Loading...
III (B) Approval and Authorization for Mayor and City Clerk to execute Addendum No. 96-01 to the Geotechnical Services Contract with Professional Services Industries, Inc. in the not-to-exceed amount of $2,900.00 for additional soil borings at Forest LakeAGENDA 5-21-96 1 Item III B I JAMES W. SHIRA, P.E. CITY ENGINEER / UTILIT ES DIRECTOR 150 N. LAKESHORE DRIVE • OCOEE, FLORIDA 34761 PHONE (407) 656-2322 EXT. 142 • FAX (407) 656-7835 MEMORANDUM DATE: May 13, 1996 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P./sD/irector City Engineer/Utilit SUBJECT: Addendum No. 96-01 Geotechnical Services Contract with PSI Attached for your review is a proposed Addendum to the continuing contract with PSI. In order to determine the character of- the sub -surface soils in the area of the existing rapid infiltration basins at the golf course, PSI proposes to perform the work outlined in their letter dated April 18, -1996. With the information derived from these tests, we will be able to estimate the effluent disposal capacity of the site more accurately. I recommend that the City Commission authorize the Mayor and City Clerk to execute Addendum No. 96-01 inthe not -to -exceed amount of $2,900.00. - JWS/jbw Attachment THE PRIDE OF WEST ORANGE A M r�;:� f EOn0ilt; a' Cae0tech99it;'ai C'onstrMction Consulking • Engineering s Testing April 18,' 1996 The City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 Attention: Mr. Jim Shira, P.E. City Engineer/Director Utilities RE: Additional Soil Borings RIB Site Evaluation Forest Lakes Golf Course Project No. 757-55049 Dear Jim: Pursuant to our recent meeting, PSI is pleased to present our proposal for performing a series of standard penetration test borings within the RIBS at Forest Lake Golf Course. The primary purpose of performing these additional soil borings is to determine if a cemented, hardpan type or dense soil layer exists within the upper 25 feet of the bottom of the RIBS that could be a potential cause of the seepage which is occurring into the adjacent sinkhole area and over the 13th green. We have proposed performing six, 25 feet deep standard penetration test borings as discussed in our recent meeting, spread out over the RIB areas. Review of previous soil borings performed by others during the design phase of the RIBS suggests that a hardpan or cemented type layer may occur in the northern RIB, but only actual soil borings with continuous blow counts can give us a true indication of the density or potential impermeable conditions of the existing subsoils. We estimate our cost to mobilize, do boring layouts and then perform the six, 25 foot deep standard penetration test borings and prepare a brief engineering report of our findings and evaluation to not exceed $2,900.00. The attached Appendix shows a breakdown of our scope of services and corresponding fees. Time wise, we are in a position to perform the soil borings within several days of your authorization to proceed. However, more important would be when treated effluent is not being pumped to the RIBS as we would like to have a relatively dry bottom condition to work in to perform our soil borings. If you could determine when effluent is not being pumped to the RIBS so as to allow access to the bottom by our ATV equipment, then we can schedule our field work accordingly. PSI • 1675 Lee Road • Winter Park, FL 32789 • Phone 407/645-5560 • Fax 407/645-1320 The Cite of Ocoee April 18, 1996 PSI Project No: 757-55049 Page 2 of 5 Should you have any questions concerning this scope of work or want to discuss this matter in more detail, please do not hesitate to give me a call. As we have done on several other proposals, I have attached a suggested Addendum to our Agreement for Consulting Engineering Services referenced the Forest Lake Golf Course and City of Ocoee WWTP Site. I have left the addendum number blank so you can fill int he appropriate Addendum number. Otherwise, this addendum agreement is consistent with previous addendum agreements for hydrogeologic evaluation and engineering services referenced the Forest Lake Golf Course and City of Ocoee WWTP Facilities. Please call at your convenience .to advise as to the dates when the RIB sites will be sufficiently dry to allow access for our drilling equipment. Sincerely, PROFESSIONAL SERVICE INDUSTRIES, INC. D u ord, P. Senior Vice Pre ident/Chief Engineer xc: Ken Hooper, P.E.C. Attachments Appendix Addendum The City of Ocoee April 18, 1996. PSI Project No. 757-55049 Page 3 of 5 APPENDIX Forest Lake Golf Course RIB Site Evaluation Scope of Work: 6 - 25' depth Standard Penetration Test Borings, sampling 1 2.5 ft. centers to a depth of 25 ft. A_ Mobilization and Boring Layout B. Drill Rig and Crew Est. 1.5 Days @ $1,500.00/Day C. Engineering Analysis of Soil Conditions, Project Management and Report Preparation TOTAL ESTIMA7 1. continuous and then $ 150.00 $2,250.00 500.00 COST $2,900.00 ADDENDUM N0*61I'O AGREEMENT FOR CONSULTING ENGINEERING SERVICES HYDROGEOLOGIC EVALUATION f LOAD TEST FOREST LAKE GOLF COURSE & CITY OF OCOEE VVWTP SITE This Addendum No.%-o l hereinafter called the Addendum as of this day of 1996 shall constitute an Addendum to the Agreement for Professional Geotechnical Engineering & Testing Services between the City of Ocoee, Florida (the CITY) and PSI,1675 Lee Road, Winter Park, Florida (the CONSULTANT) dated the 27th. April 1995, hereinafter referred to as the AGREEMENT. WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the CITY retained the CONSULTANT to provide engineering services as required from time to time, and WHEREAS the CONSULTANT will perform consulting engineering services for the CITY defined. NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth on the part of both parties to be kept and performed, the parties do mutually agree as follows: Section 1 - Services of the Consultant 1.1 The CONSULTANT shall perform the engineering services as outlined in the attached proposal 757-55049 dated April 18, 1996 relative to the provision of consulting services to the CITY. Section 2 - Compensation 2.1 Compensation by CITY for engineering services provided under this Addendum shall be computed under Section II of the AGREEMENT utilizing per diem and hourly rates method of compensation, with- the ,compensation for this additional authorization not to exceed $2,900.00 as outlined in the attached proposal, without further authorization from the CITY. Section 3 - Time of Completion 3.1 The CONSULTANT shall provide the services as outlined in the attached proposal. IN WITNESS WIIEEREOF, the parties have executed this Addendum No4ti®ithe day and year provided set forth. CITY City of Ocoee By: Mayor S. Scott Vandergrift ATTEST: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE APPROVED AS TO FORM AND LEGALITY this day of 1996. FOLEY & LARDNER By: City Attorney CONSULTANT Professional Service Industries By: A � Danord,-P- . Sr. Vice President/Chief Engineer ATTEST: Approved by Ocoee City Commission on , 1996 under Agenda Item No.