VI (C) Change Order No. 1 with Southland Construction Company for the Kissimmee Avenue/Story Road and Marshall Farms/Maguire Road Intersection Improvement Project AGI7:DA 3-18-97 ` Ocoee item VI C 0 4 p o �lQ`;. /I rf 0' GOO° JAMES W.SHIRA, P.E. CITY ENGINEER/UTILITIES DIRECTOR ISO N.LAKESHORE DRIVE.OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 MEMORANDUM DATE: March 14, 1997 TO: The Honorable Mayor and Board of City Commissioners FROM: David Wheeler, P.E.-CP0 � Assistant City Engineer/Utilities Director SUBJECT: Story Road/Kissimmee Avenue and Marshall Farms Road/Maguire Road Intersection Improvements Project Change Order Request No. 1 Attached for your review is Change Order Request No. I on the Story Road/Kissimmee Avenue and Marshall Farms Road/Maguire Road Intersection Improvements Project with Southland Construction, Inc. This change order request was initiated by City staff at the request of Sprint Telephone company due to conflicts with the Sprint duct bank under the pavement for Maguire Road. During the design phase of the project, approximately three years ago and last fall, PEC contacted all utility companies, including Sprint, about locations of their systems within the construction limits of this project. Repeatedly, PEC pressured Sprint, Florida Power Corp., Time Warner Cable company and Lake Apopka Natural Gas Corp. to ensure that all of their systems were accurately located and displayed on PEC's drawings and that vertical data was also provided for potential conflicts with proposed structures. Therefore, PEC's plans could include designing around conflicts and requested utility relocations to accommodate the new structures. These utility adjustments included conflicts with the City's water and sewer systems. PEC's design was complicated by the extra-ordinary amount of utilities in the Story. Kissimmee, Maguire, and Geneva intersection and the limited amount of right-of-way and the area north towards TeePee Lumber, was very difficult due to the fact that was no ability to provide any play in elevations for the pipelines. In the fall, when the project was reauthorized to finally take the project to construction, PEC and Staff again met with Sprint and the other affected utilities to review the project and finalize any known or potential conflicts. We were assured that nothing had changed from the initial contacts of three years ago. PEC completed their design based upon the assurance that all the data that they had was accurate. After the project was advertised and bids were received in early December, Sprint requested a meeting to discuss a conflict which they had discovered. At a meeting in early January, Sprint stated that there was a conflict between their major duct bank that runs north/south through the 1/1 THE PRIDE OF WEST ORANGE 4/ intersection and our proposed stormwater pipeline that was crossing the intersection. This conflict was a vertical distance of 12 to 15 inches into the proposed 36 inch pipeline; therefore significantly reducing the flow capacity of the pipeline and basically counter productive to the drainage/flooding improvements that were proposed. Because there was no ability to shift the vertical alignment of the pipeline and Sprint did not offer to relocate their duct bank, Sprint agreed to pay for the redesign of the stormwater system to solve the conflict and any additional construction costs associated with the redesign. PEC completed the redesign and the new alignment was presented to Southland for estimating changes in construction costs and scheduling. PEC's estimate for additional design services has amounted to approximately $4,500. Through negotiations with Southland, the additional construction costs will be $9,296.40 and require an additional seven days to complete. Shortly after the new design was finalized, Sprint requested another meeting because they discovered another conflict. They proposed that the redesign created a bigger conflict. In the meeting, staff and PEC proposed an additional plan to solve the new conflict which could not include returning to the original design. This new design included relocation of the City's sewer forcemain in the affected area, due to additional conflicts. With the removal of the old forcemain we proposed to over excavate the trench and lower the Sprint duct bank. Again, Sprint agreed to pay for additional construction costs related to relieving the conflicts between their duct bank and the new stormwater system. This new redesign was presented to Southland for estimating costs and scheduling. Through negotiations between staff/PEC and Southland, a cost of$30,000 was agreed upon, with an additional time of seven days to complete. The totals for this change order are $39,296.40 and an additional fourteen days. In addition, the PEC fees for redesign are approximately $4,500. The total cost of this additional work to relieve the conflicts with Sprint's duct bank is $43,796.40. Sprint has agreed to reimburse the city $35,000 of this cost with the City absorbing the remainder. The cost of$8,796.40 is construction dollars which the City would have realized due to conflicts between our forcemain and the proposed stormwater system regardless of the alignment. The City's share of this change order will come from the project's construction contingency. This cost amounts to approximately 0.76 percent of the original bid price of$1,163,718.10. The attachment is a copy of the change order, the entire package is available for review if desired. I recommend that the City Commission accept Sprint Telephone Company's offer to participate in this change order in the amount of$35,000,to cover all of PEC's expenses and the majority of the construction costs. Additionally, I recommend that the City Commission approve Change Order No. I with Southland Construction, Inc. by increasing the contract amount by $39,296.20, with an extension in contract time of fourteen days, and authorize the Mayor and City Clerk to execute Change Order No. 1. Attachment CHANGE ORDER NO. 1 CITY OF OCOEE STORY ROAD/KISSIMMEE AVENUE AND MAGUIRE ROAD/MARSHALL FARMS ROAD INTERSECTION IMPROVEMENTS PROJECT PROJECT NO. B-97-02 DATE: March 14, 1997 CONTRACTOR: SOUTHLAND CONSTRUCTION, INC. AGREEMENT DATE: DECEMBER 17, 1996 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $1,163,718.10 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $1,163,718.10 Net Increase(Decrease)Resulting from this CHANGE ORDER $39,296.40 The current CONTRACT PRICE including this CI TANG E ORDER $1,203,014 50 ORIGINAL CONTRACT TIME: 180 Consecutive Calendar Days from Notice to Proceed Date: July 25, 1997 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: July 25, 1997 Net Increase Resulting from this CHANGE ORDER Days: 14 Current CONTRACT TIME Including this CI IANGE ORDER Date: August 8, 1997 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article I, Definitions,of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Item A. Extension of Contract Time. By this change order Section 00500,Agreement Article 3 Contract Time shall be modified as follows: 3.1 will be amended to read within 187 consecutive calendar days of the effective date of the Notice to Proceed. Item B. Extension of Contract Time. By this change order Section 00500,Agreement Article 3 Contract Time shall be modified as follows: 3.1 will be amended to read within 194 consecutive calendar days of the effective date of the Notice to Proceed. III. JUSTIFICATION Item A. This storm line was relocated to the east side of Kissimmee Avenue to avoid grade conflicts with a telephone duct bank and a city force main.To install the pipe in the revised location requires additional material and considerably more maintenance of traffic, Item B. The relocation of the sanitary sewer force main and the lowering of the underground Sprint telephone duct is necessary to avoid"additional"grade conflicts further south on Kissimmee Avenue separate from those described in Change Order Item I.A, This work will require additional materials and maintenance of traffic. IV. NARRATIVE OF NEGOTIATIONS Item A. The contractor's March 27'h proposal was negotiated down from$10,767.13 to$9,296.40. Most of the reduction involved the pavement repair item. Item B. Through negotiations with the Contractor the final agreed upon price was a lump sum figure ofS30.000.00. V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease)Quantity (Decrease)Price I Relocate storm water system 2/S $9,29640 $9,296.40 I 2 Relocate force main,lower Sprint duct bank 2/S $30,000.00 $30,000.00 Total Net Increase(Decrease)Change Order No. I $39,296.40 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. Acknowledgements: The aforementioned change,and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order;and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE,FLORIDA SOUTIILAND CONSTRUCTION INC. By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: _ S. Scott Vandergrif,Mayor Date Attest: Jean Grafton,City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY 'HIE OCOEE CITY CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF , 199 UNDER , 199_ AGENDA ITEM NO. FOLEY& LARDNER By: City Attorney