Loading...
Item #08 Award of Bid #07-05 Reclaimed Water System Retrofit for Reflections Subdivision AGENDA ITEM COVER SHEET Meeting Date: 5/15/07 Item # 8 Contact Name: Contact Number: Joyce Tolbert 1516 Reviewed By: Department Director: City Manager: tiff - Subject: Award of Bid #B07-05 Reclaimed Water System Retrofit for Reflections Subdivision Background Summary: The Engineering Department and Finance Department have reviewed all bids. Staff recommends awarding the bid to Young's Communications Co., Inc. as the most responsive and responsible bidder for the amount of $389,904.00. The Engineer's estimate for this project was $850,000.00, and the approved budget for the Reflections project is $576,576.00 from the 2003 Water and Sewer Bond Issue. Issue: Award the contract to construct the Reclaimed Water Distribution System, located in the Reflections Subdivision, to Young's Communications Co., Inc. Recommendations Staff recommends that the City Commission: 1) Award Bid #B07 -05 for construction of the Reclaimed Water System Retrofit for Reflections Subdivision to Young's Communications Co., Inc. in the amount of $389,904.00. 2) Authorize the Mayor, City Clerk, and Staff to execute all necessary contract documents once the appropriate bonds and insurance are secured. Attachments: 1. Bid Tabulations A&B 2. ITB #B07-05 Financial Impact: $389,904.00 from the 2003 Water and Sewer Bond Issue. Type of Item: (please mark with an "x') Public Hearing _ Ordinance First Reading _ Ordinance Second Reading Resolution -L Commission Approval Discussion & Direction For Clerk's DeDt Use: _____ Consent Agenda _____ Public Hearing _____ Regular Agenda _ Original Document/Contract Attached for Execution by City Clerk ~ Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. Reviewed by ( ) Jf 6th-- N/A N/A 2 City Manager Robert Frank Commissioners Gary Hood. District 1 Scott Anderson. District 2 Rusty Johnson. District 3 Joel Keller. District 4 Mayor S. Scott Vandenrrift STAFF REPORT FROM: The Honorable Mayor and City Commissioners Joyce Tolbert, Purchasing Agent ~ May 8, 2007 TO: DATE: RE: Award of Bid #B07-05 Reclaimed Water System Retrofit for Reflections Subdivision ISSUE Award the contract to construct the Reclaimed Water Distribution System, located in the Reflections Subdivision, to Young's Communications Co., Inc. BACKGROUND/DISCUSSION The bid was publicly advertised on March 25,2007 and opened on April 25, 2007. There were a total often (10) bids for Bid Tab B (Directional Drill) and seven (7) bids for Bid Tab A (Open Trench): Bidder Bid Tab A-Open Trench Bid Tab B-Directional Drill 1. Young's Communications Co., Inc. No bid $ 389,904.00 2. Florida Contracting Company No bid $ 396,150.00 3. Expertech Network Installation No bid $ 551,957.58 4. US Water Services Corp. No bid $ 592,555.90 5. American Persian Engineers & Const. $ 836,700.00 $ 604,925.00 6. Rayken Inc. $ 601,018.75 $ 641,073.75 7. V olt Information Sciences No bid $ 644,770.00 8. Schuller Contractors $ 799,999.00 $ 836,000.00 9. Central FL Environmental $ 968,452.22 $ 918,758.93 10. Gregory Electric Co. No bid $1,060,135.00 11. A&M SI Construction $ 819,800.00 No bid 12. Gibbs & Register $ 819,975.00 No bid 13. Stately Contractors $ 863,430.00 No bid Attached is the bid tabulation and all bids are available in the Finance Department for review. The Engineering Department and Finance Department have reviewed all bids. Staff recommends awarding the bid to Young's Communications Co., Inc. as the most responsive and responsible bidder for the amount of $389,904.00. The Engineer's estimate for this project was $850,000.00, and the approved budget for the Reflections project is $576,576.00 from the 2003 Water and Sewer Bond Issue. 2 BID #B07-05 RECLAIMED WATER SYSTEM RETROFIT FOR REFLECTIONS SUBDIVISION REVISED BID TAB "B" Uti' ....~.,' I...~ .:..... .....,.,".; ;'i; Expertech Network c.. .' .i.,. :~:~I~~~~ ....'::!.~".~ Irl~li: BID TAB "B" ,Inc. Installation ..... &. ... Bid Bond Yes Yes Yes Yes Yes License Check Yes Yes Yes Yes Yes DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ~-,!:>;lizationlDemobilizatian 1 $4,500.00 $4,500.00 $12,000.00 $14,000.00 $10,000.00 $10,000.00 $26,219.00 $26,219.00 $25,000.00 $25,000.00 General Reouirements 1 $~.500.00 $2.500.00 $8,000.00 $8,000.00 $22,050.00 $22,050.00 $10,839.00 $10,839.00 $25,000.00 $25,000.00 Ibdemnificatian 1 $2,000.00 - $2,000.00 $100.00 $100.00 $1,000.00 $1,000.00 $100.00 $10,202.00 $10,202.00 $100.00 Utilitv Test Pits 1 $250.00 $250.00 $4,000.00 $4,000.00 $18,253.98 $18,253.98 $1,021.00 $1,021.00 $5,000.00 $5,000.00 Cannectian to, Existinq Water Main 3 $1,233.00 $3,699.00 $7,950.00 $23,850.00 $1,825.40 $5,476.20 $4,005.00 $12,015.00 $5,600.00 $16,800.00 Furnish and Install 8-inch HDPE Reclaimed Water Main 7350 $32.14 $236,229.00 $30.00 $220,500.00 $43.02 $316,197.00 $51.81 $380,803.50 $35.00 $257,250.00 Furnish and Install 8-inch DI Gate Valve and Bax 15 $1,585.00 $23,775.00 $2,200.00 $33,000.00 $1,921.23 $28,818.45 $1,956.83 $29,352.45 $5,500.00 $82,500.00 Furnish and Install DI Blow-Off Valve 1 $487.00 $487.00 $800.00 $800.00 $791.04 $791.04 $1,402.00 $1,402.00 $2,500.00 $2,500.00 8-inch DI 11.25-dearee Bend 1 $535.00 $535.00 $500.00 $500.00 $583.40 $583.40 $752.00 $752.00 $750.00 $750.00 8-inch DI 22.5-dearee Bend 2 $540.00 $1,080.00 $500.00 $1,000.00 $583.64 $1,167.28 $755.50 $1,511.00 $750.00 $1,500.00 8-inch DI 45-dearee Bend 15 $540.00 $8,100.00 $500.00 $7,500.00 $580.56 $8,708.40 $755.40 $11,331.00 $750.00 $11,250.00 8-inch DI Cross 1 $950.00 $950.00 $600.00 $600.00 $912.64 $912.64 $1,700.00 $1,700.00 $1,250.00 $1,250.00 8-inch DI Tee 4 $811.00 $3,244.00 $1,250.00 $5,000.00 $954.38 $3,817.52 $977.25 $3,909.00 $750.00 $3,000.00 Sad Reolacement 1500 $1.35 $2,025.00 $1.00 $1,500.00 $1.18 $1,770.00 $0.51 $765.00 $0.50 $750.00 Sinale Service Connection' 20 $910.00 $18,200.00 $520.00 $10,400.00 $835.39 $16,707.80 $612.45 $12,249.00 $950.00 $19,000.00 Sinale Serl'i,...t:\ C0r.:1er:t:on (Vi/Roadwav CrossinaY 9 $650.00 $5,850.00 $700.00 $6,300.00 $1,194.56 $10,751.04 $1,043.78 $9,394.02 $2,500.00 $22,500.00 Double Service Cannections' 35 $810.00 $28,350.00 $600.00 $21,000.00 $1,179.49 $41,282.15 $781.26 $27,344.10 $950.00 $33,250.00 Double Service Connectian (w/Roadwav Crossinq)' 37 $1,050.00 $38,850.00 $900.00 $33,300.00 $1,551.34 $57,399.58 $1,212.59 $44,865.83 $2,500.00 $92,500.00 Asohalt Remaval and Temoararv Reoair 20 $51.00 $1,020.00 $72.00 $1,440.00 $4.56 $91.20 $91.85 $1,837.00 $65.00 $1,300.00 Grasslsadl reolacement and restoratian 5000 $1.35 $6,750.00 $0.75 $3,750.00 $1.18 $5,900.00 $0.51 $2,550.00 $0.50 $2,500.00 Reolace 4-inch concrete sidewalk 10 $81.00 $810.00 $36.00 $360.00 $5.48 $54.80 $99.50 $995.00 $65.00 $650.00 Reo lace 6-inch concrete driveway aoron and sidewalk 5 $90.00 $450.00 $90.00 $450.00 $8.52 $42.60 $108.40 $542.00 $65.00 $325.00 Reolace concrete curb 10 $25.00 $250.00 $80.00 $800.00 $18.25 $182.50 $95.70 $957.00 $25.00 $250.00 TOTAL $389,904.00 $396,150.00 $551,957.58 $592,555.90 $604,925.00 Note: FL Contracting had an inconsistency on their bid tab for Connection to Existing Water Main. Discrepancy between unit price in words and unit price in numerals, resolved in favor of the words per the bid documents. Page 1 of 2 BID #B07-05 RECLAIMED WATER SYSTEM RETROFIT FOR REFLECTIONS SUBDIVISION REVISED BID TAB "B" . Ie .L "- .b's'. ", .Inet '?i ,'>Ce~tI-.ll FI(lii~ Seiellces, .. >" En~ronmenmICO. . .-'," I~- BID TAB "B" Ravken, Inc. '.'.. A' i' IlIc. Bid Bond Yes Yes Yes Yes Yes License Check Yes Yes Yes Yes Yes DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE Mobilization/Demobilization 1 $19,200,00 $19,200.00 $15,000.00 $15,000.00 $118,778.00 $118,778.00 $83,484.36 $83,484.36 $130,000.00 $130,000.00 General Reouirements 1 $25,325.00 $25,325.00 $15,000.00 $15,000.00 $89,250.00 $89,250.00 $57,812.50 $57,812.50 $175,000.00 $175,000.00 Ibdemnification 1 $250.00 $250.00 $17,453.00 $17,453.00 $100.00 $100.00 $16,693.75 $16,693.75 $2,000.00 $2,000.00 UtilitvTest Pits 1 $9,400.00 $9,400.00 $13,000.00 $13,000.00 $5,950.00 $5,950.00 $14,500.00 $14,500.00 $8,500.00 $8,500.00 Connection to Existino Water Main 3 $3,100.00 $9,300.00 $3,314.00 $9,942.00 $3,927.00 $11,781.00 $5,735.00 $17,205.00 $2,150.00 $6,450.00 Furnish and !l"st3H ,a-!~ch HDPE Reclaimed Water Main 7350 .. $53.40 $392,490.00 $52.00 $382,200.00 $48.00 $352,800.00 $64.58 $474,663.00 $68.90 $506,415.00 Furnish and Install8-inch 01 Gate val',,:: c.nd SUA 15 $2,150.00 $32,250.00 $3,200.00 $48,000.00 $1,785.00 $26,775.00 $1,787.50 $26,812.50 $1,650.00 $24,750.00 Furnish and Install DI Blow-QffValve 1 $1,250.00 $1,250.00 $2,500.00 $2,500.00 $2,142.00 $2,142.00 $1,102.50 $1,102.50 $1,500.00 $1,500.00 8-inch 01 11.25-deoree Bend 1 $1,190.00 $1,190.00 $300.00 $300.00 $2,023.00 $2,023.00 $412.50 $412.50 $325.00 $325.00 8-inch 01 22.5-deoree Bend 2 $1,190.00 $2,380.00 $300.00 $600.00 $2,083.00 $4,166.00 $420.00 $840.00 $400.00 $800.00 8-inch 01 45-degree Bend 15 $1,190.00 $17,850.00 $300.00 $4,500.00 $2,023.00 $30,345.00 $416.25 $6,243.75 $550.00 $8,250.00 'a-inch DI Cross 1 $1,500.00 $1,500.00 $300.00 $300.00 $2,023.00 $2,023.00 $787.50 $787.50 $750.00 $750.00 8-inch 01 Tee 4 $1,400.00 $5,600.00 $500.00 $2,000.00 $1,517.00 $6,068.00 $630.00 $2,520.00 $750.00 $3,000.00 Sod Replacement 1500 $0.40 $600.00 $2.00 $3,000.00 $2.00 $3,000.00 $0.79 $1,185.00 $3.10 $4,650.00 Sinale Service Connection' 20 $825.00 $16,500.00 $775.00 $15,500.00 $1,488.00 $29,760.00 $1,113.75 $22,275.00 $975.00 $19,500.00 Sinale Service Connection Iw/Roadwav Crossina" 9 $1,475.00 $13,275.00 $1,375.00 $12,375.00 $1,507.00 $13,563.00 $3,104.l6 .. '$27,937.44 $1,249.00 $11,241.00 Double Service Connections' 35 $870.00 $30,450.00 $950.00 $33,250.00 $1,734.00 $60,690.00 $1,368.75 $47,906.25 $1,475.00 $51,625.00 Double Service Connection (w/Roadwav Crossino)' 37 $1,515.00 $56,055.00 $1,575.00 $58,275.00 $1,898.00 $70,226.00 $2,644.94 $97,862.78 $2,249.00 $83,213.00 Asohalt Removal and Temoorarv Reoair 20 $170.00 $3,400.00 $28.50 $570.00 $24.00 $480.00 $463.88 $9,277.60 $14.50 $290.00 Grass (sod' renlacement and restoration 5000 $0.40 $2,000.00 $2.00 $10,000.00 $1.00 $5,000.00 $0.86 $4,300.00 $3.90 $19,500.00 Replace 4-inch concrete sidewalk 10 $33.50 $335.00 $29.00 $290.00 $48.00 $480.00 $196.25 $1,962.50 $59.60 $596.00 Replace 6-inch concrete driveway apron and sidewalk 5 $44.75 $223.75 $33.00 $165.00 $60.00 $300.00 $392.50 $1,962.50 $66.00 $330.00 Replace concrete curb 10 $25.00 $250.00 $55.00 $550.00 $30.00 $300.00 $101.25 $1,012.50 $145.00 $1,450.00 TOTAL $641,073.75 $644,770.00 $836,000.00 $918,758.93 $1,060,135.00 Note: FL Contracting had an inconsistency on their bid tab for Connection to Existing Water Main. Discrepancy between unit price in words and unit price in numerals, resolved in favor of the words per the bid documents. Page 2 of 2 BID #B07-05 RECLAIMED WATER SYSTEM RETROFIT FOR REFlECTIONS SUBDIVISION BID TAB "A" iX e' e , , .2";,e" i, r:~~2ir~~.~!~B~~~'i'~~2>; <> ;;;'''-U'~I "" BID TAB "A" jY:ziL. e> '; ..iieei;e:... .Inc. e,,> Bid Bond Yes Yes Yes Yes e License Check Yes Yes Yes Yes DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE Mobilization/Demobilization 1 $18,000.00 $18,000.00 $117,174.00 $117,174.00 $60,000.00 $60,000.00 $45,000.00 $45,000.00 General Requirements 1 $24,800.00 $24,800.00 $90,000.00 $90,000.00 $35,000.00 $35,000.00 $35,000.00 $35,000.00 Ibdemnification 1 $250.00 $250.00 $100.00 $100.00 $100.00 $100.00 $100.00 $100.00 Utility Test Pits 1 $9,400.00 $9,400.00 $6,000.00 $6,000.00 $10,500.00 $10,500.00 $22,000.00 $22,000.00 Connection to ExistinQ Water Main 3 $3,100.00 $9,300.00 $1,360.00 $4,080.00 $2,000.00 $6,000.00 $1,600.00 $4,800.00 Furnish and install 8-inch HOPE ReClaimed Water Main ' 7350 $35.25 $259,087.50 $42.00 $308,700.00 $66.00 $485,100.00 $50.00 $367,500.00 -- ..- e_' "Furnish and Install 8-inch 01 Gate Valve and Box 15 $1,650.00 $24,750.00 $2,400.00 $36,000.00 $1,250.00 $18,750.00 $1,700.00 $25,500.00 Furnish and Install DI Blow-Off Valve 1 $825.00 $825.00 $960.00 $960.00 $1,500.00 $1,500.00 $1,400.00 $1,400.00 8-inch 01 11.25-degree Bend 40 $750.00 $30,000.00 $660.00 $26,400.00 $500.00 $20,000.00 $400.00 $16,000.00 8-inch 01 22.5-deoree Bend 22 $750.00 $16,500.00 $660.00 $14,520.00 $450.00 $9,900.00 $400.00 $8,800.00 8-inch 01 45-dearee Bend 41 $750.00 $30,750.00 $600.00 $24,600.00 $400.00 $16,400.00 $450.00 $18,450.00 8-inch 01 Cross 1 $1,075.00 $1,075.00 $1,080.00 $1,080.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 8-inch 01 Tee 4 $950.00 $3,800.00 $900.00 $3,600.00 $450.00 $1,800.00 $1,000.00 $4,000.00 Sod Replacement 3000 $0.40 $1,200.00 $2.00 $6,000.00 $1.00 $3,000.00 $3.00 $9,000.00 Single Service Connection' 20 $675.00 $13,500.00 $660.00 $13,200.00 $1,050.00 $21,000.00 $950.00 $19,000.00 Single Service Connection (w/Roadway Crossing)' 9 $1,320.00 $11,880.00 $1,240.00 $11,160.00 $1,250.00 $11,250.00 $1,400.00 $12,600.00 Double Service Connections' 35 $715.00 $25,025.00 $926.00 $32,410.00 $1,000.00 $35,000.00 $1,000.00 $35,000.00 Double Service Connection (w/Roadwav Crossing)' 37 $1,360.00 $50,320.00 $1,395.00 $51,615.00 $1,000.00 $37,000.00 $1,600.00 $59,200.00 Asphalt Removal and Temporarv Repair 600 $77.75 $46,650.00 $18.00 $10,800.00 $18.00 $10,800.00 $80.00 $48,000.00 Grass (sod) replacement and restoration 20000 $0.40 $8,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $3.00 $60,000.00 Replace 4-inch concrete sidewalk 100 $33.50 $3,350.00 $48.00 $4,800.00 $45.00 $4,500.00 $60.00 $6,000.00 Replace 6-inch concrete driveway apron and sidewalk 275 $44.75 $12,306.25 $60.00 $16,500.00 $40.00 $11,000.00 $75.00 $20,625.00 Replace concrete curb 10 $25.00 $250.00 $30.00 $300.00 $20.00 $200.00 $80.00 $800.00 TOTAL $601,018.75 $799,999.00 $819,800.00 $819,975.00 Page 1 of 2 BID #B07-05 RECLAIMED WATER SYSTEM RETROFIT FOR REFLECTIONS SUBDIVISION BID TAB "A" ~~~i:anf'ersilJ~',., 1J;I;'~~j<;0~0f.;;5 ~;. " .,.,.. )0 ;i"1r'" ,;; El1gin~!1';8.~pllStrUCtors. -". -Ionaa BID TAB "A" Il1c. Stately I. "'~";"'oratl()n Bid Bond Yes Yes Yes License Check Yes Yes Yes DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE Mobilization/Demobilization 1 $50,000.00 $50,000.00 $46,000.00 $46,000.00 $84,995.79 $84,995.79 General Requirements 1 $45,000.00 $45,000.00 $46,000.00 $46,000.00 $57,812.50 $57,812.50 Ibdemnification 1 $100.00 $100.00 $100.00 $100.00 $16,693.75 $16,693.75 Utility Test Pits 1 $5,000.00 $5,000.00 $14,000.00 $14,000.00 $14,500.00 $14,500.00 Connection to Existing Water Main 3 $5,600.00 $16,800.00 $2,900.00 $8,700.00 $5,735.00 $17,205.00 Furnish and Install 8-inch HOPE Reclaimed Water Main 7350 $45.00 $330,750.00 $50.00 $367,500.00 $53.11 $390,358.50 Furnish and Install 8-inch 01 Gate Valve and Box 15 $5,500.00 $82,500.00 $1,500.00 $22,500.00 $1,787.50 $26,812.50 Furnish and Install 01 Blow-off Valve 1 $2,500.00 $2,500.00 $1,200.00 $1,200.00 $1,102.50 $1,102.50 8-inch 01 11.25-dearee Bend 40 $750.00 $30,000.00 $660.00 $26,400.00 $412.50 $16,500.00 8-inch 01 22.5-degree Bend 22 $750.00 $16,500.00 $660.00 $14,520.00 $420.00 $9,240.00 8-inch 01 45-deQree Bend 41 $750.00 $30,750.00 $660.00 $27,060.00 $416.25 $17,066.25 8-inch 01 Cross 1 $1,250.00 $1,250.00 $1,100.00 $1,100.00 $787.50 $787.50 8-inch 01 Tee 4 $750.00 $3,000.00 $1,000.00 $4,000.00 $630.00 $2,520.00 Sod Reolacement 3000 $0.50 $1,500.00 $0.50 $1,500.00 $0.79 $2,370.00 Sinale Service Connection. 20 $950.00 $19,000.00 $1,100.00 $22,000.00 $1,113.75 $22,275.00 Sinale Service Connection (w/Roadway Crossina). 9 $2,500.00 $22,500.00 $2,500.00 $22,500.00 $3,302.09 $29,718.81 Double Service Connections. 35 $950.00 $33,250.00 $1,700.00 $59,500.00 $1,368.75 $47,906.25 Double Service Connection (w/Roadway Crossinal* 37 $2,500.00 $92,500.00 $2,900.00 $107,300.00 $3,326.01 $123,062.37 Asohalt Removal and Temoorary Reoair 600 $65.00 $39,000.00 $60.00 $36,000.00 $77.06 $46,236.00 Grass (sod) replacement and restoration 20000 $0.50 $10,000.00 $0.50 $10,000.00 $0.84 $16,800.00 Reolace 4-inch concrete sidewalk 100 $10.00 $1,000.00 $60.00 $6,000.00 $55.25 $5,525.00 Reolace 6-inch concrete driveway apron and sidewalk 275 $12.00 $3,300.00 $70.00 $19,250.00 $65.28 $17,952.00 Reolace concrete curb 10 $50.00 $500.00 $30.00 $300.00 $101.25 $1,012.50 TOTAL $836,700.00 $863,430.00 $968,452.22 Page 2 of 2 SECTION 00020 INVITATION TO BID #B07-05 RECLAIMED WATER SYSTEM RETROFIT FOR REFLECTIONS SUBDIVISION OCOEE, FLORIDA Sealed bids, in duplicate, will be received at the office of the Purchasing Agent in the City ofOcoee, until 2:00 pm, local time, on April 25, 2007. Sealed bids must be date and time stamped at the office of the Purchasing Agent before that time. Any bids received after that time will not be accepted under any circumstances. Any uncertainty regarding the time a bid is received will be resolved against the bidder. Bids submitted after the designated time will be returned unopened. All bids received before the due date and time will be publicly opened and read aloud by the Purchasing Agent or her designee in the City ofOcoee City Hall Conference Room at approximately 2:01 pm. Description ofW ork: All work for the project shall be designed and constructed in accordance with the drawings and specifications prepared by Miller Legg, as subsequently modified by the City of Ocoee. The proposed project will be awarded and constructed, if award is made, in conformance with the plans and specifications. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, incidentals, and services, including labor, for the work, which generally includes, but is not necessarily limited to, the following: . 7,350 linear feet 8-inch reclaimed water main Prospective bidders may secure a copy of the complete bid package (drawings and specifications) from the Purchasing Agent at Ocoee City Hall, Finance Department, 150 N. Lakeshore Drive, Ocoee, FL 34761-2258, (407) 905-3100, ext. 1516, for a non-refundable fee of$150.00 per set. Checks should be made payable to the City of Ocoee. Partial sets of bid documents will not be issued. Information concerning this Invitation to Bid is also available from Onvia/DemandStar by accessing the City's Web site at http://www.ci.ocoee.f1.us/Finance/Purchasing/Purchasing.asp#Bids. Bids shall be prepared from complete, full-size contract documents. Addenda will be posted on DemandStar and transmitted to all holders of complete contract documents not later than twenty-four (24) hours before bid time via facsimile or U.S. mail, as determined by the City of Ocoee. Pre-bid Conference: None is scheduled. Bid Bond: A certified check or bid bond shall accompany each bid. The certified check or bid bond shall be for an amount not less than five percent (5%) ofthe bid price, and shall be made payable to the City of Ocoee as a guarantee that the Bidder will not withdraw for a period of ninety (90) days after bid closing time. O:\Purchasing\ WORD\Bids\2007 BIDS- RFPS\B0705 _ Reflections_Reclaimed _ Water_Distribution _ITB. DOC ML PROJ#06-00248 00020-1 031405 Bid Submittal: A single bid shall be submitted for the work. The contract will be awarded pursuant to the requirements of applicable state and federal laws and regulations and pursuant to any applicable City of Ocoee purchasing rules and procedures. Bids shall be on the bid form provided in the bidding documents and enclosed within a sealed envelope, with the words "Bid #B07-05 for Construction of the Reflections Reclaimed Water Distribution System" and the bidder's name, address, and State of Florida contractor's license number clearly shown on the outside thereof. Bidder must acknowledge receipt of all addenda in the prescribed bid form. Bids must be signed by an authorized representative of the bidder. Failure to comply with either condition shall be cause for bid disqualification. Mailed bids shall be sent to the attention of the Purchasing Agent, City ofOcoee, 150 North Lakeshore Drive, Ocoee, FL 34761- 2258. Award ofContract(s): The City ofOcoee reserves the right to waive technicalities or irregularities, to reject any or all bids, and/or to accept that bid which is in the best interest of the City, price, qualifications and other factors taken into consideration. The City reserves the right to award the contract to the bidder which, in the sole discretion ofthe City, is the most responsive and responsible considering price, qualifications, and other factors. City Clerk OCOEE, FLORIDA March 25,2007 END OF SECTION O:\Purchasing\ WORD\Bids\2007 BIDS-RFPS\B0705 _Reflections_Reclaimed _ Water _ Distribution_ITB.DOC ML PROJ#06-00248 00020-2 031405