Item #05 Approval of Change Order No. 2 for Central Park Phase II Improvements (enter of GOOd Lill" ~~ AGENDA ITEM COVER SHEET Meeting Date: March 18, 2008 Item # 5 Contact Name: Contact Number: David Wheeler 407 -905-3100, ext. 1504 Reviewed By: Department Director: City Manager: /rL;(;;: # ~--- Subject: Change Order NO.2 with Tony's Construction Co. for Central Park Phase II Improvements. Background Summary: The construction underway at Central Park will significantly improve the spectator and player experience and reduce maintenance costs through improved stormwater management. Spectator safety is being enhanced by new retaining walls, level bleacher areas, new aluminum bleacher structures, ADA- compliant access paths, and new guardrails and handrails. The player experience is being improved through new dugouts, backstops, facility interconnections via new sidewalks, and field fencing. In keeping with these objectives, six small additions to the work are proposed to complete Phase II. That additional work includes: 1. Installing a curb along the downhill side of a new concrete driveway to control erosion. 2. Installing a concrete ramp from a new elevated sidewalk to the football field. 3. Relocating the upper flight of a long stairway away from a perpendicular sidewalk so as to improve pedestrian safety and to construct a small retaining wall to control erosion adjacent to the stairway. 4. Replacing a narrow sidewalk with one conforming to the City's 6-foot width standard for two-way travel within parks. 5. Removing a large oak tree that is too close to a retaining wall and spectator area. 6. Raising a yard drain within a pedestrian-accessible grass area so as to remove a fall hazard. Issue: The Engineering Department has proposed changes to the Central Park Phase II improvement project and requests that the City Commission approve Change Order No. 2 for this project with Tony's Construction Co. Recommendations The Engineering Department recommends that the City Commission approve Change Order No. 2 for the additional work and increase the Central Park Phase II construction contract by $8,000.00, with no adjustment to contract time, and authorize the Mayor and City Clerk to execute the change order. To fund the change, staff recommends that the City Commission approve the allocation of $8,000 from capital budget funds previously authorized for this project. 1 Attachments: Change Order NO.2 between the City of Ocoee and Tony's Construction Co. for the Central Park Phase II improvement project Financial Impact: The funding for this $8,000.00 change order will be financed by the existing budget for the construction project. Type of Item: (please mark with an "x') Public Hearing _ Ordinance First Reading Ordinance Second Reading Resolution Commission Approval Discussion & Direction For Clerk's Deat Use: _ Consent Agenda _ Public Hearing _ Regular Agenda _ Original Document/Contract Attached for Execution by City Clerk _ Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) N/A N/A N/A 2 SECTION 00842 center of Good L . <\.~e l~i~ CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 CITY OF OCOEE CHANGE ORDER NO.2 CENTRAL PARK PHASE II IMPROVEMENTS DATE: March 7,2008 CONTRACTOR: Tony's Construction Co., Inc. AGREEMENT DATE: January 15,2008 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $177.000.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $225.450.00 Net Increase (Decrease) Resulting from this CHANGE ORDER $8.000.00 The current CONTRACT PRICE including this CHANGE ORDER $233.450.00 Original CONTRACT COMPLETION DATE: March 15. 2008 Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS March 15. 2008 Net Increase Resulting from this CHANGE ORDER 0 days Current CONTRACT COMPLETION DATE including this CHANGE ORDER March 15. 2008 Central Park Phase II Improvements - Change Order #2 00842-1 3/7/2008 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES At Football Field: 1. Install Type-F curb along northern edge of driveway leading from the Field House to the Football Field. The curb is to turn to the north and terminate at the sidewalk leading from the T-Ball Field to the Football Field. 2. Remove existing sidewalk and install new concrete ramp from the Visitor side sidewalk to the gate onto the Football Field in the southeast comer ofthe field. 3. Relocate the upper stair section on the southeast stairway and construct a 10- foot retaining wall, as shown on the attached plans. Install a continuous handrail on both sides for the entire length of the stairway, including the intermediate landing. 4. Replace the 4-foot-wide sidewalk near the Visitor bleachers with a 6-0foot sidewalk joining the sidewalk constructed under Change Order 1. 5. Remove large oak tree between the Field House and Minor Field. 6. Raise the yard drain in the grass area between the South Parking Lot and Minor Field. III. JUSTIFICATION The construction of a new concrete driveway from the Field House to the Football Field required a sloped surface to handle water runoff properly. A curb on the lower side is required to channel runoff water away from the grass areas, where erosion could occur. The new, raised sidewalk along the east (Visitor) side of the Football Field resulted in a step-down from the sidewalk to the lower sidewalk leading to the Football Field in the southeast comer. Removing this short sidewalk, which is in poor condition, and constructing a ramp will correct the problem. The upper section of the southeast stairway is immediately adjacent to the south sidewalk and poses a hazard to pedestrians. Its relocation further north by imposing an upper landing will correct this problem. The existing 4-foot- wide sidewalk presented a choke point for pedestrian traffic traveling from the parking lot to the Visitor bleachers. Changing this short section to the same width (6 feet) as the adjoining sidewalk installed under Change Order 1 will remove this deficiency. The root system of the large oak tree was too damaged by recent construction activities and needs to be removed before it becomes a hazard. The yard drain is now two feet below the surface grade as a result of installing a higher retention wall and needs to be raised to avoid a fall hazard in an area of pedestrian access. IV. NARRATIVE OF NEGOTIATIONS Costs are based on a Contractor price proposal that were reviewed by the Engineering Department and modified following subsequent negotiations. Central Park Phase II Improvements - Change Order #2 00842-2 3/7/2008 V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease (Decrease) Price Quantity I Construct driveway curb, I Lump Sum $5,000.00 $5,000.00 replace field access sidewalk with ramp, relocate stairs, and widen sidewalk 2 Remove large oak tree 1 Lump Sum $1,500.00 $1,500.00 near Field House 3 Raise drop inlet in grass I Lump Sum $1,500.00 $1,500.00 area at Minor Field Total Net Increase (Decrease) Change Order No. 2 $8,000.00 Central Park Phase II Improvements - Change Order #2 00842-3 3/7/2008 Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: ~JlY'.t GJ~/J'7. lIVe . 1?~[)Jt1?1+7N LcJ 701 A14~. CITY OF OCOEE, FLORIDA By ~C iii - Signature By: f~L-L Signature Date: ~4/'. ~ 2. rlfI Y Cl'fy E". 9''1 ~"f\ Date: OJ -(()?-oR'" p~€.s '0 FN, Title: Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: Date Attest: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,20_. APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON ,20_ UNDER AGENDA ITEM NO. By: City Attorney END OF SECTION Central Park Phase II Improvements - Change Order #2 00842-4 3/7/2008 Existing 4-foot concrete sidewalk SECTION A 3/10/2008 4'-0" 6'-0" 9 <0 Retaining wall sufficient to hold back soil; may be constructed of poured concrete, filled concrete block, or stacked block material ./ ~cf, PLAN VIEW (NTS) Note: Height of wall shown is typical, actual height to be determined in field Fill Top Course of Block Wall with Concrete, Typical Install 1 #5 Rebar Every 3'-0", Typical Finish grade 16" x 8" Continuous Concrete Footing Reinforced with 2 #5 Rebars and Keyway for Soil Retention Wall, Typical SECTION B 4'-0" '--1 Existing sta~~"~ L.._._.~ section to be -------F"-, L removed/buried " 7 Risers @ 6" 6 Treads @ 12" 6'-0" Reinforce new stairs with rebar Extend new stairs over existing landing Tie new stairs to existing slab with rebar 2 TONY'S CONSTRUCTION CO.INC. 20 E. Bay Street, Winter Garden, FI34787 I Ph# 407-656-7121 : Cell# 407-466-5756: FaX# 407-656-0578 I Minority Certified # 960009 IEstimating Department Attention: J. Hayes Company: City Of Ocoee Address: Date 2/29/2008 Proposal I D : Ph# Project: Central Park Phase II Item No. Description Quantity Unit Unit Cost Amount Mr. Hayes Quote for extra work 1 construct sidewalk at football field 2 construct curb at driveway near restroom 3 make changes on steps between soccer field and t-ball field, and build wing wall as instructed Lump Sum price =$5,000.00 $5,000.00 TOTAL $5,000.00 Note: Price Includes I 1. Labor 2. Material I Note: INot Included In Price I For further information call Ramish at 407-466-5759 Thank you Ramish Parmanan TONY'S CONSTRUCTION CO.INC. 20 E. Bay Street, Winter Garden, FI 34787 I Ph# 407-656-7121 : Cell# 407-466-5756: FaX# 407-656-0578 I Minority Certified # 960009 I Estimating Department Attention: AI Butler Company: City Of Ocoee Address: 150 North Lakeshore Drive Ocoee, FI. 34761 Date 3/7/2008 Proposal I D : Ph# Project: Central Park Phase II Item No. Description Quantity Unit Unit Cost Amount as requested price quote 1 cut and remove large oak tree near Field 1 LS $1,500.00 House 2 raise drop inlet in grass area at Minor 1 LS $1,500.00 Field TOTAL $3,000.00 Note: Price Includes I 1. Labor 2. Material 3.Equipment I Note: INot Included In Price I For further information call Ramish at 407-466-5759 Thank you Ramish Parman an