Loading...
Item #07 Approval to Award Silver Star Landscaping Improvement Project to Valley Crest ~~e center of GOOd Li~~ ~~ AGENDA ITEM COVER SHEET Meeting Date: November 18, 2008 Item # 7 Contact Name: Contact Number: Stephen C. Krug 6002 Reviewed By: Department Director: City Manager: Subject: Award Silver Star Landscaping Improvement Project to Valley Crest. Background Summary: The City entered into a Joint Participation Agreement (JPA) with the FOOT on September ih, 2004, for the Landscaping Improvements on State Road 438 (Silver Star) from Olympus Drive to Wood haven Court. In December, 2005 the City awarded the landscape design to Herbert-Halback, Inc. (HHI). HHI provided a design that included irrigation, trees, under story shrubbery and ground covering of various varieties. The submittal process with the FOOT was completed with final approval received in January of this year. During the submittal process with the FOOT, the City reoriented its landscaping focus to concentrate on low maintenance plantings that have a history of thriving in a roadway median environment with minimal watering. Throughout the summer months, City staff met with representatives from Valley Crest, the City's continuing service landscape maintenance provider, to determine which aspects of the design will meet the City's landscaping focus. The City resubmitted to the FOOT a project scope that included irrigation, trees and ground covering for approval, eliminating the varied understory shrubbery that would be difficult to maintain in a presentable manner after installation. The FOOT concurred with the City's proposal on November 5th, 2008 and was supportive of the City's selection of Valley Crest as they are prequalified as a FOOT contractor. Issue: Authorization to proceed with the award of the Silver Star Road Landscaping Improvement Project to Valley Crest, the City's continuing services landscape maintenance contractor, for $157,008.00. This will be in accordance with the FOOT Joint Participation Agreement for Landscaping Improvements on State Road 438 Between Olympus Drive and Wood haven Court, FM#239289-2-58-01; Contract Number ANR90. Recommendations Staff recommends that the City Commission approve the award of the Silver Star Road Landscaping Improvement Project to Valley Crest for $157,008.00. Attachments: Valley Crest Proposal Financial Impact: The cost of the landscape improvement project is adequately funded through the FOOT JPA. Type of Item: (please mark with an "x'J Public Hearing For Clerk's Deot Use: _ Ordinance First Reading _ Ordinance Second Reading Resolution ~ Commission Approval Discussion & Direction Consent Agenda Public Hearing Regular Agenda _ Original Document/Contract Attached for Execution by City Clerk _ Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) ~AI:1- N/A N/A N/A 2 {, Va II eyCrest Landscape Maintenance September 23, 2008 Steve Krug Director of Public Works City ofOcoee 301 Maquire Rd. Ocoee, Florida 34761 4777 Old Winter Garden Road Orlando, Florida 32811 tel: 407,292,9600 fax: 407 291.4966 www.valleycrest.com RE: Sil'l1er Star Rd. Center Medians Landscape Enhancement Proposal Dear Steve, T hank you, for the opportunihj to present you with a landscape enhancement proposal for your investment. We hereby propose to fumish in the utmost professional 11lanner, allnecessanj labor and materials to perform the following work, as per ValleyCrest Landscape Maintenance scope of work & specifications noted in the following pages. ValleyCrest Landscape Maintenance main objective is to exceed our customers expectations and greatly enhance the value of your investment. *All Items noted throughout this proposal includes the following scope of work; · Removal of sod for each newly installed tree. . Installation of materials (i.e. plants, 11lulch, etc.), as noted in the following pages. . A post planting fertilizer application for all new plantings. *IRRIGATION SYSTEM: 1) Jack & Boring - To bring water into the islands (3) 6 Inch Crossings & (1) 2 Inch Crossings $ 6,912.00 2) Install allnecessanj piping, valve s and bubblers to (138) trees and irrigation to (2) groundc011er planting beds. Also included is providing mainline stub outs in each median, for future irrigation for sodded areas. 35,768.00 3) Fumish & install (6) water meters per plan 6,955.00 *IRRIGATION SYSTEM TOTAL : 49,635.00 *Add Alternate: Install irrigation to all sodded areas> $20,400.00 Continued on Page 2 {, Page 2 Silver Star Rd. Enhancement Proposal (Continued) 9-23-08 *TREE INSTALLATION: QTY. PLANT NAME 13 Crepe Myrtle Multi Trunk 23 Crepe Myrtle Natchez STD. 50 Live Oak "High Rise" 8 Ligustrum lucidum 44 Sabal Palm 300 Perennial Peanut 15 Hardwood Mulch $ 96,933.00 SIZE/TYPE 45 Gallon 65 Gallon 100 Gallon411 Caliper 65 Gallon 14' Clear Trunk 1 Gallon Cubic Yards * MOT Traffic Lane Closures (12) Lane Closures: $ 10,440.00 *TOTAL CONTRACT AMOUNT: $157,008.00 ~~ Tim arris (Account Manager - Landscape En]ul11cement) Valley Crest - Landscape Maintenance, Orlando II This proposal properly signed by your agent has been accepted as authorization to perform the work. An invoice will be forwarded to your office for payment when the work is completed. All work will be performed in accordance with the II General Terms & Conditions" which are printed on, attached and or incorporated herein by reference. II Should this proposal meet your approval, please sign and date below. Authorized Client Representative Signature Approval Date 4777 Old Winter Garden Rd. Orlando, Florida 32811407 292-9600 407291-4966 (Fax) {r ValleyCrest Landscape Maintenance 4777 Old Winter Garden Road Orlando, Florida 32811 tel: 407,292,9600 fax: 407 291.4966 www.valleycrcst.com fuJecial Conditions and or Exclusions City of Ocoee - Silver Star Rd. Streetscape Project Landscape Enhancement The following items noted below are provided by Valleycrest Landscape Maintenance, for the sole purpose of providing our customer with concise and definitive guidelines for the proposed scope of work described in the aforementioned proposal for City of Ocoee - Silver Star Rd. landscape enhancement project. . Valley crest Landscape Maintenance is not responsible for the civil engineering of the site. . The attached proposal does not include any importation or exportation of fill soil. New plantings will be installed @ existing grade, in existing sod. . Existing Bahia sod will remain. . City of Ocoee allowing ValleyCrest Landscape Maintenance to dump debris @ the Public Works Division facility. . The proposal includes (12) MOT lane closures on Silver Star Rd.- 2 Lanes each occurrence. Should additional lane closures be required to complete the scope of work as defined in the proposal, additional charges will be applied. . l'This proposal properly signed by your agent has been accepted as authorization to perform the work. An invoice will be forwarded to your office for payment when the work is completed. All work will be performed in accordance with the IIGeneral Terms & Conditionsll which are printed on, attached and or incorporated herein by reference. II I, hereby acknowledge and accept the above special conditions and or exclusions noted above. Date Authorized Signature