Loading...
Item 03 Approval of Change Order No. 2 for Contract ITB #21-008 City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: February 21, 2023 Item #: 3 Contact Name: Milen Womack Department Director: Stephen Krug Contact Number: Ext. 6013 City Manager: Robert Frank Subject: Approval of Change Order No. 2 for Contract ITB #21-008 Downtown Master Stormwater Pond & Park. (Public Works Director Krug) Background Summary: The City Commission awarded the construction contract for construction of Unity Park (FKA Downtown Master Stormwater Pond & Park) at the July 20, 2021 meeting to Prime Construction Group. Over the course of construction, various solutions were implemented to achieve the park vision presented to the City Commission. Below is a list of the various items included in this change order: • 86 Stainless Steel Cover Assemblies for Light Fixture C The original design for the light posts that will be installed along the park boardwalk did not include a housing for the back of the light fixture. A cover for the light fixture was deemed necessary for protection from the elements and for aesthetic purposes. • 6 Additional Type A Light Fixtures Grade level sidewalk lighting was eliminated along the 10-foot sidewalk as it was not feasible to route electrical wiring through the top of the adjacent retaining walls. Therefore, 6 additional 12-foot tall Sternberg light posts were necessary to supply an appropriate level of park lighting. • Ditch Steam Relocation around Private Property The original ditch which drains into Starke Lake crossed over portions of the properties at 130 & 180 N. Bluford Ave. The City acquired 180 N. Bluford Avenue after the project was awarded. In order to remedy ditch erosion issues at 130 N. Bluford Avenue, the contractor was instructed to reroute the ditch completely off of the property and onto the City property at 180 N. Bluford Avenue. This change order covers the time and materials necessary for this work. • Storm/Sanitary Sewer Forcemain Conflict Resolution The original plans called for a 30” stormwater pipe to be installed on N. Kissimmee Avenue under an existing 16” sanitary sewer forcemain. The existing forcemain was installed with a large metal casing that conflicted with the proposed 30” stormwater pipe. A change order was necessary for the time and materials needed to lower the 30” stormwater pipe and to rebuild the roadway. • Stormwater Railroad Crossing A change in material for the jack & bore of a 30” stormwater pipe under the railroad. The originally specified material was not available during construction. Therefore, a change order was necessary to upsize the jack & bore to 36” and use a different material for the 30” stormwater crossing. A credit was given for the original price of the 30” jack & bore. • 11 Composite Boardwalk Pile Base Brackets A change was made to install eleven boardwalk piles directly onto the top of certain pond retaining walls. The original pile locations would have conflicted with the retaining wall footers. A credit was given for the shorter length of composite pile necessary for the installation. Page 10 of 151 City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org • Additional Tree Removal A large camphor tree was removed from N. Cumberland to facilitate the construction of the proposed sidewalk. • Assorted Additional Materials Additional quantities of Florida field stone boulders and 48” RCP pipe were necessary during construction. Prices were extended from the existing line item price. City Staff recommends approval for this change order in the amount of $351,673.26 making the overall contract $8,028,720.11. Issue: Should the Honorable Mayor and City Commissioners approve and sign Change Order No. 2 for Contract ITB #21-008 Downtown Master Stormwater Pond & Park? Recommendations: City Staff recommends the Honorable Mayor and City Commissioners to approve and execute Change Order No. 2 for Contract ITB #21-008 Downtown Master Stormwater Pond & Park with Prime Construction, Inc., for the amount of $351,673.26. Attachments: 1. Change Order No. 02 2. ITB #21-008 Change Order No. 02 Backup Financial Impacts: The available funding for the contract increase of Three Hundred Fifty-One Thousand Six Hundred Seventy- Three Dollars And Twenty-Six Cents ($351,673.26) comes from the project budget (Job Number 18501). Type of Item: Consent Page 11 of 151 Page 12 of 151 Page 13 of 151 Page 14 of 151 Page 15 of 151 Ocoee Stormwater Pond and Park Owner Request #:PCO-004 & PCO-007 Date:2/8/2023 Description: a. 86 Stainless Steel Cover Assemblies for Light Fixture C b. 6 Addional Type A Light Fixtures c. Ditch Stream Relocation around 130 N Bluford Ave, which includes: i. Additional Geo-Fabric ii. Additional Sodding d. Additional Florida Field Stone Boulders e. Additional Tree Removals f. Additional Limerock Base g. Forcemain Conflict Resolution (New 30” Storm vs. Existing 16” Forcemain in Casing) h. Additional 48” RCP i. Jack & Bore upsize from 30” to 36” j. Additional 30” A2 Liner Pipe k. 11 Pile Base Brackets with Installation 4.15 Additional Limerock Base (58.5 Tons at $21.00 per Ton = $1,228.50) 7.10 Additional Florida Field Stone Boulders (6.48 Tons at $300.00 per Ton = $1,944.00) Time Extension - TBD 15% MARKUP FOR EQUIPMENT…....…………………………….$15,651.57 TOTAL CONTRACTOR COST ………………………………………..$264,147.75 GRAND TOTAL …………………………………......…………………………$351,673.26 SUBCONTRACTOR COST ……………………................………………………....$73,769.00 5% MARKUP FOR SUBCONTRACTOR ……..................................…………………………$3,688.45 BOND COST …………………………………….....................................……….$6,895.55 $1,228.50 $1,944.00 15% MARKUP FOR DIRECT LABOR ……………………………….$5,842.33 EQUIPMENT COST ……………………………….................……………$104,343.77 MATERIAL COST ……………………………………………………..$86,401.04 15% MARKUP FOR MATERIAL ………………………………………………..$12,960.16 DIRECT LABOR COST ……………………………………………….$38,948.89 Page 1 of 10 Page 16 of 151 K&J WELLPOINTING INC. INSTALLED 265' WELLPOINTSLIPHAM CONSTRUCTION, LLC. Concrete Structure DS-8 (Reconstruct Onsite)Q-ICE Pile Base Brackets at Top of WallsCentral Florida Underground Upsize Jack & Bore Casing from 30" to 36"Chinchor (6) additional light Fixture ASubcontractor SubcontractorQUANTITY UNIT PRICEINVOICE, RECEIPT, OR CANCELLED CHECK NO(S)AMOUNT$2,500.00LaCosta Sod1 $1,340.000$1,340.00LaCosta Sod1 $2,052.500$2,052.501 $39,221.000$39,221.00Fallen Tree and Harzadous Trees (Removal)1 $1,000.000$1,000.00Camphor Tree Removal AT Cumberland 1 $2,500.000PURCHASED CONSUMABLES COST$73,769.00AMOUNT$0.00$0.00$0.00$0.00PURCHASED CONSUMABLES COST$0.00TOTAL CONSUMABLES COST$73,769.00$0.001 $19,800.000$19,800.001 $2,347.500$2,347.50$2,274.000$3,234.000$2,274.00$3,234.0011Page 2 of 10Page 17 of 151 UNIT MEASEALSLSLSTonSS Enclosures for C-Type Ligh FixturesEATonSUBTOTALSALES TAXMATERIAL BREAKDOWNITEM DESCRIPTION QUANTITY UNIT PRICE INVOICE NO. AMOUNTSOD Materials only1 $322.00 $322.00Geo Fabric: 8-1/2X120 FT PROPEX X3 PYRAMAT 25G1 $20,583.70 $20,583.70 48" x 8' Rinforced Concrete Pipe1 $887.0486 $563.50 $48,461.00Limerock Base (Cemex) Plus Trucking by Cruz 58.5 $21.00 Per 4.15 See CoverFlorida Field Stone Boulders (117.8 T - 111.33 T) 6.48 $300.00 Per 7.10 See Cover$0.00$0.00$0.00$0.00$0.00$0.00$0.00$81,127.74$5,273.30TOTAL MATERIAL COST$86,401.04$887.04A2 LINER 30" (Inserts at Jack & Bore Casing) 1 $10,874.00 $10,874.00Page 3 of 10Page 18 of 151 ST20.00 OT0.00 ST51.00 OT12.00 ST31.00 OT11.00 ST28.00 OT12.00 ST47.00 OT14.00 ST36.00 OT6.00 ST32.00 OT0.00 (1) (2) (3) (4) (5) (6)LABOR BREAKDOWNDIRECT LABORRATE(2) + (3)DIRECTLABOR COST(1) x (5)CLASSIFICATION HOURS BASE RATEHW/PENSION RATEBASE LABORCOST(1) x (2)OPERATOR, LOADER39.600 59.400 0.000 39.600 59.400 $792.00$0.00LABORER, UNSKILLED23.470 35.205 0.000 $1,196.97OPERATOR, LOADER39.600 59.400 0.000 $792.00$0.00$1,227.60$653.4039.600 59.400 $1,227.60$653.40$422.4623.470 35.205 $1,196.97$422.46OPERATOR, EXCAVATOR39.600 59.400 0.000 39.600 59.400 $1,108.80$712.80OPERATOR, EXCAVATOR39.600 59.400 0.000 $1,861.20OPERATOR, UNIVERSAL39.600 59.400 0.000 $1,108.80$712.80$1,425.60$356.4039.600 59.400 $1,425.60$356.40$831.6039.600 59.400 $1,861.20$831.60TOTAL DIRECT LABOR COST$12,678.75INDIRECT LABOR COST65.310 97.965 $2,089.92$0.00TOTAL BASE LABOR$12,678.75FOREMAN, PIPE65.310 97.965 0.000 $2,089.92$0.00$0.00TOTAL LABOR COST$12,678.75Page 4 of 10Page 19 of 151 ST56.00 OT9.00 ST16.00 OT0.00 ST16.00 OT0.00 ST16.00 OT0.00 ST16.00 OT0.00 ST0.00 OT0.00 ST8.00 OT0.00 PIPE, LAYERLABOR BREAKDOWN(1) (2) (3) (4) (5) (6)DIRECT LABORRATE(2) + (3)DIRECTLABOR COST(1) x (5)CLASSIFICATION HOURS BASE RATEHW/PENSION RATEBASE LABORCOST(1) x (2)OPERATOR, LOADER39.600 59.400 23.470 35.205 $1,314.32$316.85FOREMAN, PIPE65.310 97.965 $1,044.96LABORER, UNSKILLED23.470 35.205 0.000 $1,314.32$316.85$633.60$0.0039.600 59.400 $633.60$0.00$0.0065.310 97.965 $1,044.96$0.00OPERATOR, LOADER39.600 39.600 59.400 $633.60$0.00PIPE, LAYER33.740 50.610 $539.84OPERATOR, LOADER39.600 59.400 $633.60$0.00$0.00$0.0039.600 59.400 $0.00$0.00$0.0033.740 50.610 $539.84$0.00TOTAL BASE LABOR$4,753.0933.740 50.610 $269.92$0.0059.400 TOTAL DIRECT LABOR COST$4,753.09INDIRECT LABOR COST$0.00TOTAL LABOR COST$4,753.0933.740 50.610 $269.92$0.00Page 5 of 10Page 20 of 151 HRS12/01 12/02 12/03 12/05 12/06 12/07 12/08 12/10 12/11 12/27 12/28TOTALST8.00 8.00 4.00 20.00 OT0.00 ST8.00 8.00 10.00 5.00 8.00 8.00 4.00 51.00 OT2.00 8.00 2.00 12.00 ST8.00 8.00 10.00 5.00 31.00 OT2.00 9.00 11.00 ST8.00 8.00 8.00 4.00 28.00 OT2.00 8.00 2.00 12.00 ST8.00 8.00 10.00 5.00 8.00 8.00 47.00 OT2.00 10.00 2.00 14.00 ST8.00 8.00 8.00 8.00 4.00 36.00 OT2.00 4.00 6.00 ST8.00 8.00 4.00 8.00 4.00 32.00 OT0.00 ST10.00 8.00 10.00 8.00 8.00 8.00 4.00 56.00 OT8.00 1.00 9.00 ST8.00 8.00 16.00 OT0.00 ST8.00 8.00 16.00 OT0.00 ST8.00 8.00 16.00 OT0.00 ST8.00 8.00 16.00 OT0.00 ST0.00 OT0.00 ST8.00 8.00 OT0.00 OPERATOR, LOADERWILSON O PADILLA ESTRELLAPIPE, LAYER WILSON PIERREDAILY LABOR BREAKDOWNWORK DATES (MONTH/DAY)CLASSIFICATION NAMEOPERATOR, LOADERANTHONY P MORCIGLIOLABORER, UNSKILLED BYRON SMITHOPERATOR, LOADER DANIEL HILLOPERATOR, UNIVERSALEMMANUEL CRUZ DIAZOPERATOR, EXCAVATOR ERICK ELBAOPERATOR, EXCAVATORFRANKIE CRUZ RIVERAFOREMAN, PIPEKELI'IMANAHO'OMALU L KA-NEOPERATOR, LOADER LYNDON J LAFONDPIPE, LAYER NEFTALI RUIZLABORER, UNSKILLED MORRIS L HOLLEYFOREMAN, PIPECHANCE WILLIAM TUBBOPERATOR, LOADER GREGORY T NEALPage 6 of 10Page 21 of 151 - 1.00 1.00 OT OT56.00 $4,400.48/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT64.00 $408.32/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT36.00 $2,563.56/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT42.00 $1,410.36/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT32.00 $2,519.04/ 1.00 1.00 SB SB0.00 $0.00$11,301.76$0.00$0.00$0.00$0.00$11,301.76EQUIPMENT BREAKDOWNOWNED EQUIPMENT DESCRIPTIONYRSEC-PG*QTR/YR*MNTHLY RATE**EQUIP ADJAREA AJDADJ HRLY RATE+OPER COSTTOTAL HRLYRATE++HOURS AMOUNT333G SKID LOADER, TRACK13,830.08 13,830.08 78.58 78.58 39.29 EC - L. KANE1,122.88 1,122.88 6.38 6.38 3.19 71.21 35.61 JD 35G COMPACT EXC5,910.08 5,910.08 33.58 33.58 16.79 INGERSOL RAND SD45DTF ROLLER12,532.96 12,532.96 71.21 78.72 39.36 OWNED EQUIPMENT COSTRENTED EQUIPMENT DESCRIPTIONRENTAL COSTTRANSPORTATION COST(IF SEPARATE)INVOICE, RECEIPT, OR CANCELLED CHECK NO(S)L110E WHEEL LOADER13,854.72 13,854.72 78.72 AMOUNTRENTED EQUIPMENT COSTTOTAL EQUIPMENT COSTPage 7 of 10Page 22 of 151 - 1.00 1.00 OT OT40.00 $1,085.20/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT45.00 $5,867.10/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT32.00 $5,739.20/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT32.00 $4,153.92/ 1.00 1.00 SB SB0.00 $0.00- 1.00 1.00 OT OT0.00 $0.00/ 1.00 1.00 SB SB61.00 $194.59$17,040.01$0.00$0.00$0.00$0.00$17,040.01EQUIPMENT BREAKDOWNTOTAL HRLYRATE++HOURS AMOUNTLK F150 SUPERCREW 4X44,774.88 4,774.88 27.13 27.13 13.57 OWNED EQUIPMENT DESCRIPTIONYRSEC-PG*QTR/YR*MNTHLY RATE**EQUIP ADJAREA AJDADJ HRLY RATE+OPER COSTPC238USLC-11 EXCAVATOR22,946.88 22,946.88 130.38 130.38 65.19 179.35 89.68 Dozer0.00 0.00 129.81 129.81 64.91 PC360LC-11 EXCAVATOR31,565.60 31,565.60 179.35 6.38 3.19 OWNED EQUIPMENT COSTRENTED EQUIPMENT DESCRIPTIONRENTAL COSTTRANSPORTATION COST(IF SEPARATE)INVOICE, RECEIPT, OR CANCELLED CHECK NO(S)Container6.38 AMOUNTRENTED EQUIPMENT COSTTOTAL EQUIPMENT COSTPage 8 of 10Page 23 of 151 - 1.00 1.00 OT OT0.00 $0.00/ 1.00 1.00 SB SB16.00 $351.52-OT OT0.00 $0.00/SB SB0.00 $0.00-OT OT0.00 $0.00/SB SB0.00 $0.00-OT OT0.00 $0.00/SB SB0.00 $0.00-OT OT0.00 $0.00/SB SB0.00 $0.00$351.52$0.00$0.00$0.00$0.00$351.52EQUIPMENT BREAKDOWNTOTAL HRLYRATE++HOURS AMOUNTSM300 BROOM43.94 43.94 21.97 OWNED EQUIPMENT DESCRIPTIONYRSEC-PG*QTR/YR*MNTHLY RATE**EQUIP ADJAREA AJDADJ HRLY RATE+OPER COST0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 OWNED EQUIPMENT COSTRENTED EQUIPMENT DESCRIPTIONRENTAL COSTTRANSPORTATION COST(IF SEPARATE)INVOICE, RECEIPT, OR CANCELLED CHECK NO(S)RENTED EQUIPMENT COSTTOTAL EQUIPMENT COSTAMOUNTPage 9 of 10Page 24 of 151 HRS12/01 12/02 12/05 12/06 12/07 12/08 12/11 12/27 12/28TOTALOT8.00 8.00 8.00 8.00 8.00 8.00 8.00 56.00 SB0.00 OT8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 64.00 SB0.00 OT8.00 8.00 2.00 2.00 8.00 8.00 36.00 SB0.00 OT16.00 16.00 2.00 8.00 42.00 SB0.00 OT8.00 8.00 8.00 8.00 32.00 SB0.00 OT8.00 8.00 4.00 8.00 8.00 4.00 40.00 SB0.00 OT8.00 8.00 8.00 5.00 8.00 8.00 45.00 SB0.00 OT8.00 8.00 8.00 8.00 32.00 SB0.00 OT8.00 8.00 8.00 8.00 32.00 SB0.00 OT0.00 SB8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 61.00 OT0.00 SB8.00 8.00 16.00 OT0.00 SB0.00 INGERSOL RAND SD45DTF ROLLERDAILY EQUIPMENT BREAKDOWNUSE DATES (MONTH/DAY)EQUIPMENT DESCRIPTION333G SKID LOADER, TRACKEC - L. KANEContainerSM300 BROOMJD 35G COMPACT EXCL110E WHEEL LOADERLK F150 SUPERCREW 4X4PC238USLC-11 EXCAVATORPC360LC-11 EXCAVATORDozerPage 10 of 10Page 25 of 151 ST 20.50 OT 0.00 ST 30.00 OT 0.00 ST 40.00 OT 0.00 ST 42.50 OT 0.00 ST 64.00 OT 3.50 ST 8.00 OT 1.00 ST 8.00 OT 1.00 ST 8.00 OT 1.00 ST 8.00 OT 1.00 ST 8.00 OT 1.00 ST 40.00 OT 1.00 ST 42.00 OT 3.00 ST 54.50 OT 0.00 ST 24.00 OT 0.00 ST 54.00 OT 0.50 ST 25.50 OT 0.00 ST 46.00 OT 0.50 ST 45.00 OT 0.50 ST 0.00 OT 0.00 (1) (2) (3) (4) (5) (6) LABOR BREAKDOWN DIRECT LABOR RATE (2) + (3) DIRECT LABOR COST (1) x (5) CLASSIFICATION HOURS BASE RATE HW/PENSION RATE BASE LABOR COST (1) x (2) FOREMAN, PIPE 65.310 97.965 0.000 39.600 59.400 $811.80 $0.00 OPERATOR, EXCAVATOR 39.600 59.400 0.000 $1,188.00 OPERATOR, LOADER 39.600 59.400 0.000 $811.80 $0.00 $2,612.40 $0.00 65.310 97.965 $2,612.40 $0.00 $0.00 39.600 59.400 $1,188.00 $0.00 OPERATOR, EXCAVATOR 39.600 59.400 0.000 26.400 39.600 $1,122.00 $0.00 LABORER 26.400 39.600 0.000 $1,689.60 LABORER 26.400 39.600 0.000 $1,122.00 $0.00 $316.80 $59.40 39.600 59.400 $316.80 $59.40 $138.60 26.400 39.600 $1,689.60 $138.60 $8,189.40 26.400 39.600 $211.20 $39.60 TOTAL BASE LABOR $8,189.40 LABORER 26.400 39.600 0.000 $211.20 $39.60 TOTAL DIRECT LABOR COST $8,189.40 INDIRECT LABOR COST $0.00 LABOR BREAKDOWN (1) (2) (3) (4) TOTAL LABOR COST (5) (6) DIRECT LABOR RATE (2) + (3) DIRECT LABOR COST (1) x (5) CLASSIFICATION HOURS BASE RATE HW/PENSION RATE BASE LABOR COST (1) x (2) LABORER 26.400 39.600 0.000 26.400 39.600 $211.20 $39.60 FOREMAN, IN TRAINING 65.310 97.965 0.000 $522.48 LABORER 26.400 39.600 0.000 $211.20 $39.60 $211.20 $39.60 26.400 39.600 $211.20 $39.60 $97.97 65.310 97.965 $522.48 $97.97 LABORER 26.400 39.600 0.000 26.400 39.600 $1,056.00 $39.60 OPERATOR, EXCAVATOR 39.600 59.400 0.000 $1,663.20 LABORER 26.400 39.600 0.000 $1,056.00 $39.60 $1,438.80 $0.00 26.400 39.600 $1,438.80 $0.00 $178.20 39.600 59.400 $1,663.20 $178.20 TOTAL LABOR COST $6,448.25 39.600 59.400 $950.40 $0.00 TOTAL BASE LABOR $6,448.25 OPERATOR, LOADER 39.600 59.400 0.000 $950.40 $0.00 TOTAL DIRECT LABOR COST $6,448.25 INDIRECT LABOR COST $0.00 LABOR BREAKDOWN (1) (2) (3) (4) (5) (6) DIRECT LABOR RATE (2) + (3) DIRECT LABOR COST (1) x (5) CLASSIFICATION HOURS BASE RATE HW/PENSION RATE BASE LABOR COST (1) x (2) LABORER 26.400 39.600 0.000 39.600 59.400 $2,138.40 $29.70 FOREMAN, PIPE 65.310 97.965 0.000 $1,665.41 OPERATOR, EXCAVATOR 39.600 59.400 0.000 $2,138.40 $29.70 $1,214.40 $19.80 26.400 39.600 $1,214.40 $19.80 $0.00 65.310 97.965 $1,665.41 $0.00 0.000 0.000 $0.00 $0.00 39.600 59.400 $1,782.00 $29.70 $0.00 OPERATOR, EXCAVATOR 39.600 59.400 0.000 $1,782.00 $29.70 TOTAL DIRECT LABOR COST $6,879.41 INDIRECT LABOR COST $0.00 TOTAL LABOR COST $6,879.41 TOTAL BASE LABOR $6,849.71 $0.00 Page 3 of 11 Page 26 of 151 HRS 06/14 06/16 06/17 06/20 06/21 07/20 08/22 08/23 08/24 08/25 08/26 08/29 TOTAL ST 7.50 3.00 8.00 2.00 20.50 OT 0.00 ST 6.00 8.00 8.00 3.00 5.00 30.00 OT 0.00 ST 6.00 8.00 4.00 6.00 8.00 8.00 40.00 OT 0.00 ST 8.50 3.00 5.00 2.00 8.00 8.00 8.00 42.50 OT 0.00 ST 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 64.00 OT 0.50 1.00 1.00 1.00 3.50 ST 8.00 8.00 OT 1.00 1.00 ST 8.00 8.00 OT 1.00 1.00 ST 8.00 8.00 OT 1.00 1.00 ST 8.00 8.00 OT 1.00 1.00 ST 8.00 8.00 OT 1.00 1.00 ST 8.00 8.00 8.00 8.00 8.00 40.00 OT 1.00 1.00 ST 8.00 8.00 8.00 8.00 8.00 2.00 42.00 OT 1.00 1.00 1.00 3.00 HRS 09/06 09/07 09/08 09/13 09/15 09/16 09/17 09/19 09/20 09/21 TOTAL ST 8.00 1.00 8.00 8.00 5.00 8.00 8.50 8.00 54.50 OT 0.00 ST 8.00 8.00 8.00 24.00 OT 0.00 ST 8.00 1.00 8.00 8.00 5.00 8.00 8.00 8.00 54.00 OT 0.50 0.50 ST 8.00 1.00 2.00 1.00 8.00 2.00 1.50 2.00 25.50 OT 0.00 ST 1.00 8.00 8.00 5.00 8.00 8.00 8.00 46.00 OT 0.50 0.50 ST 8.00 8.00 5.00 8.00 8.00 8.00 45.00 OT 0.50 0.50 ST 0.00 OT 0.00 DAILY LABOR BREAKDOWN WORK DATES (MONTH/DAY) CLASSIFICATION NAME OPERATOR, LOADER DANIEL HILL OPERATOR, EXCAVATOR FRANKIE CRUZ RIVERA FOREMAN, PIPE KELI'IMANAHO'OMALU L KA-NE LABORER MORRIS L HOLLEY LABORER SOLOM WILLIAMS OPERATOR, EXCAVATOR ANDRES E MONAGAS TERAN LABORER DEMARIO A WEEKS LABORER DONNELL D DORITY FOREMAN, IN TRAINING KENNETH LEE LANE LABORER TIMOTHY Z MILLER LABORER BYRON SMITH OPERATOR, EXCAVATOR ERICK ELBA DAILY LABOR BREAKDOWN WORK DATES (MONTH/DAY) CLASSIFICATION NAME LABORER BYRON SMITH OPERATOR, LOADER DANIEL HILL OPERATOR, EXCAVATOR FRANKIE CRUZ RIVERA OPERATOR, EXCAVATOR ERICK ELBA FOREMAN, PIPE KELI'IMANAHO'OMALU L KA-NE LABORER MORRIS L HOLLEY Page 4 of 11 Page 27 of 151 - 1.00 1.00 OT OT 48.00 $3,771.84 / 1.00 1.00 SB SB 0.00 $0.00 -OT OT 0.00 $0.00 /SB SB 0.00 $0.00 - 1.00 1.00 OT OT 44.00 $3,463.68 / 1.00 1.00 SB SB 0.00 $0.00 - 1.00 1.00 OT OT 53.00 $1,437.89 / 1.00 1.00 SB SB 0.00 $0.00 - 1.00 1.00 OT OT 16.00 $2,086.08 / 1.00 1.00 SB SB 0.00 $0.00 $10,759.49 From To 8/1/22 8/31/22 $2,632.00 7/21/22 8/17/22 $1,527.21 8/18/22 9/14/22 $1,774.46 7/21/22 8/18/22 $1,071.00 8/19/22 9/15/22 $771.06 7/8/22 8/5/22 $2,320.30 8/29/22 9/26/22 $2,616.36 9/6/22 10/4/22 $2,348.97 8/12/22 9/9/22 $2,201.13 8/22/22 9/29/22 $1,080.34 $0.00 $0.00 $18,342.83 $29,102.32 EQUIPMENT BREAKDOWN 2057072 494003 508038 Rental Period Invoice # TOTAL HRLY RATE++ HOURS CX36B COMPACT EXC 0.00 0.00 78.72 39.36 LK F150 SUPERCREW 4X4 4,774.88 AMOUNT 333G SKID LOADER, TRACK 13,830.08 13,830.08 78.58 OWNED EQUIPMENT DESCRIPTION YR SEC-PG* QTR/YR* MNTHLY RATE** EQUIP ADJ AREA AJD ADJ HRLY RATE+ OPER COST 78.58 39.29 4,774.88 27.13 27.13 13.57 L110E WHEEL LOADER 13,854.72 13,854.72 78.72 130.38 65.19 OWNED EQUIPMENT COST RENTED EQUIPMENT DESCRIPTION RENTAL COST SUPPLIER PC228USLC-10 EXCAVATOR 22,946.88 22,946.88 130.38 AMOUNT MOT Devices $2,632.00 ACME Barricade WellPoint 6" Piston Pump 208746076-001 208746076-002 210138760-001 209408005-003 Dewatering Pump 6" Vac $2,320.30 United Rentals 207264887-002 209545822-001 209545822-001 $1,527.21 $1,774.46 $1,071.00 $771.06 $2,616.36 RENTED EQUIPMENT COST TOTAL EQUIPMENT COST Road Crossing Pump Discharge Trench Roller 8x16 Steel Trench Box 4" Wal 8x16 Steel Trench Box 4" Wal Pump Discharge 6" Hoses Pump Discharge 6" Hoses Dewatering Pump 6" Vac National Trench Safety National Trench Safety United Rentals United Rentals United Rentals United Rentals United Rentals Sunbelt $2,348.97 $2,201.13 $1,080.34 Page 6 of 11 Page 28 of 151 - 1.00 1.00 OT OT 16.00 $537.28 / 1.00 1.00 SB SB 0.00 $0.00 - 1.00 1.00 OT OT 8.00 $51.04 / 1.00 1.00 SB SB 0.00 $0.00 - 1.00 1.00 OT OT 8.00 $217.04 / 1.00 1.00 SB SB 0.00 $0.00 - 1.00 1.00 OT OT 54.00 $344.52 / 1.00 1.00 SB SB 0.00 $0.00 -OT OT 0.00 $0.00 /SB SB 0.00 $0.00 $1,149.88 Hour 21.09$ $33,400.84 $0.00 $0.00 $33,400.84 $34,550.72 - 1.00 1.00 OT OT 48.00 $6,258.24 / 1.00 1.00 SB SB 0.00 $0.00 - 1.00 1.00 OT OT 32.00 $5,739.20 / 1.00 1.00 SB SB 0.00 $0.00 -OT OT 0.00 $0.00 /SB SB 0.00 $0.00 -OT OT 0.00 $0.00 /SB SB 0.00 $0.00 -OT OT 40.00 $0.00 /SB SB 0.00 $0.00 $11,997.44 $0.00 $0.00 $0.00 $0.00 $11,997.44 EQUIPMENT BREAKDOWN TOTAL HRLY RATE++ HOURS AMOUNT Rental 26 - 35 MT Excavator 5,910.08 5,910.08 33.58 OWNED EQUIPMENT DESCRIPTION YR SEC-PG* QTR/YR* MNTHLY RATE** EQUIP ADJ AREA AJD ADJ HRLY RATE+ OPER COST 33.58 16.79 EC - K. LANE 1,122.88 1,122.88 6.38 6.38 3.19 27.13 13.57 EC - L. KANE 1,122.88 1,122.88 6.38 6.38 3.19 KL F150 CREW CAB 4X4 4,774.88 4,774.88 27.13 0.00 0.00 OWNED EQUIPMENT COST FUEL INGERSOL RAND SD45DTF ROLLER RENTED FUEL COST TOTAL EQUIPMENT COST AMOUNT Dewatering Pumps ( for 66 Days)1,584.00 EQUIPMENT BREAKDOWN TOTAL HRLY RATE++ HOURS AMOUNT PC238USLC-11 EXCAVATOR 22,946.88 22,946.88 130.38 OWNED EQUIPMENT DESCRIPTION YR SEC-PG* QTR/YR* MNTHLY RATE** EQUIP ADJ AREA AJD ADJ HRLY RATE+ OPER COST 130.38 65.19 PC360LC-11 EXCAVATOR 31,565.60 31,565.60 179.35 179.35 89.68 0.00 0.00 Rental Dozer 0.00 0.00 JD 35G COMPACT EXC 0.00 0.00 OWNED EQUIPMENT COST RENTED EQUIPMENT DESCRIPTION RENTAL COST TRANSPORTATION COST (IF SEPARATE) INVOICE, RECEIPT, OR CANCELLED CHECK NO(S) PC238USLC-11 EXCAVATOR RENTED EQUIPMENT COST TOTAL EQUIPMENT COST AMOUNT Page 7 of 11 Page 29 of 151 HRS 06/14 06/20 07/20 08/22 08/23 08/24 08/25 08/26 08/29 09/06 09/07 09/08 TOTAL OT 8.00 8.00 8.00 8.00 8.00 8.00 48.00 SB 0.00 OT 0.00 SB 0.00 OT 8.00 4.00 4.00 4.00 8.00 8.00 8.00 44.00 SB 0.00 OT 8.00 8.00 4.00 6.00 8.00 8.00 8.00 1.00 2.00 53.00 SB 0.00 OT 8.00 8.00 16.00 SB 0.00 OT 8.00 8.00 16.00 SB 0.00 OT 8.00 8.00 SB 0.00 OT 8.00 8.00 SB 0.00 OT 8.00 8.00 8.00 8.00 8.00 4.00 8.00 2.00 54.00 SB 0.00 OT 0.00 SB 0.00 OT 8.00 8.00 8.00 8.00 8.00 8.00 48.00 SB 0.00 OT 8.00 8.00 8.00 8.00 32.00 SB 0.00 HRS 09/09 09/12 09/13 09/15 09/16 09/17 09/19 09/20 09/21 TOTAL OT 8.00 8.00 8.00 8.00 8.00 40.00 SB 0.00 OT 1.00 8.00 8.00 2.00 1.50 2.00 22.50 SB 0.00 OT 8.00 8.00 8.00 8.00 8.00 40.00 SB 0.00 OT 8.00 8.00 8.00 8.00 8.00 40.00 SB 0.00 OT 8.00 8.00 8.00 8.00 32.00 SB 0.00 OT 0.00 SB 0.00 DAILY EQUIPMENT BREAKDOWN EC - L. KANE USE DATES (MONTH/DAY) EQUIPMENT DESCRIPTION 333G SKID LOADER, TRACK CX36B COMPACT EXC L110E WHEEL LOADER LK F150 SUPERCREW 4X4 PC228USLC-10 EXCAVATOR Rental 26 - 35 MT Excavator EC - K. LANE KL F150 CREW CAB 4X4 INGERSOL RAND SD45DTF ROLLER PC238USLC-11 EXCAVATOR PC360LC-11 EXCAVATOR DAILY EQUIPMENT BREAKDOWN PC238USLC-11 EXCAVATOR USE DATES (MONTH/DAY) EQUIPMENT DESCRIPTION LK F150 SUPERCREW 4X4 EC - L. KANE L110E WHEEL LOADER 333G SKID LOADER, TRACK Page 8 of 11 Page 30 of 151 Estimate DATE 12/16/2022 ESTIMATE NO. 43378 NAME / ADDRESS PRIME CONSTRUCTION GROUP 1000 JETSTREAM DRIVE ORLANDO, FL 32824 Ship To PRIME CONSTRUCTION GROUP, INC. 1000 JETSTREAM DRIVE ORLANDO FL 32824 ***EMAIL INVOICES*** FLORIDA METAL CRAFT, INC PO BOX 771179 WINTER GARDEN, FL 34777-1179 TERMS NET 30 REP AJ FOB FLORIDA METAL SIGNATURE Phone # 407.656.1100 Fax # 407.656.6970 FAX E-mail dawn@floridametalcraft.com Web Site WWW.FLORIDAMETALCRAFT.COM TOTAL SALES TAX (6.5%) DESCRIPTION QTY COST TOTAL CABLE RAIL QUICK CONNECT FITTINGS 2,236 34.74 77,678.64T STAINLESS STEEL 3/16" CABLE 32,800 1.52 49,856.00T OPEN UP HOLES IN LIGHT POST I-BEAM. ESTIMATED QTY: 86. 86 145.00 12,470.00T FABRICATE FRONT SHROUD FOR POST, WELD IN PLACE. ESTIMATED QUANTITY: 86. 86 70.00 6,020.00T FABRICATE BACK COVER FOR POST, DRILL AND TAP TO MOUNT. ESTIMATED QUANTITY: 86. 86 563.50 48,461.00T *INSTALLATION TO BE DONE BY OTHERS* **FMC WILL BUILD ONE UNIT FOR QUALITY CONTROL AND INSPECTION PURPOSES. PRICE SUBJECT TO CHANGE UPON ANY REQUESTED CHANGES** **LEAD TIME APPROXIMATELY 3-6 WEEKS** **FMC REQUESTS A DEPOSIT OF THE FIRST LINE ITEM IN ORDER TO PROCURE MATERIALS. THE DEPOSIT AMOUNT WILL BE $77,678.64 PLUS TAX.** _____________________________________ ***ESTIMATES VALID FOR 5 BUSINESS DAYS*** ***DUE TO THE INCREASE OF MATERIALS, ESTIMATE MAY VARY 20%, AT TIME OF ACCEPTANCE*** $207,127.21 $12,641.57 Page 31 of 151 801 THORPE ROAD ORLANDO, FL 32824-8016 Please contact with Questions: 407-859-7473 INVOICE NUMBER 1971589 TOTAL DUE $20,583.70 CUSTOMER 64898 PAGE 1 of 1 PLEASE REFER TO INVOICE NUMBER WHEN MAKING PAYMENT AND REMIT TO: FEL-ORLANDO WATERWORKS #126 PO BOX 100286 ATLANTA, GA 30384-0286 PRIME CONSTRUCTION GROUP 1000 JETSTREAM DRIVE DOWNTOWN MASTER SW POND & ORLANDO, FL 32824 SHIP TO: PRIME CONSTRUCTION GROUP 28 W FRANKLIN ST DOWNTOWN MASTER SW POND & PARK ATTN RANDY 8135769655 SHIP WHSE. SELL WHSE. TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH 126 126 FL2ORA GILBERT 022 DOWNTOWN MASTER SW POND &12/01/22 IO 108690 ORDERED 25 5 SHIPPED 25 5 ITEM NUMBER ACFPYRAMAT25 ACFPINS00012 DESCRIPTION 8-1/2X120 FT PROPEX X3 PYRAMAT 25G 12 PINS 100 PER BX INVOICE SUB-TOTAL TAX UNIT PRICE 768.400 37.000 UM RL BX AMOUNT 19210.00 185.00 19395.00 1188.70Orange *************************************************************************************************** LEAD LAW WARNING: IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT "LEAD FREE" IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION. PRODUCTS WITH *NP IN THE DESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS. BUYER IS SOLELY RESPONSIBLE FOR PRODUCT SELECTION. TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $20,583.70 All past due amounts are subject to a service charge of 1.5% per month, or the maximum allowed by law, if lower. If Buyer fails to pay within terms, then in addition to other remedies, Buyer agrees to pay Seller all costs of collection, including reasonable attorney fees. Complete terms and conditions are available upon request or at https://www.ferguson.com/content/website-info/terms-of-sale, incorporated by reference. Seller may convert checks to ACH. *Any reference to or incorporation of Executive Order 14042 and/or the EO-implementing Federal clauses (FAR 52.223 -99 and/or DFARS 252.223-7999) is expressly rejected by Seller and shall not apply as Seller is a materials supplier and therefore exempt under the Executive Order.* Looking for a more convenient way to pay your bill? Log in to Ferguson.com and request access to Online Bill Pay. SURTAX ALREADY PAID ON INVOICE 1897526 Page 32 of 151 CHANGE ORDER REQUEST # 2 To: Gilbert Vincent Date: 10/26/22 Street Address: 1000 Jetstream Drive City/State/Zip: Orlando, FL Project Name: Ocoee Downtown Stormwater Pond Phone: CEI Job #:221PCG09 Fax: Location: Ocoee In accordance with our Contract Agreement relating to the above referenced project, the following changes are hereby authorized. The work covered by this change order shall be performed under the same terms and conditions as the original Sub-Contract and as may be modified before this Change Order. This Change Order is being issued to reflect the following changes to the scope of the Contract Agreement: SCOPE: Install six (6) additional light Fixture A (includes light pole bases, light poles, fixtures, ground box, conduit, conductors and terminations). ________________________________________________________________________________________ The Original Contract Sum …………………………………………………...$249,352.00 Net Change Orders Previously Authorized………………………………...$0.00 Revised Contract Sum Prior to this Change Order…………………….…$249.352.00 The sum increase (decreased) by this Change Order……………….…..$39,221.00 The new Revised Contract Sum including this Change Order…………$288,573.00 Accepted by: Accepted by: Chinchor Electric, Inc. ____________________________________ Signature: ____________________________ Signature: ____________________________ Title: ________________________________ Title: ________________________________ Date: ________________________________ Date: ____________________________ 1 460 S. LEA VITT AVE. ORANGE CIT Y, FL 3276 3 3 86.774. 1020 PH 3 86. 774. 7223 FX W WW . CHINCHOR ELECTRI C. COM CHINCHOR ELECTRIC, INC. Florida EC 0002457 & EC13004865 Page 33 of 151 Loca tionInvoice For Prime Construct ion Goup, Inc. 1000 Jetstream Dr. Orla ndo, FL 32824 main: 407.856.8180 kka ne@primeconstructiong roup.com 21797 – Downtown Master Stormwa ter Terms due upon completion ITEM DE SCRIPT ION QUANTITY UNIT PRICE AMOUNT 1) Tree Service:Tree Removal - Ca mphor Tree Removal of Ca mphor Tree to the g round a nd ha ul away debris. 1 $ 2 ,500 .00 $ 2,50 0.00 $ 2,5 00.0 0 $ 0.0 0 $ 2,5 00.0 0 11/23/202 2 All ba la nces not paid by the due date a re subject to la te fees. Please ma il checks to the abov e a ddress. Please use the contact informa tion below for inquiries about this invoice. SUBTOTAL SAL ES TAX INVOICE TOTAL DUE DATE Bra ndon Mobile: 407-289-6346 bra ndon@ka rneytree.com Mike Karney Office: 407-432-2944 mike@karney tree.com As sig ned To Mike Karney Office: 407-432-2944 mike@karneytree.com Sales R eps Invoice #3881 Date: 11/23/2022 From: Mike Karney Karney Tree Service 17121 Live Oa k C ourt Winter Ga rden, FL. 34787 Karney Tree Service | www.Ka rneyTree.com | 407-432-2944 | Ka rneyTreeServ ice@gmail.com Pa g e 1 of 1 Page 34 of 151 Loca tion Ocoee, FL Inv oice For Prime Construct ion Goup, Inc. 1000 Jetstream Dr. Orla ndo, FL 32824 main: 407.856.8180 kka ne@primeconstructiong roup.com C ity of Ocoee storm wa ter ret. Tree Rem Terms due upon completion ITEM DE SCRIPT ION QUANTITY UNIT PRICE AMOUNT 1) Tree Service:Tree Removal Removal of 6 entire trees to the ground and grind the stumps. 1 $ 3 ,000 .00 $ 3,00 0.00 $ 3,0 00.0 0 $ 0.0 0 $ 3,0 00.0 0 01/27/202 3 All ba la nces not paid by the due date a re subject to la te fees. Please ma il checks to the abov e a ddress. Please use the contact informa tion below for inquiries about this invoice. SUBTOTAL SAL ES TAX INVOICE TOTAL DUE DATE Accounting a ccounting@primeconstructiongroup.com Cont acts Bra ndon Mobile: 407-289-6346 bra ndon@karneytree.com As s ig ned To Mike Karney Office: 407-432-2944 mike@karney tree.com Sales R eps Invoice #3902 Date: 01/27/2023 From: Mike Karney Karney Tree Service 17121 Live Oa k C ourt Winter Ga rden, FL. 34787 Karney Tree Service | www.Ka rneyTree.com | 407-432-2944 | Ka rneyTreeServ ice@gmail.com Pa g e 1 of 1 Page 35 of 151 PAGE 1 OF 1INVOICECEMEX 800 N Magnolia Ave Ste 300 Orlando FL 32803-3261 CEMEX Construction Materials Florida, LLC Date:12/05/2022 Invoice No:9447302288 Terms: Net 10th prox Payment Due On:01/10/2023 Job No: 15320522 Legal Address: 1000 JETSTREAM DR, ORLANDO Customer Job No:ORLANDO YARD Account No:3016553 Account Name: PRIME CONSTRUCTION GROUP INC PRIME CONSTRUCTION GROUP INC 1000 JETSTREAM DR ORLANDO FL 32824-7106 For All Inquiries Call: 407-243-5350 Remit To: CEMEX | PO Box 730197 | Dallas, TX 75373-0197 DETAILED INFORMATION BY PO PO Number: ORLANDO YARD DELIVERY ADDRESS: 1000 JETSTREAM DR, ORLANDO, Center Hill, FL, 33514 Ship Date Delivery Ref #.Product Code / Description Qty UOM Net Price By UOM Units Amount Freight Tx 12/05/2022 8099255763 1038135608 1037371 Limerk Base Cert for FDOT Code 01 29.500 TON $10.00 1 TON 29.500 $295.00 $0.00 T 12/05/2022 8099255763 1038135608 1614495 ENVIRONMENTAL CHARGE PER TON 29.500 TON $0.20 1 TON 29.500 $5.90 $0.00 T 12/05/2022 8099255764 1038135609 1037371 Limerk Base Cert for FDOT Code 01 28.520 TON $10.00 1 TON 28.520 $285.20 $0.00 T 12/05/2022 8099255764 1038135609 1614495 ENVIRONMENTAL CHARGE PER TON 28.520 TON $0.20 1 TON 28.520 $5.70 $0.00 T 12/05/2022 8099255772 1038135618 1037371 Limerk Base Cert for FDOT Code 01 29.260 TON $10.00 1 TON 29.260 $292.60 $0.00 T 12/05/2022 8099255772 1038135618 1614495 ENVIRONMENTAL CHARGE PER TON 29.260 TON $0.20 1 TON 29.260 $5.85 $0.00 T 12/05/2022 8099255797 1038135649 1037371 Limerk Base Cert for FDOT Code 01 28.660 TON $10.00 1 TON 28.660 $286.60 $0.00 T 12/05/2022 8099255797 1038135649 1614495 ENVIRONMENTAL CHARGE PER TON 28.660 TON $0.20 1 TON 28.660 $5.73 $0.00 T 12/05/2022 8099255810 1038135662 1037371 Limerk Base Cert for FDOT Code 01 29.230 TON $10.00 1 TON 29.230 $292.30 $0.00 T 12/05/2022 8099255810 1038135662 1614495 ENVIRONMENTAL CHARGE PER TON 29.230 TON $0.20 1 TON 29.230 $5.85 $0.00 T 12/05/2022 8099255817 1038135670 1037371 Limerk Base Cert for FDOT Code 01 29.100 TON $10.00 1 TON 29.100 $291.00 $0.00 T 12/05/2022 8099255817 1038135670 1614495 ENVIRONMENTAL CHARGE PER TON 29.100 TON $0.20 1 TON 29.100 $5.82 $0.00 T 12/05/2022 8099255818 1038135671 1037371 Limerk Base Cert for FDOT Code 01 27.380 TON $10.00 1 TON 27.380 $273.80 $0.00 T 12/05/2022 8099255818 1038135671 1614495 ENVIRONMENTAL CHARGE PER TON 27.380 TON $0.20 1 TON 27.380 $5.48 $0.00 T 12/05/2022 8099256120 1038135673 1037371 Limerk Base Cert for FDOT Code 01 28.900 TON $10.00 1 TON 28.900 $289.00 $0.00 T 12/05/2022 8099256120 1038135673 1614495 ENVIRONMENTAL CHARGE PER TON 28.900 TON $0.20 1 TON 28.900 $5.78 $0.00 T 12/05/2022 8099256173 1038135727 1037371 Limerk Base Cert for FDOT Code 01 28.660 TON $10.00 1 TON 28.660 $286.60 $0.00 T 12/05/2022 8099256173 1038135727 1614495 ENVIRONMENTAL CHARGE PER TON 28.660 TON $0.20 1 TON 28.660 $5.73 $0.00 T 12/05/2022 8099256196 1038135750 1037371 Limerk Base Cert for FDOT Code 01 29.250 TON $10.00 1 TON 29.250 $292.50 $0.00 T 12/05/2022 8099256196 1038135750 1614495 ENVIRONMENTAL CHARGE PER TON 29.250 TON $0.20 1 TON 29.250 $5.85 $0.00 T PO Subtotal 0.00 Yards 288.46 Tons $2,942.29 Material $0.00 Freight $0.00 Other $205.95 Tax $3,148.24 Total . 0.00 Yards $0.00 Freight $0.00 Other288.46 Tons $205.95 Tax $3,148.24 Invoice Total The invoice incorporates herein by reference Buyer´s previously executed Credit Application, if any, Sellers Standard Terms and Conditions, Seller´s Quotation and Seller´s Order Confirmation (including limitations of warranties) as fully set forth on this Invoice ("Agreement"). Buyer agrees that, unless otherwise noted herein, all quantities and items were delivered as indicated and further expressly agrees to pay in accordance with this Agreement. Interest shall accrue on late payments. Page 36 of 151 Invoice No.: Customer: Phone: 407-856-8180 Ext. 223 403.48 MLT Date:12/05/22 No. Date Ticket No.Lds, Hrs, or Tons Rate Material Hauled From Hauled To Total $ 1 12/05/22 CST 1035 1038135608 29.50 14.50$ Limerock Cemex CH Orlando Yard 427.75$ 2 12/05/22 CST 6009 1038135609 28.52 14.50$ Limerock Cemex CH Orlando Yard 413.54$ 3 12/05/22 CST 1020 1038135618 29.26 14.50$ Limerock Cemex CH Orlando Yard 424.27$ 4 12/05/22 CT 3860 1038135649 28.66 14.50$ Limerock Cemex CH Orlando Yard 415.57$ 5 12/05/22 CST 1002 1038135662 29.23 14.50$ Limerock Cemex CH Orlando Yard 423.84$ 6 12/05/22 CST 1042 1038135670 29.10 14.50$ Limerock Cemex CH Orlando Yard 421.95$ 7 12/05/22 CST 1000 1038135671 27.38 14.50$ Limerock Cemex CH Orlando Yard 397.01$ 8 12/05/22 CST 1022 1038135673 28.90 14.50$ Limerock Cemex CH Orlando Yard 419.05$ 9 12/05/22 CT 3860 1038135727 28.66 14.50$ Limerock Cemex CH Orlando Yard 415.57$ 10 12/05/22 CST 1020 1038135750 29.25 14.50$ Limerock Cemex CH Orlando Yard 424.13$ 11 12/06/22 CST 1022 1038135987 28.98 14.50$ Limerock Cemex CH Orlando Yard 420.21$ 12 12/09/22 CT 3860 1038136661 28.68 14.50$ Limerock Cemex CH Orlando Yard 415.86$ 13 12/09/22 CT 3860 1038136748 28.70 14.50$ Limerock Cemex CH Orlando Yard 416.15$ 14 12/09/22 CT 3860 1038136838 28.66 14.50$ Limerock Cemex CH Orlando Yard 415.57$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Comments:5,850.46 Please send the check: Cruz Trucking Inc.-$ 7605 E. Broadway Ave.-$ Tampa, Florida 33619 5,850.46$ Cell (407) 948-2880 Trk No. Project Name:Orlando Yard 1000 Jetstream Dr. Orlando, Florida 32824 221604-02Cruz Trucking, Inc. 10531 Bronson Rd Clermont, FL 34711 Office (352) 241-4624 Fax (352) 241-4645 Total Amount Due: Other Charges: Fuel Surcharge 0%: Prime Construction Group Inc. Subtotal: Page 37 of 151 Page 38 of 151 Page 39 of 151 Page 40 of 151 Page 41 of 151 Page 42 of 151 Page 43 of 151 Page 44 of 151 Page 45 of 151 Page 46 of 151 Page 47 of 151 Page 48 of 151 Page 49 of 151 Page 50 of 151 Page 51 of 151 La Costa Sod LLC 532 N Bluford Ave Unit C Ocoee, FL 34761 +1 4072712991 BILL TO Prime Construction Group, Inc. 1000 Jetstream Drive Orlando, FL 32824 SHIP TO Ocoee FL INVOICE 356 DATE 10/17/2022 TERMS Net 30 DUE DATE 11/16/2022 DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT Bahla Sodding SY Bahia Sodding 400 2.85 1,140.00 Mobilization Mobilization Fee (per move-in) 1 200.00 200.00 WORK IS NOT GUARANTEED IF AREA IS NOT IRRIGATED.SUBTOTAL 1,340.00 CONTRACTOR IS RESPONSIBLE FOR ALL WATERING.TAX 0.00 TOTAL 1,340.00 TOTAL DUE $1 ,340.00 Page 52 of 151 La Costa Sod LLC 532 N Bluford Ave Unit C Ocoee, FL 34761 +1 4072712991 BILL TO SHIP TO Prime Construction Group, Inc. 1000 Jetstream Drive Orlando, FL 32824 OCOEE JOB INVOICE 416 DATE 11/11/2022 TERMS Net 30 DUE DATE 12/11/2022 DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT Bahia Sodding SY Bahia Sodding 650 2.85 1,852.50 Mobilization Mobilization Fee (per move-in)1 200.00 200.00 WORK IS NOT GUARANTEED IF AREA IS NOT IRRIGATED. CONTRACTOR IS RESPONSIBLE FOR ALL WATERING. SUBTOTAL 2,052.50 TAX 0.00 TOTAL 2,052.50 TOTAL DUE $2,052.50 Page 53 of 151 1 STOP SOD 4tLLJO & LANDSCAPING INC. 6401 HOFFNER AVE ORLANDO, FL 32822 DATE - NAME ADDRESS CITY, STATE, ZIP ORDER NO. SOLD BY CASH COD. CHARGE ON AC9T. / MDSE. RETD. PAID OUT QUAN. DESCRIPT9W— PRICE AMOUNT 1 — :' _______ ( 4 -- - 5 )'/ 6—" :- 11 RECEIVED BY TAX TOTAL -1J adams 35805 Page 54 of 151 Page 55 of 151 Page 56 of 151 Page 57 of 151 Page 58 of 151 Page 59 of 151 Page 60 of 151 Page 61 of 151 Page 62 of 151 Page 63 of 151 Page 64 of 151 GOD BLESS YOU AND THANK YOU FOR YOUR BUSINESS K&J WELLPOINTING INC. 1988 S. CHICKASAW TRAIL ORLANDO, FL 32825 407-929-3533 BILL TO Prime Construction Group Inc. Prime Construction Group ,Inc 1000 Jetstream Dr. Orlando,Fl.32824 INVOICE 5098 DATE 08/12/2022 TERMS Net 30 DUE DATE 09/11/2022 P.O. NUMBER 21797 DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT SERVICE INSTALLED 265' WELLPOINT SYSTEM AT CUMBERLAND AVE AS PER RANDY ON 8/10 1 1,950.00 1,950.00 SERVICE SAND USED FOR INSTALL 265 1.50 397.50 TOTAL DUE $2,347.50 Page 65 of 151 Page 1 of 2 ESTIMATE Prepared For Pri me Constructi on Group 1000 Jet Stream Dri ve Orlando, FL 32824 (407) 948-8027 LIPHAM CONSTRUCTION, LLC. P.O. Box 1156 Kathleen, FL 33849 Phone: (863) 934-2974 Email: rodneylipham@gmail .com Es ti mate #2094 Date 08/12/2022 PO #OCOEE STORMWATER POND & PARK Business / Tax #85-2680994 Descripti on Total CITY OF OCOEE - DOWNTOWN STORMWATER PON D & PARK $7,500.00 SUPPLEMENTARY DRAINAGE STRUCTURES 6" THICK SLAB WITH 6" THICK WALLS. 6' H 4' X 4' INSIDE WALLS CITY OF OCOEE - DOWNTOWN STORMWATER PON D & PARK $7,500.00 SUPPLEMENTARY DRAINAGE STRUCTURES 6" THICK SLAB WITH 6" THICK WALLS. 7' H 4' X 4' INSIDE WALLS CITY OF OCOEE - DOWNTOWN STORMWATER PON D & PARK $7,500.00 SUPPLEMENTARY DRAINAGE STRUCTURES 6" THICK SLAB WITH 6" THICK WALLS. 8' H 4' X 4' INSIDE WALLS CITY OF OCOEE - DOWNTOWN STORMWATER PON D & PARK $19,800.00 SUPPLEMENTARY DRAINAGE STRUCTURES 8" THICK SLAB WITH 8" THICK WALLS 14'-3" H 5' X 5' INSIDE WALLS Subtotal $42,300.00 Total $42,300.00 SUPPLEMENTARY DRAINAGE STRUCTURES 6" THICK SLAB WITH 6" THICK WALLS. 8' H 4' X 4' INSIDE WALLS CITY OF OCOEE - DOWNTOWN STORMWATER POND & PARK $19,800.00 SUPPLEMENTARY DRAINAGE STRUCTURES 8" THICK SLAB WITH 8" THICK WALLS 14'-3" H 5' X 5' INSIDE WALLS Subtotal $42,300.00 Page 66 of 151 IN VOICE Page No. I of I PRIME CONSTRUCTION GROUP 198 N CUMBERLAND AVE #106 OCOEE FL 34761 LI5 u ru ENGINEERED SOLUTIONS A OUIKRE7E® COMPANY 757993 CUSTOMER P.ONUMBER ORDER DATE REF NO. DATE DUE 217970009 07/14/22 08/18/22 DUNS NUMBER 429620 • II, lit • •• IiIi I.ili juiilliillilllli , •lllliliiillt il llliliuiuu ii.I 20220720083828-149 Prime Construction Group 1000 JETSTREAM DR ORLANDO FL 32824-7106 S H P T 0 B L L T 0 INVOICE NO. 25305339 CONTECH ENGINEERED SOLUTIONS, LLC P0 Box 936362 Atlanta, GA 31193-6362 ABA:121000248 (Wells Fargo) ACCOUNT:2052700385107 SWIFT:WFBIUSGS CHIPS 0407 REMIT INFO:achquikrete.com R S I T 0 B V E F I 7O-8O-8U INVOICE SHIP DATE SHIP VIA TERMS TAX ID 07/19/22 Prepaid & Add .5% 10, Net 30 ORDERED SHIPPED PIECES SO # ITEM NO. DESCRIPTION PRICE U/M AMOUNT 2 21119320 PPL2PC302000 A2 LINER COUPLED 30 20.00FT 159.360 FT 6,374.4' Pro#:SB#:09640407 BOL#9003263248 4500 21119320 691900 FREIGHT/DELIVERY 1.000 EA 4,500.0' FREIGHT/DELIVERY Prob:SB#:09640407 BOL#9003263248 THIS MATERIAL SHIPPED FROM PLANT NUMBER: 5205 SUB-TOTAL 10,874.40 382.46 11,256.86 TAX All sales are subject to applicable taxes - to be paid by buyer - unless the law provides a specific exemption from tax and buyer provides a valid tax exemption certificate. INVOICE TOTAL All sales are subject to Contech's terms and conditions of sale available at: http://www.conteches.com/cos (effective as of sales date). A late charge of 1.5% monthly or the maximum allowed by law, if less, will be imposed on all past due amounts. USD DOLLARS PLEASE PAY FROM THIS INVOICE This invoice is issued by Contoch Engineered Solutions LLC for itself and/or on behalf of one or more of its subsidiaries, including but not limited toKeystone Retaining Wall Systems LLC. If you have questions on this invoice please contact CUSTOMER SERVICE REP (5131645-7000 Page 67 of 151 Page 68 of 151 Orlando South 11128 Boggy Creek Rd Orlando FL 32824 United States Dispatch Inquiry 888-777-8307 Billing Inquiry 888-833-3777 Invoice Invoice Number: 508038 Date:9/14/2022 Prime Construction 1000 Jetstream Dr. Orlando FL 32824-7106 United States Project Name:Ocoee Downtown Stormwater Ordered By:Lii Ka-Ne Phone:(808)561-2610 Job Site Location: 121 N. Cumberland Ave. Ocoee FL 34761 United States Job#:34761 PO Number:21797 JS Contact:Lii Ka-Ne Job Site Phone:(808)561-2610 Office Phone:(407) 856-8180 Cust ID:N020009661 Sales Person:Zachary Bailey ZacharyBailey@ntsafety.com Delivery Instructions: Rental Contract Number:RC00521954 Contract Start Date:7/21/2022 Status Qty Item Description and Rate Days From Date Thru Date Rate Rate Ext On Rent 1.00 8x16 Steel Trench Box 4" Wall 28 8/18/2022 9/14/2022 $1,434.00 $1,434.00 $239.00/Day $478.00/Week $1,434.00/4 Week 1 DAYS MIN Serial:M16010059 On Rent 4.00 7.0 ft of 8 in Round Spreader 28 8/18/2022 9/14/2022 $0.00 $0.00 $0.00/Day $0.00/Week $0.00/4 Week 1 DAYS MIN On Rent 8.00 Spreader Pin 28 8/18/2022 9/14/2022 $0.00 $0.00 $0.00/Day $0.00/Week $0.00/4 Week 1 DAYS MIN TERMS: C.O.D. Accounts, Deposit Estimate Due Upon Delivery. Credit Accounts are due and payable net 30 days from invoice date. This invoice is subject to additional terms and conditions printed on the reverse side hereof, limiting the seller's warranty, obligations and excluding liability for consequential damages. Please Remit Payment to: National Trench Safety P.O.Box 51373 Los Angeles, CA 90051-5673 Rental: Waiver: Discount Sales Tax: Other: Total Amount: $1,434.00 $0.00 $0.00 $93.21 $0.00 ______________ $1,527.21 Page 69 of 151 Orlando South 11128 Boggy Creek Rd Orlando FL 32824 United States Dispatch Inquiry 888-777-8307 Billing Inquiry 888-833-3777 Invoice Invoice Number: 494003 Date:8/18/2022 Prime Construction 1000 Jetstream Dr. Orlando FL 32824-7106 United States Project Name:Ocoee Downtown Stormwater Ordered By:Lii Ka-Ne Phone:(808)561-2610 Job Site Location: 121 N. Cumberland Ave. Ocoee FL 34761 United States Job#:34761 PO Number:21797 JS Contact:Lii Ka-Ne Job Site Phone:(808)561-2610 Office Phone:(407) 856-8180 Cust ID:N020009661 Sales Person:Zachary Bailey ZacharyBailey@ntsafety.com Delivery Instructions: Rental Contract Number:RC00521954 Contract Start Date:7/21/2022 Status Qty Item Description and Rate Days From Date Thru Date Rate Rate Ext On Rent 1.00 8x16 Steel Trench Box 4" Wall 28 7/21/2022 8/17/2022 $1,434.00 $1,434.00 $239.00/Day $478.00/Week $1,434.00/4 Week 1 DAYS MIN Serial:M16010059 On Rent 4.00 7.0 ft of 8 in Round Spreader 28 7/21/2022 8/17/2022 $0.00 $0.00 $0.00/Day $0.00/Week $0.00/4 Week 1 DAYS MIN On Rent 8.00 Spreader Pin 28 7/21/2022 8/17/2022 $0.00 $0.00 $0.00/Day $0.00/Week $0.00/4 Week 1 DAYS MIN Qty Description Reg Rate Labor Subtotal 1.00 Delivery Line Hauler Truck $215.00 $215.00 Ant / Truck S569 / 7-21-2022 1.00 Transportation Surcharge $32.25 $32.25 Delivery Surcharge TERMS: C.O.D. Accounts, Deposit Estimate Due Upon Delivery. Credit Accounts are due and payable net 30 days from invoice date. This invoice is subject to additional terms and conditions printed on the reverse side hereof, limiting the seller's warranty, obligations and excluding liability for consequential damages. Please Remit Payment to: National Trench Safety P.O.Box 51373 Los Angeles, CA 90051-5673 Rental: Waiver: Discount Sales Tax: Other: Total Amount: $1,434.00 $0.00 $0.00 $93.21 $247.25 ______________ $1,774.46 Page 70 of 151 Invoice Amount: $766.80 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 3 537/2920 HOSE 6X20 RUBBER SUCTION - CAMLOCK 52.00 104.00 180.00 540.00 1 537/2930 HOSE 6X20 RUBBER SUCTION - QC 52.00 104.00 180.00 180.00 Rental Subtotal: 720.00 Agreement Subtotal: 720.00 Tax: 46.80 Total: 766.80 COMMENTS/NOTES: CONTACT: WILL HICKEY CELL#: 407-860-4024 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 7/26/22 01:00 PM Thru 8/23/22 01:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 200426119-011 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 08/07/22 11/16/21 01:00 PM 08/23/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Page 71 of 151 Invoice Amount: $766.80 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 3 537/2920 HOSE 6X20 RUBBER SUCTION - CAMLOCK 52.00 104.00 180.00 540.00 1 537/2930 HOSE 6X20 RUBBER SUCTION - QC 52.00 104.00 180.00 180.00 Rental Subtotal: 720.00 Agreement Subtotal: 720.00 Tax: 46.80 Total: 766.80 COMMENTS/NOTES: CONTACT: WILL HICKEY CELL#: 407-860-4024 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 7/26/22 01:00 PM Thru 8/23/22 01:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 200426119-011 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 08/07/22 11/16/21 01:00 PM 08/23/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Page 72 of 151 Invoice Amount: $771.06 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 4 537/2930 HOSE 6X20 RUBBER SUCTION - QC 52.00 104.00 181.00 724.00 Rental Subtotal: 724.00 Agreement Subtotal: 724.00 Tax: 47.06 Total: 771.06 COMMENTS/NOTES: CONTACT: LEE SMITH. CELL#: 808-561-2610 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 8/18/22 02:00 PM Thru 9/15/22 02:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 208746076-002 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 08/30/22 07/21/22 02:00 PM 09/15/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 73 of 151 Invoice Amount: $766.80 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 3 537/2920 HOSE 6X20 RUBBER SUCTION - CAMLOCK 52.00 104.00 180.00 540.00 1 537/2930 HOSE 6X20 RUBBER SUCTION - QC 52.00 104.00 180.00 180.00 Rental Subtotal: 720.00 Agreement Subtotal: 720.00 Tax: 46.80 Total: 766.80 COMMENTS/NOTES: CONTACT: WILL HICKEY CELL#: 407-860-4024 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 8/23/22 01:00 PM Thru 9/20/22 01:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 200426119-012 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 09/04/22 11/16/21 01:00 PM 09/20/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 74 of 151 Invoice Amount: $2,616.36 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 1 10316327 PUMP 6" DBA-SILENCER VAC ASSIST - DIESEL 384.00 767.00 2,294.00 2,294.00 Make: PIONEER Model: PP66S12L71V3600 Serial: PP23513 Meter out: 13915.60 Meter in: .00 SETUP: 6MCAM X 6MCAM 1 545/9425 FITTING WYE 6" 22.00 43.00 48.00 48.00 SETUP: 6MQC X 6MQC X 6FQC (STEM) 1 545/1111 MISC FITTINGS 11.00 22.00 33.00 33.00 1 - 6FCAM X 6FQC 1 545/1105 STRAINERS (ALL SIZES) 6.85 12.38 35.79 35.79 6FCAM SMALL HOLE STRAINER Rental Subtotal: 2,410.79 SALES/MISCELLANEOUS ITEMS: _______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt. 1 ENVIRONMENTAL SERVICE CHARGE [ENV/MCI] 45.880 EACH 45.88 Sales/Misc Subtotal: 45.88 Agreement Subtotal: 2,456.67 Tax: 159.69 Total: 2,616.36 COMMENTS/NOTES: CONTACT: LEE SMITH. CELL#: 808-561-2610 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 8/29/22 01:00 PM Thru 9/26/22 01:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 210138760-001 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 09/14/22 08/29/22 01:00 PM 09/26/22 00:00 121 S CUMBERLAND AVE 118 LEE LEE SMITH. ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 75 of 151 Invoice Amount: $2,348.97 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 1 10505331 PUMP 6" PISTON DBA-WELLPOINT - DIESEL 475.00 950.00 1,900.00 1,900.00 Make: BBA Model: PT150 Serial: 16-1618 Meter out: 27059.00 Meter in: .00 SETUP: 6â SLIP X 6MCAM Rental Subtotal: 1,900.00 SALES/MISCELLANEOUS ITEMS: _______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt. 1 ENVIRONMENTAL SERVICE CHARGE [ENV/MCI] 38.000 EACH 38.00 Sales/Misc Subtotal: 38.00 Agreement Subtotal: 1,938.00 Rental Protection: 285.00 Tax: 125.97 Total: 2,348.97 COMMENTS/NOTES: CONTACT: RANDY WEST CELL#: 813-576-9655 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 9/06/22 12:00 PM Thru 10/04/22 12:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 209408005-003 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 09/18/22 08/09/22 12:00 PM 10/04/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 76 of 151 Invoice Amount: $2,320.34 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 1 NPPD604110 PUMP 6" VAC ASSIST - DIESEL 358.00 713.00 2,136.00 2,136.00 Make: PIONEER Model: PP66S12L714045 Serial: PP23481 Meter out: 13281.50 Meter in: .00 SETUP: 6MCAM X 6MCAM Rental Subtotal: 2,136.00 SALES/MISCELLANEOUS ITEMS: _______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt. 1 ENVIRONMENTAL SERVICE CHARGE [ENV/MCI] 42.720 EACH 42.72 Sales/Misc Subtotal: 42.72 Agreement Subtotal: 2,178.72 Tax: 141.62 Total: 2,320.34 COMMENTS/NOTES: CONTACT: LEE SMITH. CELL#: 808-561-2610 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 7/08/22 09:30 AM Thru 8/05/22 09:30 AM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 207264887-002 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 07/24/22 06/10/22 09:30 AM 08/05/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 77 of 151 Invoice Amount: $2,320.34 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 1 NPPD604110 PUMP 6" VAC ASSIST - DIESEL 358.00 713.00 2,136.00 2,136.00 Make: PIONEER Model: PP66S12L714045 Serial: PP23481 Meter out: 13281.50 Meter in: .00 SETUP: 6MCAM X 6MCAM Rental Subtotal: 2,136.00 SALES/MISCELLANEOUS ITEMS: _______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt. 1 ENVIRONMENTAL SERVICE CHARGE [ENV/MCI] 42.720 EACH 42.72 Sales/Misc Subtotal: 42.72 Agreement Subtotal: 2,178.72 Tax: 141.62 Total: 2,320.34 COMMENTS/NOTES: CONTACT: LEE SMITH. CELL#: 808-561-2610 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 9/02/22 09:30 AM Thru 9/30/22 09:30 AM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 207264887-004 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 09/18/22 06/10/22 09:30 AM 09/30/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 78 of 151 Invoice Amount: $2,201.13 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 1 545/1335 12" ROAD CROSSING DOUBLE WIDE 498.42 995.45 2,066.79 2,066.79 SETUP: 6FCAM X 6MCAM PLEASE PUT ANY UNBOLTED FITTINGS ON THR SIDE Rental Subtotal: 2,066.79 Agreement Subtotal: 2,066.79 Tax: 134.34 Total: 2,201.13 COMMENTS/NOTES: CONTACT: LEE SMITH. CELL#: 808-561-2610 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 8/12/22 08:00 AM Thru 9/09/22 08:00 AM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 209545822-001 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 08/27/22 08/12/22 08:00 AM 09/09/22 00:00 121 S CUMBERLAND AVE 118 21971 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 79 of 151 123411039-0007 PO BOX 409211 ATLANTA, GA 30384-9211 4097 8/31/22 1 N/R CUMBERLAND AVE OCOEE 180 N CUMBERLAND AVE OCOEE, FL 34761 2204 C#: 407-856-8180 J#: 813-576-9655 180 N. CUMBERLAND AVE, OCOEE CUMBERLAND AVE OCOEE 123411039 WINTER GARDEN PC050 271 MAGUIRE RD BLDG A OCOEE, FL 34761 2925 407-654-9516 0050 1014.40 65.94 1080.34 PRIME CONSTRUCTION GROUP INC 1000 JETSTREAM DR ORLANDO, FL 32824-7106 . QTY EQUIPMENT # Min Day Week 4 Week Amount . 1.00 TRENCH ROLLER W/ REMOTE 365.00 365.00 995.00 2295.00 995.00 10082588 Make: WACKER Model: RTLX-SC3 Ser #: 24466708 HR OUT: 330.000 HR IN: 385.000 TOTAL: 55.000 Billed from 8/22/22 thru 8/29/22 #Wagner has details Rental Sub-total: 995.00 SALES ITEMS: Qty Item number Unit Price 1 ENVIRONMENTAL EA 19.400 19.40 ENVIRONMENTAL/HAZMAT FEE 2133XXX0000 1 RF EA N/C RETURNED FULL FINAL BILL: 8/22/22 12:00 PM THRU 8/29/22 08:00 AM. . 1014.40. RENTAL RETURN NET 30 MEGHAN JONES meghan.jones@sunbeltrentals.com WEST, RANDY Page 80 of 151 123411039-0006 PO BOX 409211 ATLANTA, GA 30384-9211 4097 8/09/22 1 N/R CUMBERLAND AVE OCOEE 180 N CUMBERLAND AVE OCOEE, FL 34761 2204 C#: 407-856-8180 J#: 813-576-9655 180 N. CUMBERLAND AVE, OCOEE CUMBERLAND AVE OCOEE 123411039 WINTER GARDEN PC050 271 MAGUIRE RD BLDG A OCOEE, FL 34761 2925 407-654-9516 0050 2339.75 152.09 2491.84 PRIME CONSTRUCTION GROUP INC 1000 JETSTREAM DR ORLANDO, FL 32824-7106 . QTY EQUIPMENT # Min Day Week 4 Week Amount . 1.00 TRENCH ROLLER W/ REMOTE 365.00 365.00 995.00 2295.00 2295.00 10082588 Make: WACKER Model: RTLX-SC3 Ser #: 24466708 HR OUT: 330.000 HR IN: TOTAL: 330.000 #Wagner has details Rental Sub-total: 2295.00 SALES ITEMS: Qty Item number Unit Price 1 ENVIRONMENTAL EA 44.750 44.75 ENVIRONMENTAL/HAZMAT FEE 2133XXX0000 BILLED FOR FOUR WEEKS 7/25/22 THRU 8/21/22. . 2339.75. 4 WEEK BILL NET 30 MEGHAN JONES meghan.jones@sunbeltrentals.com WEST, RANDY Page 81 of 151 Invoice Amount: $2,444.18 Terms: Due Upon Receipt Payment options: Contact our credit office 212-333-6600 Ext. 84902 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 30384-0711 4 WEEK BILLING INVOICE FLUID SOLUTIONS Page: 1 RENTAL ITEMS: _____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Amount 1 11106389 PUMP 12" TMSN ROTARY WELLPOINT - DIESEL 290.00 775.00 2,250.00 2,250.00 Make: THOMPSON Model: 12R-DDS-C3.6-X Serial: V-1508 Meter out: 5271.00 Meter in: .00 SETUP: SOCK TEE X 8 INCH MALE CAMLOCK Rental Subtotal: 2,250.00 SALES/MISCELLANEOUS ITEMS: _______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt. 1 ENVIRONMENTAL SERVICE CHARGE [ENV/MCI] 45.000 EACH 45.00 Sales/Misc Subtotal: 45.00 Agreement Subtotal: 2,295.00 Tax: 149.18 Total: 2,444.18 COMMENTS/NOTES: CONTACT: GILBERT Vincent CELL#: 717-650-0024 DLV/PKU LOC SELECTED BY MAP PIN OPTION CALL RANDY WEST WHEN ONSITE. Billing period: 28 Days From 6/29/22 02:00 PM Thru 7/27/22 02:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING OCOEE STORM WATER BASIN 121 S CUMBERLAND AVE OCOEE FL 34761 Office: 407-856-8180 Cell: 813-576-9655 PRIME CONSTRUCTION GROUP-ORLAN 1000 JETSTREAM DR ORLANDO FL 32824-7106 BRANCH 68K 706 WEST LANDSTREET ROAD ORLANDO FL 32824 407-812-4007 407-812-4030 FAX # 199445800-011 Job Site Customer # : Invoice Date : Date Out : Billed Through : UR Job Loc : UR Job # : Customer Job ID: P.O. # : Ordered By : Reserved By : Salesperson : 654636 07/16/22 10/20/21 02:00 PM 07/27/22 00:00 121 S CUMBERLAND AVE 118 21797 RANDY WEST ZACHARY STILP ZACHARY STILP Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page 82 of 151 2 1181891 SO #: 20124231 SB#: 09610839 #711 LUBRICANT 8LB 11.000 EA 22.00 224 1211946 SO #: 20124231 SB#: 09610839 18x8' CL3 PF RCP 20.000 FT 4,480.00 28 1212197 SO #: 20124231 SB#: 09610839 18" GASKET PF ISO 0.000 EA 0.00 104 1211973 SO #: 20124238 SB#: 09610839 30x8' CL3 PF RCP 45.600 FT 4,742.40 13 1212042 SO #: 20124238 SB#: 09610839 30" GASKET PF ISO 0.000 EA 0.00 8 1184266 SO #: 20124243 SB#: 09610839 48x8' CL3 PF RCP 110.880 FT 887.04 88 1211973 SO #: 20124243 SB#: 09610839 30x8' CL3 PF RCP 45.600 FT 4,012.80 11 1212042 SO #: 20124243 SB#: 09610839 30" GASKET PF ISO 0.000 EA 0.00 1 1212044 SO #: 20124243 SB#: 09610839 48" GASKET PF ISO 0.000 EA 0.00 14,144.24 This invoice incorporates herein by reference Buyer's previously executed Creadit Application, If any, Seller's Standerd Terms and Conditions, this Seller's Quotation and Sellers's Order Confirmation (including limitations of warranties) as fully set forth on this invoice (as amended, modified, supplemented, restarted and/or supplemented, restarted and/or replaced by mutual written Agreement). Buyer agrees that, unless otherwise noted herein all quantities and items were delivered as indicated and further expressly agrees to pay In accordance with this Agreement. Interest shall accrue on late payments. SUB TOTAL INVOICE TOTAL 14,992.89 848.65 INVOICE DATE IS DATE SHIPPED. PAST DUE ACCOUNTS ARE SUBJECT TO 18% A.P.R. CHARGE USD DOLLARS PLEASE PAY FROM THIS INVOICE THIS MATERIAL SHIPPED FROM PLANT NUMBER :5560 Rinker Material , , TAX INVOICE NO. 24214606 INVOICE Rinker Materials PO Box 936217 Atlanta, GA 31193-6217 PAGE NO. 1 495858 PRIME CONSTRUCTION GROUP INC 1000 JETSTREAM DR ORLANDO FL 32824 696555 OCOEE DOWNTOWN STORM POND & PARK FRANKLIN ST AT N CUMBERLAND AVE OCOEE FL 34761 CUSTOMER P.O. NUMBER ORDER DATE REF. NO DATE DUE DUNS NUMBER 217970004 01/10/2022 02/16/2022 INVOICE SHIPDATE SHIP VIA TERMS TAX ID 01/12/2022 Prepaid 1% 15th Prox,Net 16th QUANTITY ITEM NO.DESCRIPTION PRICE U/M AMOUNT TAX: $ 54.22 Total: $ 940.26 Page 83 of 151 1 0 0 W e s t P l a n t S t . W i n t e r G a r d e n , F l . 3 4 7 8 7 Andrew Wissmann Phone: (402) 641-5294 Date 6-23-22 OCOEE STORMWATER Change order for: • Credit for 11 pillings and Installation $3,388.00 • Charge for 11 base brackets and installation $5,662.00 Total Change Order $2,274.00 Page 84 of 151 990 Miller Drive Altamonte Springs, FL 32701 407-260-9000 CHANGE ORDER REQUEST Date: July 8, 2022 Request No: 1 Subcontract No: Project:Ocoee Downtown Master Storm 21797007 Ocoee, FL To: Prime Construction 1000 Jetstream Dr. Orlando, FL 32824 From: Central Florida Underground, Inc. 990 Miller Drive Altamonte Springs, FL 32701 1 2 3 4 5 Description of Change Order: Quantity Unit Price Amount 1 44 LF $73.50 $3,234.00 Total $3,234.00 Upsize casing from 30" to 36" Per quote dated 5/25/22 Description 27,676.00$ 27,676.00$ 30,910.00$ 3,234.00$ Original Contract Amount: Previous Change Order(s) Amount: Current Contract Amount: This Change Order: Adjusted Contract Amount: Page 85 of 151