCCEE NC I N E I M.1 40? 656 785 P.01 CITY OF OCOEE 150 North Lakeshore Drive • Ocoee, Florida 34761-2258 i ► • SEP 2 41996 FAX NO. (407) 656-7835. sTO: jaoloch- 2u clicl . �, ..ems j r ( Grp_ L� 7 ��.:�'�� � �� 'FE FROM: cAJ h e.�. - � �� c 1—Z3 DATE: q)0/ 7' La_ NUMBER OF PAGES SENT (not including cover sheet) Special Instructions: If you do not receive the complete packet, please call Jeanne Washington at (407) 656-2322 Ext. 142. Thank you. PEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC. Suite 1560, Eola Park Centre Job No.: 0E-238-3.0/3-6.3 200 East Robinson Street Time: 3:00 PM Orlando, Florida 32801 Date: September 19, 1996 (407) 422-8062 0 To: James Shiro, P.E. City Engineer/Utilities'Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 Recommendation by Engineer: (Forward to Owner for Review) This correspondence details results of re-negotiation of Cost Proposal Summary(CPS)No. 2 in reference to Request for Proposal (RFP)No. 2. Summary of attached CPS No. 2A follows (Note, value of Cost Plus Markup): 1. Direct Labor: The Contractor agreed to reduce Direct Labor Cost by $10,350.00. Same shown in CPS No. 2A as a Lump Sum Credit. 2. Materials and Equipment: a. Pumps and Motors: The following tables provide cost information for optional equipment. Note, costs plus markup shown [sales taxes (6%) and Contractor Materials and Equipment Markup (15%)]. Pump and Motor Option Table Description 4"-5823,50-hp 6"-5823,125-hp 8"-5823,150-hp Cost Plus Markup Cost Plus Markup Cost Plus Markup Wear Rings Bronze S172.68 S211.50 S290.82 Structural Steel Base S1,229.00 S1,445.03 S1,445.03 Pressure Gauges with Snubbers S38235 S38235 S38235 and Valves VPI I000 Coating S575.24 S935.43 ' S1,230.00 S/S Hardware S134.03 S134.03 S134.03 • Short Commercial Test S39.63 S39.63 S39.63 7-1 Spare Motor and Check Valve Option Table • Description Cost Plus Markup Sparc 125-hp Motor Motor w/No Options-S3,39325 Cost Difference between 10'Slanting Disc&10" S4,294.92 Weighted Lever Check Valves LCostDifference between 12"Slanting Disc&12" S5,390.67 Weighted Lever Check Valves b. Gravel: The Contractor agreed to reduce cost for same by$1,150.00. 3. Subcontractors: (No Change from CPS No. 2) 4. Consultants: (No Change from CPS No. 2) 5. Fee Structure: If all equipment options are included the total value of CPS No. 2A would be $272,606.25. This would include spare motor with all options and slanting disc check valves. If PEC minimum additional recommended options are included the total value of CPS No. 2A would be $261,086.33. This would include Pump and Motor bronze wear rings and stainless steel hardware options and 10" and 12" slanting disc check valves. If all equipment options are not included the total value of CPS No. 2A would be $250,324.00. No spare motor is included in this value. Weighted lever check valves are included in this value. 6. PEC Recommendation: With the understanding that the City of Ocoee is interested in reducing the cost of the Contractors Cost Proposal Summary (CPS) No. 2 as much as possible, PEC recommends that the City accepts the more basic pump and motor package with bronze wear rings and stainless steel hardware. As the capacities of the proposed HSP No. 4 at Forest Oaks and the proposed HSP No. 5 at South Plant are appreciably greater than the capacities of the existing pumps, the chance for slamming is also appreciably higher. Therefore, P recommends installation of slanting disc check valves. 7 �20' Signature of Engineer. I Q Signature of Construction Administrator. DDate:ate: �// �; Acceptance by Owner: (Return toE . eerForProc • ' Signature of Owner's Authorized Representative: Date: ❑Engineer to Prepare Necessary Change Order 0 Engineer to Re-negotiate Change Proposal as Noted Above ❑ Other as Above Copies To: ' James Shira, P.E. From: Robert P. Rudd, Construction Administrator f David Wheeler, P.E. PEC/PROFESSIONAL ENGINEERING CONSULTANTS,INC. David Gosnell ❑ Robert Holland ❑ Ted Moore Murlin Jones ❑ Todd Swallows ❑ Tom Kelley, P.E. ❑ Ken Hooper ❑ Art Austin, P.E. 221 Geoff Hennessy ,' Don Tilton Robert P. Rudd • • _ 7L'r-, s r—zO 10 $ a 2 4-rcu1.wl-IAK1UN S1 ITH ID.407323123S PACE 1/: si PEC/ PROFESSIONAL.:- .)GINEERING CONSULTANT , NC. CHANGE EOLA PARK CENTER,200 E.ROBINSON ST.,SUITE 1560,ORLANDO,FLORIDA.32501 PROPOSAL . AFFILIATE FIRM:PECIW.K.Daugherty Cortsutting Engineer• SUMMARY 'engineers planners surveyors NO.: • 2A -fie±_. , :. 3:::�,y�,.o:!: is�1.j ,,:;t1:.: ::E_:,'i:.w'.::Y're !':•]�i.......S .___„ >: --n�...:..+.i�C.:��',+T`.• :.l.:..:.� .. ... •' ��'.:F��r'l.t+i�.: .?•:.ti' ".5. yn.7',:',:.. _'_+►'::.:`:sue ._.. :r.L=+_:+.:... .--'w..:...�:.9u..a.;7:.4 ... •.:.�?I si.47uf.. ,dL'� �{':.,::.:t:. ✓_-ri^a....�:,er.. [PROJECT NAME: Forest Oaks&South Well Pumps&Ground Storage Tanks PROJECT NO.:OE-233-3.0 LOCATION: Ocoee, Florida DATE: AUGUST 25,199f OWNER: City of Ocoee,Jim Shin DRAWING NO.: RFP1,2,3,E3,4,5,' OTHER SPEC.SECTION:11211,151298,1690( R E F E R E N C E: RFP NO.: 2 WORK DIRECTIVE NO.: FIELD ORDER NO.: OTHER: DESCRIPTION: Forest Oaks WTP: Replace the existing 100 HP on HSP No.3 with a 125 HP motor, replace existing HSP No. 1, furnish and install HSP No.4,construct new precast meter vault with a 16" propene furnish and install new Consolidated Electric model 620 control system. South WTP: furnish and install HSP No.5 and a Consolidated Electric model 620 control system. Existing WTP shutdowns shall be coordinate with the City of Ocoee and shall be minimized. One spare Model 620 controller shall be furnished to the City. PRICING INFORMATION SKILL/TRADE MANHOURS RATE COST 1. DIRECT LABOR Labor I ' 960 MI-1 S 20.00 S 19,200.c 1A PRODUCT LABOR: off operator 40 MH $ 35.00 $ 1,400.c CREDIT LUMP SUM S (9,000.( 0 MH S 20.00 S 1.B11FOREMAN X SURERINDENT a"P i:�; , 320 MH S 45.00 S 14,400.c 1.0 FIELD ENGINEERING: .-SL,.. 11.1g1M.4r 64 MH S 65.00 S 4,160.( 1.D EXPENSES :Tft3CC•. vn.;_r �'%^_,:x':r:,ic ti it µ�630 4 C7 S 1,200.( SUBTOTAL(1) S 31,360.( 2. MA-ERIALLSpp AND E''QUIPMEN- DESCRIPTION ! QUANITY UNIT PRICE COST 2 ALiNCIAIZs/I3 DIN r^/ORK: PUMPS & MOTORS 1 LS - S 41,340.( P.E.C. DIC, ORLA)1 PIPE&ACCESSORIES I 1 • LS I S 41,949.E Y/OAK COPY O N CUT&FILL 1 LS S 3,9660.( METER VAULT 1 LS S 6,064.( ORIGINATOR I Rpg - GRAVEL 1 LS S 2,600.0 ONE COPY& ROUTE TO: CONCRETE& REBAR 1 ' LS S 2,500.0 . ,ken Neo le- WET TAPS MATERIALS WITH SEMCO PRIC LS S - Kj FLOW METER 1 LS S 5,300.( -3 5 -_'�-"- ^•ORMWNCE: SMALL TOOLS 1 LS S 250.0 Ol t9 pr�- -s BACKHOLE, MUDHOG 1 LS S 1,000.0 TO 3-6.3 CRANE,TAMPER, B-CAT 1 LS S 2,000.0_ 2.D DIRECT COSTS: FUEL. OIL,GREASE 1 . LS S • 200.0 2.E BONDS,INSURANCE •? r, ki-i+,= a= _'tj;T�-._,' '" A r- LS $ 3,226.0 I SUBTOTAL(2) .S 110,389.0 3. SUBCONTRACTORS NAME DESCRIPTION OF WORK ! COST 3.A DIRECT: 'ORANGE ELECTRIC UPGRADE CONTROLS TO 620 S 67,800.0 CENTRAL FL TAPPING LABOR & EQUIP. FOR 2EA 16"TA S 5,275.0 UNIVERSAL PAINTING PAINT EXTERIOR METER VAULT S 6,300.E AND EXPOSED PIPES IN BUILDING 3.8 LOWER TIER SUBTOTAL(3) $ 79,375.0 P EC/FFORP.VCON ST/00365 ace . AL crew new AK Jun Sri Z01407323123B PACE 212 • A. CONSULTANTS f NAME f DESCRIPTION OF WORK ( COST e-� ISUBTOTAL(4) 5. FEE STRUCTURE NAME ' i COST ' PERCENT [ FEE A. Centractof 1. Direct Labor, S 31.360.00 15 S 36.064.00 2. Material and Equipment $ 110,369.00 15 S 126.947.35 • B. Subcontractors: ORANGE ELECTRIC `S 67,800.00 10 S 74,580.03 CENTRAL.FL TAPPING S 5,275.00 10 S 5,802.50 UNIVERSAL PAINTING S 6.300.00 10 S 6.930.00 SUBTOTAL(5) S 250,323.6.5 TOTAL COST OF THIS CHANGE PROPOSAL (Ai ai+a:w-+onsua.n++wrenGneres): TOTAL S 250,324.00 EXTENSION OF CONTRACT TIME: As part of tnLs Change Proposal.the Contractor requests an extension of Contract Time of days. Justrticadon:Due to the long teal times on the ma►..r9als inw+Iv. in completing this project we must have the change order negioated in one week.Arry delays wodd jeopardize project completion date of February third. RECORD DOCUMENT 5:~As pert of rate Cnarre Prwosaf.we Con.Kaaa:n sl oto.ide spialcable recard drawing information affected Si 71G change. •- Signed: Tine: Project Man _ Date: 823196 -•Cont3Cor Wharton-Sq 6 R E C O M ME D A T 1 O N bv E N GpII NN E E R.:(Fowardto Owner for Review) Signature at Engines. Date: ACCEPT NCE 8Y OWNE.& (return to engineer for processing) • Signature of Owner's tad Representative.: Date: • Ere Ref ro eceoarr necessary mange wet EnOwe to Re.ne oeste dur a eroes<ss no®d aacvs Omer as awve OWNER: CONTRACTOR: PROJECT ENGINEER NO.: ARCHITECT: • OTHER: DATE: T.TfYir!i R'�lTY.�-1•A't:grin.RQR larSt1'-,�'4••ao,r .re.v...- Tim[rr•Y'1I_'.w�Af�v+ !w�...r,.n.wi��.MIY.'�7 1_._..e, .- ,.a,... PEC.FCRKSCONSt OMSFrRM FCCACS2 EOLA PARK CENTER,200 E.ROBINSON ST.,SUITE 1560,ORLANDO,FLORIDA 32801 PROPOSAL AFFILIATE FIRM:PEC/W.K.Daugherty Consulting Engineers SUMMARY 1e9r3 •.,,..-.7.•y2+.7.;:i;L ,,,, ' ... ....- ., - ....,ryS1.• _..t;..r!d,ti-.. , ,.:.!.."WV....:. ,O. •'o;:d;J plannerssurveyors N 2 J.\ ,.1 ..�� �;J`.:l .-:�:•._w. r. .a.. -•� � 1 sy J- 'yZ ... l,m •.%3 _�a�1 .1 )JECT NAME: Forest Oaks&South Well Pumps&Ground Storage Tanks PROJECT NO.:0E-238-3.0� ATION: Ocoee,Florida DATE: AUGUST 28,1996 JER: City of Ocoee,Jim Shira - DRAWING NO.: RFP1,2,3,E3,4,5,7,8,i ER: SPEC.SECTION:11211,15129B,16900 :E R E N C E: RFP NO.: WORK DIRECTIVE NO.: FIELD ORDER NO.: OTHER: - -• ; :RIPTION: Forest Oaks WTP: Replace the existing 100 HP on HSP No.3 with a 125 HP motor, replace existing HSP No. 1,furnish and install HSP No.4, construct new precast meter vault with a 16°pro.eller meter, furnish and install new Consolidated Electric model 620 control system. South WTP: furnish and install HSP No. 5 and a Consolidated Electric model 620 control system. Existing WTP shutdowns shall be coordinated with the City of Ocoee and shall be minimized. One spare Model 620 controller shall be furnished to the City. PRICING INFORMATION • SKILL/TRADE MANHOURS RATE COST RECT LABOR Labor 960 MH $ 20.00 $ 19,200.00 1.A PRODUCT LABOR: BH operator 40 MH $ 35.00 $ 1,400.00 0 MH $ 20.00 S - 0 MH $ 20.00 $ - 1.BElFOREMAN X SUPERINDENT Foreman .'` 320 MH $ 45.00 $ • 14,400.00 1.0 FIELD ENGINEERING: Superintendent 64 MH $ 65.00 S 4,160.00 1.D EXPENSES TRUCK .2.2t:. i Ky MTHS- ;$5 600.00 i S 1,200.00 SUBTOTAL(1) ,S 40,360.00 ,TERIALS AND EQUIPMENT DESCRIPTION QUANITY UNIT PRICE COST 2A INCORPORATED IN WORK: PUMPS& MOTORS 1 LS $ 54,196.00 PIPE.&ACCESSORIES 1 LS $ 48,469.00 CUT& FILL 1 LS $ 3,960.00 METER VAULT 1 LS $ 6,064..00 GRAVEL 1 LS $ 3,600.00 CONCRETE&REBAR 1 LS $ 2,500.00 WET TAPS MATERIALS WITH SEMCO PRfC: $ - FLOW METER 1 LS S 5,300.00' 2.B CONSUMED IN PERFORMANCE: SMALL TOOLS 1 LS $ 250.00 2.0 EQUIPMENT: BACKHOLE, MUDHOG 1 LS $ 1,000.00 CRANE, TAMPER, B-CAT 1 LS $ 2,000.00' 2.D DIRECT COSTS: FUEL, OIL, GREASE 1 LS $ 200.00 ;r. -='� $ 3 226.00 2.E BONDS,INSURANCE: ��,',��,_=�:`==e.:F`.K, ./+.-�`,���i`�-�=g� ���":�s-:.•��.-<:=�'Z? L , SUBTOTAL(2) S 130,765.00 . • (CONTRACTORS NAME ! DESCRIPTION OF WORK COST 3.A DIRECT: ORANGE ELECTRIC UPGRADE CONTROLS TO 620 $ 67,800.00 CENTRAL FL TAPPING LABOR & EQUIP. FOR 2EA 16°TA $ 5,275.00 UNIVERSAL PAINTING PAINT EXTERIOR METER VAULT $ 6,300.00 AND EXPOSED PIPES IN BUILDING 3.B LOWER TIER: • 1 SUBTOTAL(3) $ 79,375.00 IM/CONST/00865 -_-..-, 4, CONSULTANTS NAME DESCRIPTION OF WORK 1----870fr7---- • • . . SUBTOTAL(4) . • 5. FEE STRUCTURE NAME - COST 1 PERCENT FEE • • _ A. Contractor -._ • 1. Direct Labor: $ 40,360.00 15 $ 46,414.00 . 2. Material and Equipment $ 130,765.00 15 $ 150,379.75 B. Subcontractors: ORANGE ELECTRIC $ 67,800.00 10 S 74,580.00 CENTRAL FL TAPPING• S 5,275.00 10 $ 5,802.50 UNIVERSAL PAINTING S 6,300.00 10 S 6,930.00 • SUBTOTAL(5) S 284,106.25 TOTAL COST OF THIS CHANGE PROPOSAL (All deductions shown in parentheses): TOTAL S 284,106.25 EXTENSION OF CONTRACT TIME: • As part of this Change Proposal,the Contractor requests an extension of Contract Time of * days. Justification:Due to the long lead times on the materials involved in completing this project we must have the change order negioated in one week.Any delays would jeopardize — project completion date of February third. .____ ._ .______. ...._ .. ... . . . .. _ ... . . . . ...„. . . . . . . .. . .. . . RECORD DOCUMENTS: As part of this Change Proposal, he Contractor shall provide applicable record drawing information affected - by this change. • Signed: ‘,.....--------- . Title: Projeclanager Date:— 8/28/96 Contractor: Wharton-Smith .._____ , ...._. _ . .. ., . .. . • •- •• • • .- . . ._. • . . . RECOMMEDATION by ENGINEE Ft:(Foward to Owner for Review) /6r . C-5 3-240— suef4t 2 3 0 wa s L3V-'6 Oetalti er r+ ui Whit fri 1.011 re-vric 1(2- a...1 itii lis014 d a itoro?d$11 A Itrit et v 1'4e- p mpi. -Ilia A;11 1-11:c&ece S.Le, I o lc -lat -ave I—e-- g' 4orti4edi-/e-CT - i fferem c'-%. Ze-t-cdee, tatI44r A 5*iiii 15 p re pos4 e-pst 0--6 4- 34, /0 6,2z' A li.1 ?Ec's . 2-i 00d C4.5-t' f reslisi 4te. 1044--fd,7 ,54,;-Hth. tyosed Nfli to6,23— Cemd" age ea 1-.52 1-e4.501440 P e-C. t--e cdoimamars. et- ' c. 12-. pi - •44L-1 erer.orf Eng".i 1 ern A 1..4 sa)-v ram- 171407os -747 If/h Arty,01 ig71i-f-iirs c-2,Kt-1-714L, Iltj.k. g, PM ar-44:01 "' ' 6' Date: /-4.--• IC ACCEPTANCE BY OWNER: (return to engineer for processing) Signature of Owner's Authorized Representative: . Date: Engineer to prepare necessary change order Engineer to Re-negotiate change proposal as noted above Other as above OWNER: CONTRACTOR: PROJECT ENGINEER: FIELD: NO.: • ARCHITECT: OTHER: DATE: PECIFORMS1CON57100865.FIRM F-00855-2 . , . • • • • -• .. . 199250 SE3'�d�C® -- Ge= L.�EF F '' Page a E 9 • L—'t+I A h9 F Q1=IS L.BE IRN" FL_ r 7 -CD eS F'Pt X 4i7-- :.3 s"7ea•:�. '{MA 4 2068 WHARTON—SMITH., INC. (ORL) CHANGE ORDER FOR 08/30/96 P. O, SOX 471028 SOUTH WATER PLANT LAKE MONROE, FL 32747 C/O OCOEE OUR TRUCK 199250 407-830-8393 08/30/96 07:28 172—JOHNSON, KYLE 172—JOHNSON, KYLE CITY U/M DESCRIPTION UNIT PRICE EXTENT ION (1) -- METER VAULT (2) 2 EA 16" X 16" NJ CI TAPPING 2195. 20 4390. 40 SLEEVE (3) 2 EA 16" MJ TAPPING VALVE W/ 3467. 52 6935. 04 BOX NO ACC. (4) 1 ER 16" MJ 11 1/4 BEND 352. 80 ` J52. 80 (5) 2 EA 16" MJ 90 ELL 427. 84 855. 68 (6) 40 EA 16" CL25O DUCTILE IRON L:2. 11 884. 40 PIPE CEMENT LINED FASTITE (7) 1 EA 16" X 14' 0". F X PE DI PIPE 1061_ 76 14161. 76 (8) (9) 1 EA 16" FLG. COUPLING ADAPTER 722. 40 722. 40 STD SHOP COAT & B&N (10) 2 ER 16"FLG PHG ACC SET — 304/18. 8 S. S. 151. 20 302. 40 ( 11) 8 EA 16" NJ. ACCESSORY SET 128. 60 1030. 40 8-16" #1116 MEGALUG F/DI 8-16" MJ GASKET 96-3/4" X 4 1/2" CORTEN T—HEAD B&N :12) • PROPOSED PUMP #i & 414 h nN11!•..1 J1/./Jlhhh I1 r.I /•./•.../ J.J. (CONTINUED) 199250 Page a QTY U/M DESCRIPTION UNIT PRICE EXTENTION ( 13) i EA 6" X 5" REDUCING RUBBER 649.6O ` 649.60 EXPANSION JOINT COUPLING W/ CONTROL RODS 6" X 5" X 6" (14) 1 EA 4" RUBBER EXPANSION - 218. 40 218.40 JOINT W/ CONTROL ROADS 4" X 6" (15) I EA 6" X 0' 6" F X F DI PIPE 143.36 143. 36 (16) (17) 1 EA 12"FLANGED 90 BEND 330. 40 330.40 (18) • 1 EA 12" FLG GATE VALVE R. W. 778. 40 778. 40 (19) 1 EA 12" X 8" FLG ECC REDUCER 414. 40 414. 40 (230) 1 EA 8" RUBBER EXPANSION 3G4.00 _ .364.00 JOINT W/ CONTROL ROD (21) 1 EA 6" DITTO 263. 20 263. 20 (22) 1 EA 10" X 6" FLG ECC REDUCER 252. 00 252. 00 (23) 1 EA 10" FLG CHECK VALVE-L&W 1495.20 1495. 20 (24) 1 EA 10" FLG GATE VALVE R. W. 65120 655. 20 (25) (26) 2 EA 12" X 1" FILLER FLANGE 196. 00 392. 00 (27) 1 EA 10" X 1" FILLER FLANGE 168. 00 168. 00 (28) 1 EA 8" X 1" FILLER FLANGE 145. 60 145. 60 (29) (30) 3 EA 12" FLANGE ACC SET W/ 42. 56 127. 68 HDG A-307 GR B BAN (31) 4 EA 10" DITTO 36. 96 147. 84 (CONTINUED) 46111. ZE 199250 page 3 OTY U/M DESCRIPTION UNIT PRICE EXTENTION (32) 2 EA . B" DITTO 22.4021 44.80 (33) 2 EA 6" DITTO 17. 92 35. 84 (34) - 1 EA 5" DITTO 12. 32 12.32 (35) 1 EA 4" DITTO S. 96 8. 96 (36) PUMP 5 (37) 1 ER 12" X 0' 9" FLG X FLG DIP 347. 20 347. 20 (38) 2 EA 12"FLANGED 90 BEND 330. 40 660. 80 (39) 2 EA 12" FLG GATE VALVE R. W. 778. 40 1556. 83 (40) 2 EA 12" X 1' 0" F X F DI PIPE 347. 20 694. 40 C41) 1 EA 12" X 10" FLANGED REDUCER 420. 00 420. 00 (4.) 1 EA 10" RUBBER EXPANSION 543. 20 543. 20 JOINT W/ CONTROL RODS :43) 1 EA 8" DITTO 364. 00 364. 00 44) 1 EA 12" X 8" FLG ECC REDUCER 414. 40 414. 40 45) 1 EA 12" FLG CHECK VALVE-LAW 2150. 40 2150. 40 46) 1 EA 12" X ,, ' 9" FLG X FLG DIP 420. 00 420. 00 47) 48) 1 EA 20" X 7' 3" FLG X FLG DIP 1204. 00 1204. 00 49) i ER 20" X 12" FLANGED TEE 1803. 20 1603. 20 (CONTINUED) • 10, C Sd. 199250 Page 4• QTY U/M DESCRIPTION UNIT PRICE EXTENTIDN (50) 1 EA 20" FLG BUTTERFLY VALVE 1792. 00 1792.00 W/ GEAR/HANDWHEEL ACTU. & 8 MILS ASPHALT VARNISH LINING (51) (52) 3 EA 20" FLG ACC SET HDG A307 73. 92 221.76 GR B (53) 11 EA 12" DITTO 42. 56 468. 16 • (54) 2 EA 10" DITTO 36. 96 73.98 (55) 2 EA 8" DITTO 22. 40 44. 80 (56) (57) 1 EA LINK SEALS FOR 12" DIP 168. 00 - 168. 00 THRU CORE DRILLED HOLE 16" ID (12 LS425) (58) 3 EA PIPE SUPPORT 3' 0" HEIGHT 196. 00 588.00 (59) (60) 20 FT 1/2"' SCH 80 PVC PIPE SELL END • 0. 32 6. 40 (61) 20 FT 3/4" SCH 80 PVC PIPE BELL END 0. 44 8. 80 • •ar -4- -st- E 8 T I Pi T �+- • :O . eif ELECTRIC COMPANY " INC. • 7.QS WM((IUGLWATIR IJRM • Tit(r(1On+l(6071 293-11z POST OfflCI sox 14777S • C)R1At•II)o.(LUR1UA 328L0.7775 • FAX(4071 290.6641 August 28, 1996 Wharton-Smith, Inc. - Y.O. Box 471028 Lake Monroe, FL 32747 Att: Muriin Jones• . Re: Forest Oaks &South WTP's Well Pumps & Ground Storage Tanks Dear Muriin Per your request we are pleased to quote the following change order on the above referenced Project- I. Furnish and Install the following.items: a. Wire and Conduit as required b. MCC Starter for High Service Pump #4 c. 600 amp Breaker as required d. Modify Existing Motor Control as required e. MCC Starter for High Service;pump #5 f. Disconnect as required for High Service Pump #5 g. Remove D520 at South Plant &Replace with a D620 as required - - h. Consolidated Control Equipment per attached bill of material 2. Connect Only the following items, FURNISHED BY OTHER. a. All Motors and Flow Transmitters . TOTAL QUOTED PRICE: $67,800.00 Note-Any spare controllers add $1,560.00 each. Should you have any questions, please feel free to give me a call at (407)293-1120. Best Regards, lc • •. Ornberg President . tvo:10 • cZ42cot) ZTARIDASID TE;112©&2T2 MC. .19 "Stand[ard Far Quality' CARL W.PETERSON 11340 r*/IL1JP5 HIGHWAY / P.O.BOX 93037 /JACX2Or3VILLE.FLORIOA x2241-3007 0342&O400 • CHAIRMAN FL 030.303.0400 w..Me.n. FAX W4- 00-44 DARRARA L.PETLRSON P C13A .c hAl[w UT6 PRESIDENT i'Pt- .o..ray. s.T.C. u34TAACt AS: • IOTE 017044 RE 1TE1 08/28/S6 )B: VALVE BOX, UNKNOWN IGINEER: UNKROW)t • CD DATE: 08/28/S6 • • 3NTLEMEN: ARE PLEASED TD QUOTE THE FOLLOWING OH THE ABOVE CAPTIONED PROJECT: ;TY. UN. DESCRIPTION PRICE EXT. £ EA 5'x 7'- 6' STRUCTURE W/ AHD 48'x 66' ALUM $6064 $6064 FL00DTIGHT/GASTIGHT BOLTED DOWN HATCH.L • 3AM-REK' GASKET IS HOT INCLUDED W/STORM SEWER STRUCTURES. TOTAL: $6064 ]UBLE JOINT 'RAK-HEK' IS INCLUDED V/SANITARY STRUCTURES. re CERTIFIED FLORIDA DEPARTMENT OF TRANSPORTATION WBE FIRM ++* LANK OU FO THE OPPORTUNITY TO QUOTE, )TATIONS ARE SUBJECT TO CONFIRMATION AFTER 60 OATS. IOBSITE UNLOADED BY OTHERS. A?PLJCABLE TERMS & CONDITIOXS OF SALE ON REVERSE SIDE hMS 2S IS DAYS, NET 30. (PLUS SALES TAX AS APPLICABLE) TARP.NO T,Ta N iiwrill STR CTuanl • er TMRN 14C WLTW[ilt • MI CSIWP M • VICLIAL!L TifCAL KAlM = • L+-[CIAL 1TT $ r ,• • ; -'• 4••. •s11 •r.;"a•i:: •.':w•07:. _••► .. ..•.J NCI 0 0770 • f .. EST.SHIP DATE / /`� • ora �AR+a 91. . • . Ois.AllDo• Fr.LAL ALZ amNO TWA MDlO as00CDQ153. avM g FILM IZ • MOVC-. -Q 7011 DEMO R 711 ODOMAMICl1m1 MS Jca SY(9 114AC SN M,+K.GiOI[ CUSTOMER _ JOB NAME.. • • • .• . \ {�-A R- f S•• 1 4-r Ii<C Oc�.�,�� . Ca��k R 'Pl-4JT ••• R'O'•S. ' '74-t22.cB . • • . , . . . .Li::\KE„1. mis/v:( JU +._i •i•vim:/ o • , • • E ANC 1-1/ 1_ 7o11E,S •. -TELEPHONE-8 -8 393 .3 30. JcR : •PRODUCT •.. 1 _ T QUOTED PRICE : I Qty. Description Material Freight j Unit Total 1 _z . • TAx) Coal Chute 4f ./4 • Per Hour Special Instructions 4 >P < , 2Z-Z3 7 t4 /2 P 11 UCfC L67,4 t) Quote Prepared ey Authorized Representatives Signature • • Gant True p • •kbove prices are quoted from your specifications. This proposal is subject to acceptance- within 30 days tnd in accordance with our terms and conditions listed on the reverse side. • P.S.ICWT./0 Maw TOTa. P.22 SANDERS, ASPINWA3LL9 ASSOCIATES, INC. 2818 S.E. MONROE STREET• BUILDING C•STUART, FLORIDA 34997 • 561-220-2900 . 1-800-247-0880 • FAX 561-220-3088 PEG ' - August 30, 1996 . Mtert-4 t'i�,e�c _ Ocoee Forest(}area WTP Sanders,Aspinwall &Assoc.,Inc. is pleased to provide the following quotation for your c nsidaation. (3)Fairbanks Morse model 5823 split case high service pumps with the following options Pump Options *wear Rings bronze • • * Structural steel base Coupling DdPPin . Pump Test *Pressure Gauges wlsrtubbe s and valves Motor Options US Motor, 480V, 1800-rpm Premium Efficiency •VPI-1000 coating •S!S hardwire Spice Hewers •Short Commercial. Test *Indicates new option not quoted in budget pricing, but now specified. Price includes startup three(3)days and all options as listed above. Not included - Installationn,piping, wiring, anchor bolts, or any material not listed above. • Pricing 4"-5823, 50-hp ill 850 6-2-6"-5823, 125-hp 1S ;1�0" CA S"-5823, 150-hp k 1 0 o-U 4gL 64. • Spare 125-hp motor 41555 Total Price$ As above Pius Tax If Applicable F.O.B. Foster '.Freight Allowed Shipment - 10-12weeks after receipt of complete approval or waiver of submittal data in the Stuart Office. Sanders. Aspinwall& Associates. Inc.Standard Terms of Safe.on the reverse side of this proposal, are incorporated in this submission. soprani of drawing submissions is required.thirty(30)days for approval wr3l be allowed. No hold-bads,cash dxounts.or other credit wfl b slowed. Terms: 'Upon Credit Approval,net thirty(30)days Or at start up whichever conies first. ccepted this day of , 19 Accepted this day of .19 Purchaseray sa+dars,Aapa&Aseod+du.Inc. BY BY Name Title• 77tb Address Prepared B ( t. �� P Y Seta Ropro ernsdvs •SEE REVERSE SIDE FOR TERMS ANO CONDITIONS. ��• � rr�tttrr�G CONSULTANTS,INC. REQUEST FOR PROPOSAL e� ''' EO: PARtK CENTRE 200 E. ROBINSON ST.,SUITE 1560.ORLANDO,FLORIDA 32801 FOR PROPOSED CHANGE Affiliate Firm:PECAV-K Daugherty Consulting Engineers (RFP) engineers planners surveyors NO. 2 \\,u ,\i.\,,, \\,,,.�\},s\ ,\ �\�,,. ,.,�, ,�\ \,vv,,. ..\,v,v.,+\,,..\ .�.,.,w.v•.\.?.v:..n\\,-4:.v::�,v,v\v::::,::? •.�-, v.\v^.w:.. \{•,T:?�vvv:\. �:aoy\a\�\},a\�\a.�,a\,a\,.a\\i;;a:;:a:k•\,.,,\\`\�\\:c:.v?�\„�..\�a<;k:S•\.,.\\?...,,,.., .,,.,y. ,\., v..:..:\:.,.:.S,.,\.n... t\.... .\..\ \ .. .. ... ....... .. ... .. .... .�„a•?•.,. .,?„•?:a,?a..�.,..:::.?:.:::::,•: ;k;v4a�?v rk�`;;;.•}:v::;::,.�\\k v,•:}:?x .?,5:;...}.,•�.�.a�: �k,C b:h:: -PROJECT DATA: NAME: Forest Oaks& South WTP's Well Pumps& Ground Storaoe Tanks PROJECT NO.: 0E-238.3.0 LOCATION: Ocoee, Florida DATE: August 19, 1996 OWNER:. City of Ocoee,James Shiro DRAWING NO.: RFP-1,-2,-3, E-3,-4, OTHER:' -5,-7,-8, -9, • SPEC.SECTION: 11211, 15129B,16900 T 0 (C O N T R A-C T 0 R): Murlin Jones,Wharton-Smith Inc.,750 County Road 15. PO Box 471028, Lake Monroe, Florida 32747-1028 • Please provide the undersigned a proposal for the following change in the work within twenty-one (21)calendar days after receipt of this request- The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees.Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Forest Oaks WTP-Replace the 100 ho motor on existing HSP No.3 with a 125 hp motor, replace existina HSP no. 1,_furnish and install HSP No. 4,_constnuct new precast meter vault with a 16' propeller meter furnish and install new Consolidated Electric model 620 control system. South WTP-furnish and install HSP No. 5 and a Consolidated Electric model 620 control system. Existing WTP shutdowns shall be coordinated with the City of Ocoee and shall be minimized. One spare Model•620 controller shall be furnished to the City. Change Order Type: 0 Deletion 0 Addition 0 Revision 0 Other- ( - • Constraints of Change: Proposed improvements shall be installed and operational by January 17, 1997. Initiated by: 0 Changes in Owner Requirements ❑Unforeseen Conditions 0 Other. ( -Proposal must be received by: Seotember 10, 1996 (22 days from date below). ATTACHMENTS (Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. 5. 3. 6. PROJECT NO.: 3 OWNER James Shiro, City of Ocoee 0 CONTRACTOR: Muriin Jones,Wharton-Smith, Inc. 0E-238-3.0 NGINEER: Mark Maederer, P.E., PEC 0 FiELD: Don Tilton, PEC DATE: 3 ARCHITECT: 0 CAM: Robert P. Rudd, PEC •`.EAICONS7WE\0E-2381024N.RFP F-00847 (8/t 9/96)