Loading...
Item #06 Approval of Change Order No. 3 for the Pioneer Key Regional Stormwater Pond Meeting Date: November 4, 2008 Item # (0 Contact Name: Contact Number: David Wheeler 407-905-3100, ext. 1504 Reviewed By: Department Director: City Manager: Subject: Change Order No. 3 for the Pioneer Key Regional Stormwater Pond construction project to accommodate final construction modifications involving the inflow channel, driveway apron, and sidewalk. Background Summary: During the course of construction, various design elements were judged by the City to benefit from modification in location and specification. The most significant owner-directed change was in the design and construction of the weir structure that diverts water from the Northwest Ditch into the new stormwater pond was originally a fixed earthen dam. A concrete weir structure with a removable gate was designed as an alternative that would allow diversion of the water around the pond for maintenance. Other changes made under owner direction were to build a reinforced concrete driveway apron across the shallow force main on this side of Palm Drive, relocate the sidewalk to a location adjacent to the parking area in order to facilitate access, and install additional riprap along the inflow channel. Deletions made were the result of reducing the amount of storm drain piping required and elimination of the Orange County building permit fee by annexing the property into the City. Construction of the regional stormwater pond is funded by a State grant. Issue: The Engineering Department has proposed a final change order that accommodates additions and deletions to the final stages of the project. The change order includes an increase of $21,010.37 in Contract Price and an increase of 55 days in Contract Time. Recommendations The Engineering Department recommends that the City Commission approve the proposed change order and authorize the Mayor and City Clerk to execute the required legal documents. To fund the change, staff recommends that the City Commission approve the allocation of $21,010.37 from remaining funds budgeted for this project. Attachments: Proposed Change Order NO.3. Financial Impact: The funding for this action will be financed by the existing allocation for the project in Account No. 312- 538-00-6302, which represents receipts from a State stormwater grant. 1 Type of Item: (please mark with an "x") _ Public Hearing _ Ordinance First Reading _ Ordinance Second Reading Resolution _ Commission Approval Discussion & Direction For Clerk's DeDt Use: _ Consent Agenda Public Hearing _ Regular Agenda _ Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) ~,(J #- N/A N/A N/A 2 SECTION 00842 center of GOod L . <\.~e l~~ CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 CITY OF OCOEE CHANGE ORDER NO.3 PIONEER KEY REGIONAL STORMW ATER POND PROJECT DATE: October 16, 2008 CONTRACTOR: Southern Site Works AGREEMENT DATE: July 17, 2007 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $794.545.65 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $828.505.15 Net Increase (Decrease) Resulting from this CHANGE ORDER $21.010.37 The current CONTRACT PRICE including this CHANGE ORDER $849.515.52 Original CONTRACT COMPLETION DATE: April 25. 2008 Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS June 24. 2008 Net Increase Resulting from this CHANGE ORDER 55 days Current CONTRACT COMPLETION DATE including this CHANGE ORDER September 17. 2008 Pioneer Key Regional Stormwater Pond Change Order #3 00842-1 030105 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Provide additional Contract Price and Time for additions, deletions, and modifications to the work, as defined on the original construction plans. III. JUSTIFICATION Site conditions unknown at the start of construction required adjustments to the plans to accommodate the shallow depth to a sanitary sewer force main under the new driveway, which was accomplished by using a structural concrete driveway apron rather than the planned asphalt pavement; construction of a removable weir structure rather than the originally proposed fixed structure; and additional riprap for slope protection around the inflow channel. A change from 4-inch thickness to 6-inch thickness and from unreinforced to wire-reinforced was made to the sidewalk where it is adjacent to the parking lot so as to reduce the risk of future damage. Deletions to the project's cost were realized by eliminating the need for a construction permit and reduction in the length of a pipe culvert. The period of construction was extended to permit these changes to be implemented and to delay plant installation until electric power service was available for irrigation. IV. NARRATIVE OF NEGOTIATIONS Change order is based on mutual agreement by the parties. V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease (Decrease) Price Quantity 1 Extend 55 Day $0.00 $0.00 construction time 2 Change from 1 Lump Sum $1,738.62 $1,738.62 asphalt to concrete driveway apron 3 Replace fixed weir 1 Lump Sum $9,750.00 $9,750.00 with removable weir 4 Upgrade sidewalk 585 Square Foot $5.55 $3,246.75 to 6-inch wire- reinforced slab next to parking lot 5 Install additional 200 Linear Foot $7.52 $1,504.00 erosion control Pioneer Key Regional Stormwater Pond Change Order #3 00842-2 030105 Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease (Decrease) Price Quantity 6 Install additional 80 Ton $125.00 $10,000.00 riprap in channel 7 Building permit I Lump Sum $4,770.00 ($4,770.00) 8 36-inch Rep 6 Linear Foot $76.50 ($459.00) culvert Total Net Increase (Decrease) Change Order No. 3 $21,010.37 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the City of Ocoee Commission. The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. CITY OF OCOEE. FLORI~ BY:~~ Signature Date: Oct IS, Z,D& J( - By: ACCEPTED BY: s:.HBW S;;.; L. ;;;. #~ . . gnature It) lIt /08 , w 4/Jr/A'"lt"?uk RECOMMENDED BY: Date: Title: LJ-fy t;""j'~ i."" APPROVED BY: CITY OF OCOEE. FLORIDA Owner Title: By: Date Attest: Pioneer Key Regional Stormwater Pond Change Order #3 00842-3 030105 FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,2008. APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON , 2008 UNDER AGENDA ITEM NO. By: City Attorney END OF SECTION Pioneer Key Regional Stormwater Pond Change Order #3 00842-4 030105