Item #08 Award of Windstone Retrofit and Forest Trail Extension Reclaimed Water (j.C~.~"'.~.O.f~. .Li't: QCO,EE AGENDA ITEM COVER SHEET Meeting Date: November 18, 2008 Item # 8 Contact Name: Contact Number: David Wheeler 407-905-3100, ext. 1504 Reviewed By: Department Director: City Manager: p.-)j t. ;,;;1 . Qtk -- Subject: Award of Windstone Retrofit and Forest Trail Extension Reclaimed Water System design services contract to the firm of Inwood Consulting Engineers, Inc., in the amount of $34,605.00. Background Summary: The FY 2009 budget includes funds for the retrofit construction of a reclaimed water system within the Windstone Subdivision with an extension across Clarcona-Ocoee Road to serve the Forest Trail Subdivision, which already has a reclaimed water distribution system. The location of the project is described on the attached map. A City of Ocoee reclaimed water main presently extends to near the western end of the Windstone Subdivision on Grapevine Crest. The southern end of the Canyon Trail Ln. main will be designed to extend in the future to serve the Sawmill Subdivision, while the northern end will cross Clarcona-Ocoee Rd. and connect to the reclaimed water distribution system already in place in the Forest Trail Subdivision. (The reclaimed system is presently connected to an Orange County potable water main.) The project area will be impacted by widening of the Clarcona-Ocoee Rd. by Orange County in 2009. The firm of Inwood Consulting Engineers, Inc., has been retained by Orange County to design the road project. The City of Ocoee plans to coordinate the reclaimed water system construction with Orange County's roadway construction as a way of reducing potential conflicts and costs. It is equally logical to combine the engineering work, especially given that Orange County will soon put the road construction project out for bid. Having one engineering firm do both projects in the same construction area will reduce the cost of design and facilitate coordination of the two projects. t ".' Issue: The Engineering Department has proposed to use the firm designing the Clarcona-Ocoee Road Widening Project to also design the intersecting City reclaimed water system extension, and requests that the City Commission approve the Inwood Consulting Engineers, Inc., price proposal. Recommendations The Engineering Department recommends that the City Commission approve the proposal of Inwood Consulting Engineers, Inc., to design the Windstone Retrofit and Forest Trail Extension Reclaimed Water System and authorize staff to take the actions necessary to procure these services. To fund the work, staff recommends that the City Commission approve the commitment of $34,605.00 in budgeted Wastewater Operating funds, authorize the Mayor and City Clerk to accept the proposal, and direct the Finance Department to issue the required purchase order. 1 Attachments: Project map and proposal submitted by Inwood Consulting Engineers, Inc. The proposal-+ separately lists the cost of each project component and the related surveying work. Financial Impact: The funding for the $34,605.00 purchase order will be financed by budgeted Wastewater Operating funds designated for the extension of the City's reclaimed water distribution system. Type of Item: (please mark with an 'x'J Public Hearing Ordinance First Reading Ordinance Second Reading Resolution Commission Approval Discussion & Direction For Clerk's Deot Use: _____ Consent Agenda _____ Public Hearing _____ Regular Agenda Original Document/Contract Attached for Execution by City Clerk == Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) ~f~<< N/A N/A N/A 2 ~~j!. November 10, 2008 OCE-002-02 AI Butler, AICP, M. Eng. eLP. Manager City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 Re: Clarcona-Ocoee Road - Reclaimed Water Main Crossing and Windstone Subdivision Dear Mr. Butler, Please find attached Inwood Consulting Engineers' revised proposals for the Reclaimed Water Main Crossing of Clarcona-Ocoee Road and the Windstone Subdivision Reclaimed system design. The scope of services is outlined within the manhour estimates and illustrates our staffing proposed for this assignment. These proposals have been revised from previous ones to more closely reflect the work effort anticipated for these projects. Thank you for the opportunity to provide these services and we look forward to serving the City on these projects. Very truly yours, INWOOD CONSULTING ENGINEERS, INC. ~i)~. CL- David G. Coleman Vice President Clarcona-Ocoee Road Reclaimed Water Main Crossing Proposal C) U) z w c;; w QU)<( u.. <(00 ~ 00:::- ::J o:::U~ en w3:...J D. w<(u.. ... ~ o~w w ::J Oo:::w ..J lXI ...J OWO ~ '....U u.. ~<(O 0 o3:u.. ~ 000 <( o:::W~ :IE :5~- :IE 0:50 :;) u U) W 0::: w 0 0 0 0 0 CI C! 0 0 C! 0 CI m 0> tri "<i N cO cD <( ..... 0 N ...... 0> 0) :I: It) C") co C") ..... ... a.. ~ .,j .,j ~ .0 Ili' 0:: ~ ~ ~ ~ w a.. m w w 11. - to N m ~ co 0::: ~ ::::l e :I: ..J <( l- e I- - 0 0 CI 0 C! iii ..... It) (,) ~ .;: CI) (3 - ~ N (Q 0 ..- .... 0 ... M CI) co == ~ C'll ... C - 0 0 CI 0 ... C! CI) 0 e: 0> CII ~ 'W CI) c - (") -.:t 0 ..- ... N N C! CI) It) CI) 0 e: ..... '61 ~ e: w - 0 0 CI 0 ... 0 ... CI) en "<i o CI) '<t .- e: ...J ..... e: .- ~ ~ CI)CII me: w .... - .... co 0 ..- r-- ... U) 0 .. CI) W N g CII 0::: co ..... C'll ..... o e: 0 ~ ... C'll u.. a..:= ~ i--- 0 CI 0 ~ 0 0 iii 0 Q, Z 0 'u c;; N e: U) ~ .;: a.. 0 0::: i"- 0 0 M <( 0 e: Q) (I) 0::: .Ql :0 :0 c: 'C B w e: UI .g ro W .c. I- W 0 Q) -- ~ ; w 0 UI ~ Q) u.. Q, 0 Q) Q) :E .;: E 0 Q) ~ <{ (,) 0 15 - 15 c ::) en 0 ~ m en e::: en Ul z .2 rJ) CI) e: ... 0 u; 15 c , u:: ;:, ~ 0 I C. <( a.. 0 Ul E 0 ... () c c :E Z I I J: C'll Q) CI) 0 ..- N e: ~ 0 t) 19 a. ::) = Q) Q) III .... .Q Q) 'S E ...J 0 III .... UI UI :E 0 ...J (5 UI 0 ...J 0::: co co .J:J C () <C :5 J: J: B ro (ij .... 0 a.. a.. ..J Q) u Iii I- - .c. .J:J 15 0 0 0 0 ::J 0 l- I- CJ) l- I- TABLE 2 CLARCONA-OCOEE ROAD RECLAIMED WATER MAIN CROSSING CITY OF OCOEE, FLORIDA Task Description Prine. PM SE Enn Desinner CADD Cler Total A. CLARCONA-oCOEE ROAD CROSSING AT FOREST TRAILS 1.0. PRELIMINARY DESIGN PHASE 1,1 Data Collection - Field & Plans Review of existing Reuse Main in Forest Trails 1 1 2 1,2 Digitize Data from Foresl Trails plans (Assumes no survey) 4 4 2.0 FINAL DESIGN PHASE Complele final design and prepare construction drawings (60%, 90%, 100% & 2,2 Final Submittals) Plan Sheets - General Notes, Summary of Pay Items, Mise, Details, Standard Delails, & Geotech Info (2 sheets) 1 3 6 10 Plan and Profile sheets (2 sheets at 20' scale) 2 16 4 22 2,3 Preparation of Specifications and Estimate of Probable Construction Cost 1 2 3 2.4 Permitting - Orange County RfW Utilization - no FDEP permitting assumed 1 2 2 5 2,5 Coordination/Meetinos (1 meetino at 4 hours wilh Countvl 2 2 2,6 Public Meetings or Involvemenl (assumes none is necessarv) 0 TOTAL MAN HOURS 8 0 0 24 0 16 0 48 Scope of Work and Manhour Estimate TABLE 3 SUMMARY OF OTHER DIRECT COSTS (Lump Sum) CLARCONA-OCOEE ROAD RECLAIMED WA TER MAIN CROSSING CITY OF OCOEE, FLORIDA Total Unit Total Description Quantity Units Cost Cost Reproduction Photocopies 600 each $ 0.10 $ 60 Blueprints 48 each $ 1.25 $ 60 1/2-size Computer Plots 0 each $ 5.00 $ - Full-size Computer Plots 24 each $ 8.00 $ 192 Full-size Mvlar Plots 4 each $ 15.00 $ 60 Subtotal - Reproduction $ 372 Computer Services EnQineerinQ hours $ 14.00 $ - CAD DraftinQ hours $ 10.00 $ - Document Processing hours $ 5.00 $ - Subtotal - Computer Services $ - Mileage $ - Postaae, Freiaht, Courier $ - Miscellaneous (permit fees) $ - TOTAL - Clarcona-Ocoee Road Crossing $ 372 Windstone Subdivision Reclaimed Water System Proposal ~ W t- en > en z (/) 0 w t= w =>>z<( ~ ~OO ~ 0::-- t-(/)O::: =>> en:> 0 en --...J D. OO~ - Om ~ w ~ z::>>w ...J ::>> <((/)~ CD :' ~ zw(,) ~ -zo 0 <(0 i:r: ~t-~ 0::(/)0 <( wO~ ~ t-~ <(;:- ~ ;: (,) ::>> en 0 w ~ ;( ...J (,) W 0:: w 0 0 0 0 0 0 0 0 Q 0 0 C! 0 0 0 0 0 C! rn ~ d '<t d cx:i cO to ai c( en N '" '<t Et7 (J) 0 0 0 Q J: ...... co l"- CD tq "!. '<t 'I:t a.. N ri Et7 cD ...... ...... al en 0:: Et7 ...... ...... Et7 ...... N Et7 Et7 Et7 ~ N W ~ a.. rn w w u. - ..... '" co 0 Q rn N LO ..... co 0:: - => 0 J: ..J ~ 0 I- - 0 co 0 0 co 0 C! jij ...... It) U Et7 .;: Gl C3 - co co 0 0 N 0 co "- 0 ... c<) Gl CD it: Et7 III ... C - 0 0 0 0 Q 0 ... 0 Gl d c (J) Cl Et7 'iij Gl C - N N 'I:t 0 co 0 ... ..... co "- 0 Gl to Gl 0 C ...... '61 Et7 c W - 0 0 0 0 0 Q ... C! ... Gl '<t o Gl '<t .- C ...... C .- Et7 GlCl rn c w - 0 '" "- N 0 N ... ..... N 0 - Gl N lil Cl CD ..... III ...... o C Et7 ... III a..:E g - 0 0 0 0 Q 0 '~ jij 0 d III Co 0 ::2: 'u N '0 C Et7 C .;: I1l a.. g - '?- Q) z c;:; ~ :J 0 C/) en c Q) c :> .g -.:- :0 ... c c ui I1l Q) W C/) .g ti 0 Q Q) u .s:::. I- W ;: 0 C/) > ~ Q) I1l U. Co al Q) g (f) Q) Q) .s:::. :::l!i: .;: =>> .s 0 -: Q) ~ :5 u :0 C/) 1ii - c :::::) 111 en ~ ro c ~ a::: C/) VI 0 0 U) Gl C "0 0 0 ti C/) ~ c w a. u: i:O () :;, ~ 0 0 I VI c.. E Z I I I I 0 ... () c c :::l!i: 0 .I: I1l ~ Gl ..... N '" "'" c ~ 0 (3 ~ :::::) := I- Q) Q) Q) Q) ca ... .c Q) :; E ...J en :::l!i: 0 ca ... 111 0 C/) C/) C/) C/) ...J (5 ...I Q co co co co .0 C () c:( ..c ..c ..c ..c iij I1l iij Q5 0 z a. a. a. a. ...J u ro I- 3: - - .s:::. .0 ~ 0 0 0 0 :J l- I- C/) I- TABLE 2 RECLAIMED WATER MAIN AND DISTRIBUTION SYSTEM WINDSTONE SUBDIVISION CITY OF OCOEE, FLORIDA Task Description PM Ene CADD Cler Total A. WINDSTONE SUBDIVISION 1.0. PRELIMINARY DESIGN PHASE Data Collection and Review - Get soils info from Subdivision plans and Other 1,1 design data/standards from City 4 4 1.2 Coordination of Survey Services 1 1 1,3 Preparation of Preliminarv Svstem Lavout (Approximate Iv 30% Plans) 2 8 6 0 16 2.0 FINAL DESIGN PHASE Complete final design and prepare construction drawings (60%, 90%,100% & 2,2 Final Submittals) Cover Sheet, General Notes, Summary of Pay Items, Quantity Tabulation, & Project Layout (5 sheets) 1 8 16 25 Plan and Profile sheets (8 sheets at 20' scale) 8 32 40 80 Geotechnical Sheet 2 4 6 Miscellaneous/Standard detail sheets (3 sheets) 2 6 8 2,3 Preparation of Specifications and Estimate of Probable Construction Cost 2 12 6 20 2.4 Permitting - Not Necessary (Assumes this is under City's Existina Permit) 0 2,5 Coordination/Meetings (3 meetinas at 2 hours each) 6 6 2 14 2,6 Public Meetinas or Involvement (assumes none is necessary) 0 3.0 BIDDING PHASE 3,1 Bidders Questions and Addenda 2 4 6 TOTAL MANHOURS 22 78 72 8 180 Scope of Work and Manhour Estimate TABLE 3 SUMMARY OF OTHER DIRECT COSTS (Lump Sum) RECLAIMED WATER MAIN AND DISTRIBUTION SYSTEM WINDS TONE SUBDIVISION CITY OF OCOEE, FLORIDA Total Unit Total Description Quantity Units Cost Cost Reproduction Photocopies 1,800 each $ 0.10 $ 180 Blueprints 204 each $ 1.25 $ 255 1/2-size Computer Plots 0 each $ 5.00 $ - Full-size Computer Plots 102 each $ 8.00 $ 816 Full-size Mylar Plots 17 each $ 15.00 $ 255 Subtotal - Reproduction $ 1,506 Com puter Services EnQineerinQ hours $ 14.00 $ - CAD Draftinq hours $ 10.00 $ - Document Processinq hours $ 5.00 $ - Subtotal - Computer Services $ - Mileage $ - Postage, Freight, Courier $ - Miscellaneous (permit fees) $ - TOTAL - Windstone Subdivision $ 1,506 James M. Dunn, II, P.S.M. Brian R. Garvey, P,E, Gary B. Krick, P.S.M. Myron F, Lucas. P,S,M, Thomas K, Mead, P,S,M, Timothy 0, Mosby, P,S,M, James L. Petersen, P,S,M, Larry W, Prescott, P,S,M, William C, Rowe, P,S,M, George E, Snyder, P,S,M, Tony G, Syfrett, P,S,M, .a T, Wayne Yongue, P,S,M, Roger Lonsway, P,S,M, (Retired) Steven L. Anderson, Jr., S,I.T, Brad J, Lashley, S,I.T. Abraham I. Remchuk, S,I.T. Donna L. Canney, C,S,T, IV Frank B, Henry, C,S,T, IV David M, Rentfrow, C,S,T. IV Margarita Slavkova,C,S,T, IV Celeste 8, van Gelder, C,S,T. IV SOUTHEASTERN SURVEYING & MAPPING CORP. SURVEYING FLORIDA SINCE 1972 Land Surveying & Mapping Services' Sub-Surface Utility Designation & Location Services' GPS Asset Inventories' Geographic Information Systems November 8, 2008 Via E-mail: dcoleman{tV.inwoodinc.com Mr. David G. Coleman, P.E. Principal Inwood Consulting Engineers, Inc. 3000 Dovera Drive, Suite 200 Oviedo, Florida 32765 RE: Windstone Reuse Main / Ocoee, FL Winds tone at Ocoee - Phases 1 & 2 Sections 33 & 34, Township 21 South, Range 28 East, Orange County, Florida Dear Mr. Coleman, We are pleased to submit our Proposal for surveying services on the above referenced project. SCOPE OF WORK: Provide Surveying Services in accordance with Chapter 61 G 17 -6 F .A.C. to include the following: 1. Locate all improvements and utilities, as evidenced by above ground features or as marked by the designated utility company representative. 2. Obtain spot elevations on natural ground and existing improvements suitable for interpolation of one foot contours to be shown on the final drawing. 3. Establish the limits of roadway rights of way based on record plats, recovered monumentation and occupation. 4. Establish a minimum of (2) site benchmarks per street based on vertical values illustrated on As-Built Plans for the subdivision. 5. Roadway Topographic coverage will be limited to the full R/W plus the 10 foot wide adjacent easement within the Windstone at Ocoee Phases I & 2 Subdivisions (approximately 4,700 linear feet). Only surface features will be included in the survey effort as sub-surface improvements will be extracted from as-built plans by the design engineers. OFFICE 6500 All American Boulevard, Orlando, Florida 32810' Phone: 407.292,8580' Fax: 407.292,0141 . e-mail: infol1i>.southeastemsurvevinQ,com LOCATIONS 1130 Highway 90, Chipley, Florida 32428' Phone: 850,638,0790' Fax: 850,638.8069 . e-mail: infol1i>.southeastemsurvevinQ,com 141 NE Range Avenue. Suite A, Madison, Florida 32340-2456 . Phone: 850,253.0202 . Fax: 850,253,0203 . infol1i>.southeastemsurvevino,com Page 2 Mr. David G. Coleman, P .E. The final product will be two (2) certified prints and an electronic file on disk for your use. Our fee for the above referenced work is outlined on the attached fee schedule. We anticipate completion of the above described work within four (4) weeks after receipt of a written notice to proceed. Payment is expected within thirty (30) days from date of invoice. We look forward to the opportunity to work with you on this project. Sincerely, (7a.w James L Petersen, P.S.M. Vice President / Project Manager JLP:jlp If your firm requires a contract to be in place, a PROFESSIONAL SERVICES AGREEMENT will need to be furnished to Southeastern Surveying and Mapping Corporation in lieu of your signature of approval. No work will be commenced prior to the acceptance of said agreement in writing by both parties. AN AGREEMENT/CONTRACT WILL NOT BE ACCEPTED AFTER THIS PROPOSAL LETTER HAS BEEN SIGNED AND WORK HAS COMMENCED. If the above scope, period of service and method of compensation meets with your approval, please execute below and fax to Southeastern Surveying & Mapping Corp. as notice to proceed along with the notice of commencement. ACCEPTED BY: Authorized Signature Printed Name Date Title The person signing this Acceptance Statement has the legal authority to bind this firm to the terms of this proposal and has read and agrees to the terms ofthis proposal, and additionally has the legal authority to guarantee payment for the tasks completed under this agreement. OFFICE 6500 All American Boulevard, Orlando, Florida 32810' Phone: 407,292,8580' Fax: 407,292,0141' e-mail: info@southeastemsurvevinq,com LOCATIONS 1130 Highway 90, Chipley, Florida 32428 . Phone: 850,638,0790 . Fax: 850.638,8069 . e-mail: info@southeastemsurvevinq,com 141 NE Range Avenue, Suite A, Madison, Florida 32340-2456' Phone: 850,253,0202' Fax: 850,253,0203' info@southeastemsurvevinQ,com ..:l -< 00 o =-. o Cl::: =-. Z o - ~ -< E-o o ;:l 01 ~ ~ ~ 00 o o N 00 ... II) .0 E II) > o Z d) ~ Cl c '@ ~ II) ell ~ II) 0:::: N ~ ell II) ell "" ..<:: j:l., II) C S ell "0 C ~ d) E "" Z .... u II) '0' ... j:l., c .5: E o e- O u OIl c '5. Q.. "" ~ ~ OIl c '>. II) ~ CIl E II) ~ II) ..<:: ~ o CIl g ~ ..... o II) E "" Z o "0 II) .;; o ..... o C U tl ~ c o U ::: ~ 0:::: U Z <: ~ M ::: ~ U z <: ~ N z o CIl 0:::: ~ j:l., CIl r- "'" ~ Cl ::r: u ~ r- ffi CIl " " "" ~~ ... ., :I:e>:: il ~ ;:E:I: " " "" >>" '"C(;j :I:e>:: il ~ ;:E:I: " " "" ~B ... ., :I:e>:: a ~ ;:E:I: " " "" >>" "'Cc; :I:e>:: o o o o o o ..,. o o o N 0\ o o vi - 00 o o o '" - o o vi r- N o o o r- - o ~ '" 00 8 o o o o ..,. o o o \0 ..,. o o vi - ..,. o o o '" - o o vi r- N o o o r- - o o vi 00 o o o o o o ..,. 8 o 00 "'. o o vi ~ o o o o '" 8 vi r- ..,. o o o ..,. '" o o vi 00 il ~ ;:E:I: N N ..,. \0 CIl ...J j:l., >- r- :> ....... r- u <: " " "" ~B ... ., :I:e>:: il ~ ;:E:I: o 0 o 0 vi vi - - o o vi ] '" o U ~ ~ 't: o :I: o o vi - ] '" o U .. " '€ " > 8 o '" N o o vi - N ~ " '" '~ " tj o .9 ~ E o u e & e ~ " f:: ~ ... " > o " " e>:: o o o o o o ..,. o o o 00 \0 ",' o o vi - N '" o o o o ..,. N o o vi r- N '" o o o '" o o vi 00 o o vi ::: o o vi - - ~ 'il ~ ... ., " Jj o o r- ::!, ~ c: '" r/j " :.a ~ 6h 8- o f- o o o o o o ..,. o o o o o vi ::: o o o o o vi r- o o o o o vi 00 o o o o o vi o o o o o o ..,. o o o o o vi - o o o o o vi r- o o o o o vi 00 o o o o o vi o o o o o o :! o o o o o vi - - o o o o o vi r- o o o o o vi 00 o o o o o vi - o o o o o o o o o o o o o o o o o o 8 o 00000 ~oooo VlOOOO t-0'I0~ Vl 0 ~ M 1.0 o o o ~~~~~ o o o o o o ~ o ~ c <: "" r.J 'u ~ '8 =-;-5 r.J 5 II) r.J 'Vi r- ~ ell 8 ~ c.S:! '8 ::l 8 II) CI.l j:l., CIl ~ ~ ::l ...J ... o ~ t: ~ CI.l ~ ~ II) ... c U u ~ c a 8. ~ ~ dfJ I II) ~ 0 ~ Cl ~ ~ '" II) '" = II) Q.. loOi r.J '" = Q II) = ~ ~ ~ '" ~ o o o o ~ Vl o N ~ ~ ...J <: E- o E- r.J r.J ~ ~ ::l CI.l ~ ~ ::l ...J ." ~ -2. C'D n .... 3: C) "'C