Loading...
Item 09 Approval of Contracted Sidewalk Repairs Utilizing Existing City of Kissimmee Contract with APEC LLC0 oco_; _ flotida AGENDA ITEM COVER SHEET Fleeting Date: December , 2022 . Item #Reviewed By r Contact N m � Stephen . I{rta Department Director. Contact Number, r 2 � .�... City Manager: Background Summary: The City Commission approved funding in the current budget to perform contracted sidewalk repairs, In carder to expedite the project, Public irks is requesting nrnmission authorization to piggy -back on the existing competitively hid City of Kissimmee m ontr t 117132022-002, Alternative Paving Methods, awarded to APEC, LL , which also includes sidewalk replacement items. APEC is one of the it 's continuing contractors for small construction services 'providers RF 22- . The attached cost estimate of $208,876,14 to provide the sidewalk replacement is based on the competitively bid and awarded City of Kissimmee ee contract. This award does not exhaust the budget for the sidewalk replacement and additional locations can be added to the work in accordance with the Purchasing manual, Public Works recommends approval of this proposal. Issue Request the Honorable Mayor and City Commission award the contracted sidewalk repairs utilizing an existing City" of Kissimmee contract with - APEC, LL . Recommendations: Staff ,recommends the Honorable Mayor and City Commission authorize s purchase order be issued for the contracted sidewalk repairs with APEC, LLC utilizing the existing competitively bid City of Kissimmee contract IFB2022-002, in the amount of $208,876.14, and authorize the City Manager and Staff to approve changeordersto this contract up to the limit of his purchasing authority for each orange order, and up to the budgeted amount for this project for all change orders. Attachments: City of Kissimmee e Contract IF132 22-002, APEC Cost Proposal. Financial Impact: The work is adequately funded in the Public Works Streets Division budget. Type of Item: (please mark with an 'Y Public Hearing r l `rh' Ze'n"cd OrdinanceFirst treading _. o"n ntA Ordinance Second Reading Public bearing Resolution Regular Agenda Commission Approval Discussion & olr ration (Irininzi :nr`+, lr A-ntir.n ntr r i -4tt r AH fart °vprj ifirin hip t .iht r'.1smrL- Original Document/Contract Held by Department for Execution Reviewed by City Attorney NIA Reviewed by Finance Dept. Zt, N/A Reviewed by ( ) N/A N �ecr, American Persian Engineering & Construction LLC 5401 S. Kirkman Rd #336, Orlando, FL 327819 (407)6197888 11/15/2022 APED takes Pride in every project and milestone completed. We strive to set a standard higher than the industry and are immensely proud to practice the best methodologies on providing the most efficient project management process. M We are pleased to provide you the below quote on the services requested on removal of existing sidewalk and installation of new sidewalk. This proposal has been prepared in conjunction with the list which was provided by your office. ■ The following table details the pricing for delivery of the services outlined in this proposal. This pricing is valid for 30 days from the date of this proposal: 1 1 18 Miscellaneous Concrete Removal 1-200 SY 1251.89 $40.00 $50,075.60 —2 121 Concrete Sidewalk-(4" thickness) 1-100 SY 255.56 $100.00 $25,556.00 3 122 Concrete Sidewalk-(4" thickness) 101-250 SY 845.11 $95.00 $80,285.45 4 124 Concrete Sidewalk-(6" thickness) 1-100 SY 151.22 $120.00 $18,146.40 —5 1 Mobilization I % 1 10% $17,406.35 6 3 Maintenance of Traffic I % 1 10% $17,406.35 Exclude: ® Signage of any kind ® Permit Sincerely Arman PourMirza, PIVIP CITY OF r r_ -- Mobilization/Maintenance of Traffic I 1 Mobilization 1 % 10.W/o 2 Night Work Mobilization 1 % 10.00°'0 3 Maintenance of Traffic 1 % l0 OP/1� 4 Maintenance of Traffic Nightwork 1 % 10.00% Asphalt, Earthwork, and Concrete 5 Inlet Protection System 1-25 EA $200.00 6 Inlet Protection System 26-50 EA $50.00 7 Inlet Protection System 51-100+ EA $50.00 8 Floating Turbidity Barrier 1-200 LF $200.00 9 Floating Turbidity Barrier 201-500 LF WHO 10 Floating Turbidity Barrier 501-1000+ LF $50.00 11 Staked Silt Fence 1.200 LF $20.00 12 Staked Silt Fence 201-500 LF $20.00 13 Staked Silt Fence 501+ LF $5.00 14 Clearing and Grubbing 1 AC $3,ODD.00 15 Curb and Gutter Removal 1-200 LF $0.00 16 Curb and Gutter Removal 201-500 LF $35.00 17 Curb and Gutter Removal 501+ LF $30.00 18 Miscellaneous Concrete Removal 1_200 SY $40:00 19 Existing Pipe Removal 1-200 LF $33.00 20 Existing Pipe Removal 201-500 LF $30.00 21 Existing Pipe Removal 501+ LF $30.00 22 Removal of Existing Pavement 1-200 SY $25:00 23 Removal of Existing Pavement 201-500 SY $23.00 24 Removal of Existing Pavement 501+ SY 520.00 25 Roadway Excavation 1-200 CY $30.00 26 Roadway Excavation 201-500 CY $30.00 27 Roadway Excavation 501+ CY $30.00 28 Swale Grading 1-200 LF $30.00 29 Swale Grading 201-500 LF $25.00 30 Swale Grading 501+ LF $20.00 31 Embankment (Truckload) 1-200 CY $50.00 32 Embankment (Truckload) 201-500 CY $4.5.00 33 Embankment (Truckload) 501+ CY $400 34 Flowable Fill 1-9 CY $400.00 35 Flowable Fill 10-18 CY $50.00 36 Flowable Fill 19-27+ CY $300.00 37 Asphaltic Base Course 1-200 TN $400.00 38 Asphaltic Base Course 201-500 TN $250:00 W, 39 Asphaltic Base Course 501+ TN $230.00 40 Optional Base Group 1 1-200 SY $50.00 41 Optional Base Group 1 201-500 SY $2 .00 42 Optional Base Group 1 501-1000+ SY $25.00 43 Optional Base Group 4 1-200 SY $30.0f1 44 Optional Base Group 4 201-500 SY $28.00 45 Optional Base Group 4 501-1000+ SY $25.00 46 Optional Base Group 6 1-200 SY $30.00 47 Optional Base Group 6 201-500 SY $23.00 48 Optional Base Group 6 501-1000+ SY $2500 49 Optional Base Group 9 1-200 SY $50.00 50 Optional Base Group 9 201-500 SY $45.00 51 Optional Base Group 9 501-1000+ SY $40.00 52 Optional Base Group 11 1-200 SY $50.00 53 Optional Base Group 11 201-500 SY $4500 54 Optional Base Group 11 501-1000+ SY $40.00 55 Milling (1") 1-200 SY 520.00 56 Milling (1") 201-500 SY $0.00 57 Milling (1") 501-1000+ SY $15.00 58 Milling (1.5") 1-200 SY $25.00 59 Milling (1.5") 201-500 SY $23.00 60 Milling (1.5") 501-1000+ SY $20.00 61 Milling (2") 1-200 SY $25.00 62 Milling (2") 201-500 SY $23.00 63 Milling (2") 501-1000+ SY $20.00 64 Milling (3") 1-200 SY $25.00 B5 Milling (3'") 201-500 SY $23.00 66 Milling (3'") 501-1000+ SY $0.00 67 Milling (4") 1-200 SY $25.00 68 Milling (4") 201-500 SY $23.00 69 Milling (4") 501-1000+ SY $20.00 70 Milling (5") 1-200 SY $25.00 71 Milling (5") 201-500 SY $23.00 72 Milling (5"') 501-1000+ SY $20.00 73 Milling (6") 1-200 SY $25.00 74 Milling (6") 201-500 SY $23.00 75 Milling (6") 501-1000+ SY $20.00 76 Type III Asphaltic Concrete 1-200 TN $450.00 77 Type III Asphaltic Concrete 201-500 TN $425.00 78 Type III Asphaltic Concrete 501+ TN $400.00 79 Asphaltic Concrete Type "S-1" 1-200 TN $400.00 80 Asphaltic Concrete Type "S-1" 201-500 TN $350.00 81 Asphaltic Concrete Type "S-1" 501+ TN $300.00 82 Asphaltic Concrete Type "S-3" 1-200 TN $400.00 83 Asphaltic Concrete Type "S-3" 201-500 TN $350.00 84 Asphaltic Concrete Type "S-3" 501+ TN $300.00 85 Adjusting Manholes (Metal Riser Rings) 1-5 EA ;$400.00 86 Adjusting Manholes (Metal Riser Rings) 6-10 EA WHO 87 Adjusting Manholes (Metal Riser Rings) 11-20+ EA $200.00 88 Adjusting Valve Boxes (Metal Riser Rings) 1-5 EA $400.00 89 Adjusting Valve Boxes (Metal Riser Rings) 6-10 EA 200.00 90 Adjusting Valve Boxes (Metal Riser Rings) 11-20+ EA $150.00 91 18" RCP CD - Cl 1-200 LF 200.00 92 18" RCP CID - Cl 201-500 LF WHO 93 18" RCP CID - Cl 501+ LF 140,00 94 Type "A" Curb 1-25 LF SOD 95 Type "A" Curb 26-50 LF $55.00 96 Type "A" Curb 51-100+ LF 50.00 97 Type "B" Curb 1-20 LF $60.00 98 Type "B" Curb 26-50 LF 55.00 99 Type "B" Curb 51-100+ LF W.00 100 Type "D" Curb 1-25 LF 6-0.00 101 Type "D" Curb 26-50 LF Wko 102 Type "D" Curb 51-100+ LF W.00 103 Type "E" Curb 1-25 LF 60.00 104 Type "E" Curb 26-50 LF 55.00 105 Type "E" Curb 51-100+ LF J-0,00 106 Type "F Curb 1-25 LF 107 Type "F Curb 26-50 LF 5-500 108 Type "F" Curb 51-100+ LF �50.00 109 Valley Gutter 1-25 LF P0.00 110 Valley Gutter 26-50 LF $65ko III Valley Gutter 51-100+ LF $60.00 112 Traffic Separator- (4') 1-25 LF $120.00 113 Traffic Separator - (4') 26-50 LF V 10.00 114 Traffic Separator - (4') 51-100+ LF �166:0-6- 115 Traffic Separator - (6') 1-25 LF $430D 116 Traffic Separator - (6') 26-50 LF V210.00 117 Traffic Separator - (6') 51-100+ LF SIMOO 118 Traffic Separator - (width varies) 1-25 SY S130.00 119 Traffic Separator - (width varies) 26-50 SY 120.00 120 Traffic Separator - (width varies) 51-100+ SY .110.00 121 Concrete Sidewalk - (4" thickness) 1-100 SY 105-0 122 Concrete Sidewalk - (4" thickness) 101-250 SY 95.00 123 Concrete Sidewalk - (4" thickness) 251-500+ SY 90.00 124 Concrete Sidewalk - (6" thickness) 1-100 SY 120.00 125 Concrete Sidewalk - (6" thickness) 101-250 SY $110.00 126 Concrete Sidewalk - (6" thickness) 251-500+ SY $100.00 127 Concrete Sidewalk - (6" Thickness) 1-100 SY U20.00 128 Concrete Sidewalk - (6" Thickness) 101-250 SY 7110 -00 129 Concrete Sidewalk - (6" Thickness) 251+ SY $100.00 130 Detectable Warning Surfaces (Inset) 1-50 SF $60.00 131 Detectable Warning Surfaces (Inset) 51-100 SF S60.00 132 Detectable Warning Surfaces (Inset) 101+ SF $50.00 21 Pavement Markings 143 Install Sign (single post) 1-5 EA MOM 144 Install Sign (single post) 6-15 EA V0.00 145 Install Sign (single post) 16-30+ EA $200.00 146 Install Sign (multi -post) 1-5 EA $450.00 147 Install Sign (multi -post) 6-15 EA $400.00 148 Install Sign (multi- post) 16-30+ EA WOO 155 6" Solid Traffic Stripe (paint) (yellow) 1-200 LF $15.00 156 6" Solid Traffic Stripe (paint) (yellow) 201-500 LF $142 161 18" Solid Traffic Stripe (paint) 1-25 LF USA 162 18" Solid Traffic Stripe (paint) 26-50 LF JITOO 170 6" Dotted Guide Lines (paint) 1-50 LF $15D 173 Directional Arrows (Paint) 1-10 EA 1200.00 174 Directional Arrows (Paint) 11-50 EA WHO 175 Directional Arrows (Paint) 51+ EA $160.00 176 Pavement Messages (Paint) 1-10 EA $200.00 177 Pavement Messages (Paint) 11-50 EA 178 Pavement Messages (Paint) 51+ EA 22 179 8" Solid Traffic Stripe (Paint) 1-200 LF $16.00 180 8" Solid Traffic Stripe (Paint) 201-500 LF $15.00 181 8" Solid Traffic Stripe (Paint) 501-1000+ LF 14.00 182 6" Solid Stripe/Extru. Thermo (white) 1-200 LF $20.00 183 6" Solid Stripe/Extru. Thermo (white) 201-500 LF $19.00 184 6" Solid Stripe/Extru. Thermo (white) 501-1000+ LF W.00 185 6" Solid Stripe/Extru. Thermo (yellow) 1-200 LF $210.00 186 6" Solid Stripe/Extru. Thermo (yellow) 201-500 LF S19.00 187 6" Solid Stripe/Extru. Thermo (yellow) 501-1000+ LF $18M 188 12" Solid Traffic Stripe/Extru. Thermo 1-25 LF S2„00 189 12" Solid Traffic Stripe/Extru. Thermo 26-50 LF $19.00 190 12" Solid Traffic Stripe/Extru. Thermo 51-100+ LF M.00 191 18" Solid Traffic Stripe/Extru. Thermo 1-25 LF 52100 192 18" Solid Traffic Stripe/Extru. Thermo 26-50 LF 521.0 193 18" Solid Traffic Stripe/Extru. Thermo 51-100+ LF S"I"On 194 24" Solid Traffic Stripe/Extru. Thermo 1-25 LF $23.00 195 24" Solid Traffic Stripe/Extru. Thermo 26-50 LF 52100 196 24" Solid Traffic Stripe/Extru. Thermo 51-100+ LF $21.00 197 6" Skip Traffic Stripe/Extru. Thermo 1-200 LF 520.00 198 6" Skip Traffic Stripe/Extru. Thermo 201-500 LF S19.00 199 6" Skip Traffic Stripe/Extru. Thermo 501-1000+ LF SISM 200 6" Dotted Guide Lines/Extru. Thermo 1-50 LF 5110.00 201 6" Dotted Guide Lines/Extru. Thermo. 51-100 LF SMOO 202 6" Dotted Guide Lines/Extru. Thermo. 101-150+ LF SIS.00 203 Directional Arrows / Extru. Thermo. 1 EA $200.00 204 Preformed Symbol I EA $200.00 205 Pavement Messages / Extru. Thermo. 1 EA $200.00 206 8" Solid Traffic Stripe / Extru. Thermo 1-200 LF 522.00 207 8" Solid Traffic Stripe / Extru. Thermo 201-500 LF 521.00 208 8" Solid Traffic Stripe / Extru. Thermo 501-1000+ LF $210.00 209 Remove Ex. Pavement Markings(paint) 1-100 SF $15.00 210 Remove Ex. Pavement Markings(paint) 101-300 SF $14.00 211 Remove Ex. Pavement Markings(paint) 301-500+ SF $13.00 212 Rem. Ex. Pavement Markings(thermo) 1-100 SF $15.00 213 Rem. Ex. Pavement Markings(thermo) 101-300 SF 514M 214 Rem. Ex. Pavement Markings(thermo) 301-500+ SF 513.00 TOTAL BID AMOUNT OF ITEMS 5 to 214 ABOVE 522,962.W Item Description ICuntity Unit of Measure Unit Price HOT-IN-PLACE (With Virgin Top Course) Asphalt Recycling 215 Asphalt Recycling 1-10,000 SY No Bid 216 Asphalt Recycling 10,001 - 50,000 Sy No Bid 217 Asphalt Recycling 50,001+ Sy oBid 218 Recycling Agent 1-10,000 GAL No Bid 219 Recycling Agent 10,001 - 50,000 GAL No Bid 220 Recycling Agent 50,001+ GAL No Bid HOT -IN -PLACE (100%) Asphalt Recycling 23 221 Base Course HIPR 1 - 10,000 SY No Bid 222 Base Course HIPR 10,001 - 50,000 SY NioBid 223 Base Course HIPR 50,001+ SY No Bid 224 2" Complete HIPR 1-10,000 SY NoBid 225 2" Complete HIPR 10,001 - 50,000 SY NoBid 226 2" Complete HIPR 50,001+ SY No Bid 227 Asphalt Recycling Agent 1-10,000 SY NoBid 228 Asphalt Recycling Agent 10,001 - 50,000 SY No Bid 229 Asphalt Recycling Agent 50,001+ SY No Bid TOTAL BID AMOUNT OF ITEMS 215 to 229 ABOVE No Bid Item Description Estimated y Unit Of I Measure Unit Price Specialty Paving Methods 1 Mobilization 1 % No Bid, 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % No Bid 4 Maintenance of Traffic Nightwork 1 % No Bid S-1 Rut Fill / Scratch Course (Micro) 1-50 TN No Bid S-2 Rut Fill / Scratch Course (Micro) 51-100 TN No Bid 8-3 Rut Fill / Scratch Course (Micro) 101+ TN NOBd S-4 Single Micro Surface 20-24 Ibs 1-10,000 SY No Bid S-5 Single Micro Surface 20-24 Ibs 10,001 - 50,000 SY ltioBid S-6 Single Micro Surface 20-24 Ibs 50,001+ SY No Bid S-7 Double Micro Surface 30-34 Ibs 1-10,000 SY NoBid 8_8 Double Micro Surface 30-34 Ibs 10,001-50,000 SY No Bid S-g Double Micro Surface 30-34 Ibs 50,001+ SY No Bid TOTAL BID AMOUNT OF ITEMS S-1 to S-9 ABOVE NO Bid Item Description' Estimated Quantity Unit of Measure Unit Price 1 Mobilization 1 % NoBid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 %° No Bid 4 Maintenance of Traffic Nightwork 1 %'No Bid- S-10 Single Chip Seal -#89 Granite 1-10,000 SY No Bid S-11 Single Chip Seal -#89 Granite 10,001 - 50,000 SY NoBid S-12 Single Chip Seal -#89 Granite 50,001+ SY NO Bid S-13 Double Chip Seal-#57 w#89 Granite 1-10,000 SY No Bid S-14 Double Chip Seal -#57 w #89 Granite 10,001 - 50,000 SY No Bid S-15 Double Chip Seal -#57 w#89 Granite 50,001+ SY NO Bid TOTAL BID AMOUNT OF ITEMS S-10 to S-15 ABOVE No Bid Item aescrifition" Estimated quantity Unit of Measure Unit Pride 1 Mobilization 1 % No Bid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % No Bid 4 Maintenance of Traffic Nightwork 1 % No Bid S-16 Full Depth Reclamation /6"-9" 1-10,000 SY No Bid S_17 Full Depth Reclamation /6"-9" 10,001 - 50,000 SY NoBid 24 5-18 I Full Depth Reclamation /6"-9" 50,001+ SY No Bid S-19 Full Depth Reclamation 9"-12` 1-10,000 SY No Bid 5-20 Full Depth Reclamation 9"-12" 10,001 - 50,000 SY No Bid S-21 Full Depth Reclamation 9"-12" 50,001+ SY No Bid 5-22 Cement for Reclamation 1 TN No id 5-23 Emulsion for Reclamation 1 Gal No Bid S-24 Reclaimed Asphalt Paving (RAP) 1-10,000 SY No Bid S-25 Reclaimed Asphalt Paving (RAP) 10,001 - 50,000 SY No Bid S-26 Reclaimed Asphalt Paving (RAP) 50,001+ SY No Bid TOTAL BID AMOUNT OF ITEMS S-16 to 5-26 ABOVE No Bid Item Description Estimated Quantity Unit cif Measure Unitftce 1 Mobilization 1 % NoBid - 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % No Bid 4 Maintenance of Traffic Nightwork 1 % No Bid $-27 Fog Seal 1- 10,000 SY No Bid S-28 Fog Seal 10,001- 50,000 SY No Bid 5-29 Fog Seal 50,000+ SY No Bid TOTAL BID AMOUNT OF ITEMS 5-27 to 5-29 ABOVE No Bid Item Description Estimated Quantity Unit of Measure Unithee 1 Mobilization 1 % No Bid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % No Bid 4 Maintenance of Traffic Nightwork 1 % NoBid 5-30 Cape Seal 1- 10,000 SY NoBid S-31 Cape Seal 10,001- 50,000 SY No Bid S-32 Cape Seal 50,000+ SY N?oBid TOTAL BID AMOUNT OF ITEMS 5-30 to 5-32 ABOVE NOBid Item Description Estimated Quantity Unit of Measure Vitt Fria 1 Mobilization 1 % No Bid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % No Bid 4 Maintenance of Traffic Nightwork 1 % No Bid 5-33 In -Place Recycling-Reconstrction 1- 10,000 SY No Bid 5-34 In -Place Recycling-Reconstrction 10,001- 50,000 SY No Bid 5-35 In -Place Recycling-Reconstrction 50,000+ SY NoBd TOTAL BID AMOUNT OF ITEMS 5-33 to 5-35 ABOVE NOBid Item Description Estimated Quantity Unit of Measure I. t Ake 1 Mobilization 1 % No Bid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % No Bid 4 Maintenance of Traffic Nightwork 1 % No Bid S-36 Crack Filling/Sealing 1-500 GAL No Bid 5-37 Crack Filling/Sealing 501 -1000 GAL No Bid S-38 Crack Filling/Sealing 1,001+ GAL NO Bid W_ TOTAL BID AMOUNT OF ITEMS S-36 to S-38 ABOVE No Bid Item Description Estimated Quantity Unit of Uii!Pfiee Measure I Mobilization 1 % Nlo Bid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic 1 % NTO Bid 4 Maintenance of Traffic Nightwork I % No Bid S-39 Asphalt Rejuvenator 1-50,000 SY No Bid S-40 Asphalt Rejuvenator 50,001 - 100,000 SY 1\To Bid S-41 Asphalt Rejuvenator 100,001+ SY No Bid TOTAL BID AMOUNT OF ITEMS S-39 to S-41 ABOVE No Bid Item Description Estimated Quantity Unitof U'Aitprite Moasuro, I Mobilization I % 10.00% 2 Night Work Mobilization I % 10.00% 3 Maintenance of Traffic I % 10.00% 4 Maintenance of Traffic Nightwork I % 10.00� S-42 Speed Hump W/ Curbing 1-50 FT $240.00 S-43 Speed Hump W/ Curbing 51-100 FT UXOD S-44 Speed Hump W/ Curbing 101+ FT $230,00 S-45 Speed Hump No Curbing 1-50 FT S240.00 S-46 Speed Hump No Curbing 51-100 FT S240.00 8-47 Speed Hump No Curbing 101+ FT S230.00 TOTAL BID AMOUNT OF ITEMS S-42 to S-47 ABOVE $1,420,00 Item Description' Estimated Quantity Unit of Uzi t Pita measure 1 Mobilization 1 % No Bid 2 Night Work Mobilization 1 % No Bid 3 Maintenance of Traffic I % Nio Bid 4 Maintenance of Traffic Nightwork I % No Bid S-48 Slurry Seal 1-10,000 SY No Bid S-49 Slurry Seal 10,001 - 50,000 SY No Bid S-50 Slurry Seal 50,001+ SY No Bid TOTAL BID AMOUNT OF ITEMS S-48 to S-50 ABOVE No Bid 'Quantities are not guaranteed. Final payment will be based on actual quantities. NAME OF CONTRACTOR: Address Width(ft) Length(ft) Thickness (inch) 11 P 1111,11I,!,'IlI Notes Completed roots SF SY ;Q;:,. a «<� / <■ a!=§z\\< . ........ .J«,\\/\\. 1 1 11 1. .. .. \ ...... ..... . . ;*■« »< w y...1 .. � � � � � . .. . . . . � :*■}\ \ a: «� � � \ � � . ... . .. . . � I®■� \� � � � . \ j * • . r pNO y i t i . - . . «!• is i� r r- « .i r .t on side of house 0I'L55 96 10.66 84 . 33 Totals 10,187 LMOS41