Loading...
IV(A)1a Bluford Avenue/State Road 50 Relocation of Water Main/Force Main AGENDA 4-5-88 ITEM IV A 1 a THOMAS R. ISON TELEPHONE 656-2322 • Ocoee MAYOR•COMMISSIONER O� 4.ryIr y �# t a CITY OF OCOEE 0 COMMISSIONERS 150 N.LAKESHORE DRIVE 4 pro RUSTY JOHNSON OCOEE,FLORIDA 32761 coot LESTER DABBS, JR. 4,s4 cohs�, JOHN BATEMAN VARD J. HAGER Q x4,cfNTENtex-4 CITY MANAGER OCOEE TEDDY C. RYAN, JR. STAFF REPORT A BICENTENNIAL COMMUNITY DATE: MARCH 23, 1988 407 TO: THE HONORABLE MAYOR AND BOARD OF CITY COMMISSIONERS V1 FROM: RAY BRENNER, ACTING PUBLIC WORKS DIRECTOR SUBJECT: BLUFORD AVE./S.R. 50 INTERSECTION IMPROVEMENTS - WATER MAIN/FORCE MAIN RELOCATION ISSUE Should the Honorable Mayor and Board of City Commissioners issue a change order for the amount of $19,380 to the downtown area water distribution system improvements, Job No. 0E-35 3.1, or consider payment under the S.R. 50 water main/force main relocation? BACKGROUND The Department of Transportation will be paving a deceleration lane on the south side of Route 50 to extend approximately 450 feet easterly to S.R. 526 (Old Winter Garden Road). DISCUSSION D.O.T. will be paving the deceleration lane that will cover the City's water main and force main access to service or improve the systems at a later date, it will be necessary to relocate these lines at this time. D.O.T. has indicated that the relocations must be completed by May 10, 1988, which was originally planned for April 8. 15, 1988. Sealed bids were received by two (2) contractors, with the successful bidder being "Travis Williams Construction Company" for the amount of $19,380. The engineer's estimate (P.E.C.) was at $16,240. RECOMMENDATION It is respectively recommended that the Honorable Mayor and Board of City Commissioners approve the amount of $19,380 + 10% contingency monies to relocate the underground pipe lines. RMB:blm "CENTER OF GOOD LIVING— THE PRIDE OF WEST ORANGE" EPEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC. LETTER OF TRANSMITTAL -4 Suite 1560, Hartford Building 200 E. Robinson Street DATE 3-jv_ JOB NO.o6 14,1 Orlando, Florida 32801 - �` (305) 422-8062 ATfENTfON p e PE. /16'-P‘ GENTLEMEN WE ARE SE ' • N c 0 • Attached 0 Under separate cover 0 Hand delivered the following items: O Shop drawings Prints O Plans 0 Specifications 0 Reports O Copy of letter O Change order 0 No.Coons No,UN .. Oescntxfon /67G0-7i0Pe• -. #34 tlq„f / (OS/ -r 0f • THESE ARE TRANSMITTED as checked belo . O For approval As requested 0 Approved as noted O For your use 0 For review 0 Returned for corrections O For distribution 0 Approved as submitted 0 REMARKS • COPY TO SIGNED: 41/Z 1l w^�Nrr.int..w nnf 1t nnfn(t(vw.t.. f COST ESTIMATE 1. BLUFORD AVENUE & S.R. 50 COLLECTION SYSTEM RELOCATION t ITEM QUANTITY ITEM COST COST 8" PVC 15 Ft. $ 18.00/Ft. $ 270.00 8" Plug Valve 1 $350.00/Ea. 350.00 8" B.F. 2 $ 50.00/Ea. 100.00 12" PVC San. Sewer 32 Ft. $ 25.00/Ft. 800.00 San. Sewer Manhole 1 $900.00/Ea. 900.00 12" B.F. 1 $100.00/Ea. 100.00 Restoration - L.S. 200.00 Mobilization, Misc. - L.S. 500.00 r Sub-Total $3,220.00 15% Contingency 480.00 TOTAL $3,700.00 2. BLUFORD AVENUE & S.R. 50 WATER MAIN RELOCATION ITEM QUANTITY ITEM COST COST 10" PVC Water Main 350 Ft. $ 20.00/Ft. $ 7, 000.00 10"-45° Bends D.I. 3 $300.00/Ea. 900.00 10" Gate Valve W/Box 1 $750.00/Ea. 750.00 Tee 10" x 10" 1 $500.00/Ea. 500.00 Restoration - L.S. 750.00 Mobilization, Misc. - L.S. 1, 000.00 Sub-Total $10,900.00 15% Contingency 1, 640.00 4 TOTAL $12,540.00 1 l 2 L1 I • Travis Williams Construction Company, Inc. 1702 Wind Drift Road, Orlando, Florida 32809 (305) 855-6662 March 21 , 1988 City of Ocoee 150 Lake Shore Drive Ocoee, Florida Re: Bluford Avenue & S.R. 50 Collection System Relocation Bluford Avenue & S.R. 50 Water Main Relocation Gentlemen, We are pleased to submit our proposal for the above project as follows. 1 - Furnish labor, materials and equipment to install one 4 ' dia. X 6 ' deep manhole and cover, complete with required openings, and Bitumastic Coatings, required M.J. fitting, 8" and 12" sewer piping and 8" plug valve and box. Price $6, 290 . 00 2 - Furnish labor, materials and equipment to relocate 350 L.F. 10" SDR-21 PVC water main, required M.J. fitting, and one 10" gate valve and box. Price $10 , 050 . 00 3 - Furnish labor, materials and equipment to re-connect existing hydrant, & service to new water main, including 10"X6" M.J. tee, 6" M.J. 45° , 10" X 2" D.S. saddle, corp stop and piping. Price $1 , 750 . 00 Alternate (For your consideration) To prevent a long shut-down of the water line while testing, sterlizing and make the new connections , and for making future connections , we sug- gest you install a gate valve at approximately station 798+75 . For labor, materials and equipment to install 10" gate valve and box and 10" sleeve. Price $1 , 290 . 00 We trust the above meets with your approval and would be pleased to have your approval to proceed with this work. Sincerely, Travis Williams Construction Company, Inc. d.../eawad Travis Williams President TW/nd Ali. ' ********* �. _ A AM' March 22, 1988 ********** it. ********** * * I' • . 1 _ e • . 1 1 •. Si •: Ray Brenner NIMIIIIIIINIMMIE City of Ocoee - irr - 11 150 Lakeshore Drive Ocoee, FL 32761 Dear Mr. Brenner: The following is information about the Bluford Avenue and State Road 50 project. Sewer Collection System Relocation Price includes: x 1. Traffic control i 2. Well pointing 3. Drop manhole connection 4. Relocating existing tee 5. Relocating existing plug valve and box 6. Concrete coring existing manhole 7. Compaction of disturbed ground 8. Locating and coordinating with existing utilities Water Main Relocation Price includes: 1. Traffic control 2. Concrete encasement with sewer and water main 3. Relocating existing fire hydrant 4. Connection to existing lines 5. Testing 6. Locating and coordinating with existing utilities 7. Compaction of disturbed ground Note: We have priced the bid according to the award of both contracts only. ctfully, (:::::: (a (-Al2-.,%i______ Gregory A. lz Vice President GAV/st 2202 Curry Ford Rd. - Suite A • Orlando, FL 32806 • (305) 896-3370 / /I COST ESTIMATE 1. BLUFORD AVENUE & S.R. 50 COLLECTION SYSTEM RELOCATION ITEM OUANTITY 8" PVC 15 Ft. $ 300.00 411-1-Parwraierive" _4 8" B.F. 2 200.00 12" PVC San. Sewer 32 Ft. 1,2E10.00 San. Sewer Manhole 1 2,100.00 12" B.F. 1 150.00 Restoration - 250.00 Mobilization, Misc. - 7,000.00 Sub-Total 11,280.00 15% Contingency -0- TOTAL $ 11,2E10.00 2. BLUFORD AVENUE & S.R. 50 WATER MAIN RELOCATION ;TEM OUANTITY 10" PVC Water Main 350 Ft. $ 6,300.00 10"-45' Bends D.I. 3 720.00 10" Gate Valve W/Box 1 1,300.00 Tee 10" x 10" 1 500.00 Restoration - 250.00 gY Mobilization, Misc. - 2,750.00 Sub-Total 11,820.00 15% Contingency -0- TOTAL $ 11,820.00