Item #04 Approval of Change Order No. 1 with Schuller Contractors Inc. for the Reclaimed Water System Retrofit c.enter of Good LI ,,-'oe . l'~ ~ AGENDA ITEM COVER SHEET Contact Name: Contact Number: Ryan P. Howard, P. E. 407 -905-3100, ext. 1506 Meeting Date: July 20, 2010 Item # 4 Reviewed By: Department Director: City Manager: Subject: Approval of and authorization for the Mayor to execute Change Order No. 1 with Schuller Contractors, Inc. for the Reclaimed Water System Retrofit for Wedgewood Commons and Whitehill Subdivisions. Background Summary: The Reclaimed Water System Retrofit for Wedgewood Commons and Whitehill Subdivisions is a retrofit project which provides 156 residential homes with reuse water for irrigation. The system connects to the existing system at White Road and Clarke Road. The project also provides a 16" reclaimed main to facilitate future system expansion. Due to conditions in the field during construction a portion of reclaimed water main had to be installed using open-cut due to utility conflicts, MJ adaptors had to be used for valve and fitting connections due to warranty issues, and electrofusion couplers where used for connections to eliminate the need for large pits to be made. As with any construction contract that includes unit pricing and estimated quantities, the actually installed quantities need to be reconciled with the contract. Required Changes as part of this change order are as follows: Item No.1-A: The 16" reclaimed water main which crosses Rachel's Ridge Loop at the intersection of Robyn's Glenn Road was installed by open-cut method rather than the planned directional drill method. The additional work items associated with installation method are: 1) Removal/disposal of materials, 2) replacing the road base, and 3) replacing the asphalt. The existing sanitary forcemain was located in the field under the roadway rather than under the sidewalk as determined during design. The location of the forcemain made directional drill installation impossible. This item has an additional cost of $4,889.00. Item No.2-A: Mechanical Joint adapters were required. At all locations where the new 16" reclaimed water main is connected to a valve or fitting. The designed pressure restraints would not be guaranteed and warranted by the manufacturer for any connections over 12" in diameter. The Mechanical Joint Adaptor with accessory kits was needed to make the proper connections. This item has an additional cost of $15,444.78. Item No.3-A: Electrfusion couplers was used to connect the 16" reclaimed water main HOPE pipe sections in locations where long runs of directional drilled pipe were not possible due to site limitations. By using the Electrofusion Couplers the need to excavate large pits necessary to connect the 16" pipe was eliminated which reduced the quantity of excavation, sidewalk, and asphalt which would have been required. This item has an additional cost of $3,704.73. 1 I Item No.4-A: This item is to adjust quantities of various pay items, up or down, based upon the actual work completed. The attached table titled, Close Out Quantity Adjustment, specifically delineates the line items that were overrun and underrun. The items listed as negative numbers are actually for work not needed and is money left in the contract. The items listed as positive numbers are for overruns and is additional money due the contractor. There were 25 items of work under this contract on this project. There were 6 work items that were over the estimated contract quantity which had a value of $16,606.44 to the contractor and 6 work items that were under the estimated contract quantity which had a value of $5,880.50 to the City. The net result is a addition to the contract amount of $10,725.94, with no adjustments to contract time. The total additional cost of this change order is $34,764.45. Issue: The Engineering Department has proposed a change order to add 3 additional items and reconcile the installed and contract quantities for several bid items. Recommendations The Engineering and Utilities Departments recommend that the City Commission approve the proposed Change Order No.1, authorize the Mayor and City Clerk to execute Change Order No.1. Attachments: Proposed Change Order NO.1. Financial Impact: The funds required for this change order are included in the project budget. Type of Item: (please marl< with an "x'J Public Hearing Ordinance First Reading Ordinance Second Reading Resolution X Commission Approval Discussion & Direction For Clerl<'s Deat Use: Consent Agenda _ Public Hearing _ Regular Agenda X Original Document/Contract Attached for Execution by City Clerk - Original Document/Contract Held by Department for Execution N/A N/A N/A 2 SECTION 00842 CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 CITY OF OCOEE CHANGE ORDER NO.1 PROJECT NO.: #B 1 0-02 DATE: July 12,2010 CONTRACTOR: Schuller Contractors, Inc. AGREEMENT DATE: January 19,2010 The following changes are hereby made to the CONTRACT DOCUMENTS. Revised CONTRACT PRICE resulting from this CHANGE ORDER $421.730.00 $421.730.00 $34,764.45 $456.494.45 Original CONTRACT PRICE Current CONTRACT PRICE (includes previous Change Orders) Net Increase (Decrease) resulting from this CHANGE ORDER ORIGINAL CONTRACT TIME: 150 Consecutive Calendar Days from Notice to Proceed date March 1. 2010 Current CONTRACT TIME (includes previous Change Orders) Days: 150 Days Net Increase (Decrease) Resulting from this CHANGE ORDER Days: Q Revised Completion Date resulting from this CHANGE ORDER July 29, 2010 Reclaimed Water System Retrofit For Wedgewood Commons and Whitehill Subdivisions 00842-1 I CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Item No.1-A: Install the 16" reclaimed water main which crosses Rachel's Ridge Loop at the intersection of Robyn's Glenn Road by open-cut method rather than the planned directional drill method. The additional work items associated with the new installation method are: 1) Removal/disposal of materials, 2) replacing the road base, and 3) replacing the asphalt. Item No.2-A: Install 16" MJ adapters with accessory kits at all locations where the new 16" reclaimed water main is connected to a valve or fitting. Item No.3-A: Install 16" electrfusion couplers to connect the 16" reclaimed water main HDPE pipe to the 16" reclaimed water main HDPE pipe in locations where long runs of pipe to be directional drilled were not possible due to site limitations. Item No.4-A: This change order is to adjust quantities of various pay items, up or down, based upon the actual work completed. The attached table titled Close Out Quantity Adjustment specifically delineates the line items that were overrun and underrun. The items listed as negative numbers are actually for work not needed and is money left in the contract. The items listed as positive numbers are for overruns and is additional money due the contractor. There were 25 items of work under this contract on this project. There were 6 work items that were over the estimated contract quantity which had a value of $16,606.44 to the contractor and 6 work items that were under the estimated contract quantity which had a value of$5,880.50 to the City. The net result is a addition to the contract amount of$10,725.94, with no adjustments to contract time. III. JUSTIFICATION Item No.1-A: It was not possible to install the 16" reclaimed watermain across the road using directional drill. The existing sanitary forcemain was located in the field under the roadway rather than under the sidewalk as determined in the design locate. The location of the forcemain made directional drill installation impossible. Reclaimed Water System Retrofit For Wedgewood Commons and Whitehill Subdivisions 00842-2 Item No.2-A: Submitted shop drawings indicated that the pressure restraints intended for use in the design to connect the 16" reclaimed water main HDPE pipe to valves and fittings would not be guaranteed and warranted by the manufacturer for any size over 12". The MJ Adaptor with accessory kits was needed to make the proper connections. Item No.3-A: Electrofusion Couplers were added to allow for pipe to pipe connects where the long runs of 16" reclaimed water main HDPE pipe had to be split into shorter runs limited by the retrains of the project staging areas which did not allow for such long runs of pipe to be constructed. By using the Electrofusion Couplers the need to excavate large pits necessary to connect the 16" pipe was eliminated which reduced the quantity of excavation, sidewalk, and asphalt which would have been required. Item No.4-A: During the construction ofthe improvements, various work was either reduced in scope because the work was not needed or their was excess quantities in the pay item or increased because the work was needed or their was less quantities in the pay item to cover the necessary work. This item of the change order is needed to adjust the quantities of the pay items that were not installed at the bid quantities to the amount that was installed to show the job was fully completed, the City approved the line item overruns, and accepted the line item underruns as completed work IV. NARRATIVE OF NEGOTIATIONS Item No.1-A: Prices based upon negotiated unit price cost Item No.2-A: Prices based upon negotiated unit price cost Item No.3-A: Prices based upon negotiated unit price cost Item No.4-A: All line items were adjusted using the unit prices for that line item. Reclaimed Water System Retrofit For Wedgewood Commons and Whitehill Subdivisions 00842-3 V. PAYMENT Change Description Net Increase Unit Unit Price Net Increase Order (Decrease Quantity (Decrease) Price Item No. Install the 16" reclaimed water main Item No. I-A which crosses Rachel's Ridge Loop at the intersection of Robyn's Glenn Road by 48.89 SY $ I 00.00 $4,889.00 open-cut method rather than the planned directional drill method. Install 16" MJ adapters with accessory Item No. 2-A kits at all locations where the new 16" 26 EA $594.03 $15,444.78 reclaimed water main is connected to a valve or fittim!. Install 16" electrfusion couplers to Item No. 3-A connect the 16" reclaimed water main HDPE pipe to the 16" reclaimed water 3 EA $1,234.91 $3,704.73 main HDPE pipe in locations where long runs of pipe to be directional drilled were not possible due to site limitations. Item No. 4-A Adjustment to Quantities to Final $10,725.94 Contract Total Net Increase (Decrease) Change Order No. ! $34,764.45 VI. APPROV AL AND CHANGE AUTHORIZA nON This proposed change to the Contract is to be approved by the City of Ocoee Commission Reclaimed Water System Retrofit For Wedgewood Commons and Whitehill Subdivisions 00842-4 Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE. FLORIDA Schuller Contractors Incorporated By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE. FLORIDA Owner By: Date Attest: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DA Y OF ,2010. APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON ,2010 UNDER AGENDA ITEM NO. By: City Attorney END OF SECTION Reclaimed Water System Retrofit For Wedgewood Commons and Whitehill Subdivisions 00842-5 V G> 0> CJ 0 0 .,; c: 0 0 0 0 0 (J:) CO 0 N e '" 0 0 0 0 0 0 ~ ": v 0 N ... 0 0 0 0 0 <ri 0 0 0 0 0 0 0 <ri 0 0 0 ~ 0 0 0 0 0 -oi N N en 0 0 0 0 0 0 0 <ri (J:) a; 0 0 ~ 0 0 ,...: 0 0 0 0 0 0 '" en v '" 0 0 0 0 0 0 0 ;2; "'. 0 0 V M M en ... (J:) V N N (J:) (J:) ~ N ... C ffl ffl ffl ffl ffl ~ ~ ~ N ffl ffl ffl ffl ffl N ffl N ffl ffl M N M lli ... ~ ffl ffl ~ ffl ffl ffl ~ ffl ~ U v 0 en ... 0 0 0 0 0 0 0 0 0 0 0 (J:) CO .,; III 0 0 0 0 0 '" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r- v 0 '" 0 0 0 0 ~ 0 ~ 0 0 0 0 N U 0; 0 0 0 0 0; 0 -oi 0 .,; 0 .,; <ri 0 -oi 0 N M N M 0 0 ,...: V 0 '" 0 CO N U; V '" '" en '" 0 CO '" 0 N S M M '" en N r- M ;; CO r- N V en CO M V V M r- '" M (J:) 0 r- M III V r- ..... N V r- en 0 N r- r.ci r.ci lli ci ai ~ ai M M lli N ..... lli ci r.ci ai M i- N ~ ai r.ci ffl ai v G> 0 ;;; ;;; ~ ~ N N ~ N N M ~ ffl :ti ffl ffl ffl ~ ffl ffl ffl ffl ffl ffl ffl ... I- ffl ffl ffl ffl ... ffl ffl ffl ffl ffl ... ffl c: '" ::l 0 € ftj c: c: 0 0 0 0 <Xl N 0 u:: '" 0 0 0 0 0 '" 0 0 0 0 0 0 0 0 r- 0 0 0 0 0 0 <Xl V 0 M III ::l ~ ~ ~ ~ ~ -oi 0 ,...: <ri 0 0 ~ 0 ~ M ~ 0 0 0 0 0 0 cO 0 -oi c 0 ~ ~ ~ ~ ~ ~ (J:) M 0 N M ~ N ~ N ~ -oi 0 <ri M N <Xl r- 0 v 0 S M ~ en ~ M ~ M <0 M v 'iij ~ N N N 0 .:; I- :c .Q ::l f/) ... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 :c III 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ 0 0 0 0 0 Q S 0; 0 0 0 0 ::t N <ri 0 .,; 0 .,; <ri 0 cO <ri <0 M N N 0 0 0 U 0 '" 0 <0 U; V '" '" '" 0 ... N 0 M :c ~ M M '" en N ... <Xl '" V ... N ... en <0 M en 0 CD. r- '" r- '" M co "'0 r.ci r.ci v ci ... lli ai N ci N V r- ..... en ai r.ci M lli N N ~ i- M ... ... 3: ~ ~ lli ai ~ N M M M lli N ;;; lli ;;; ;;; ai N ~ M ~ ffl ~ N I- ffl ffl ffl ffl ffl ... ffl ffl ;;; ffl ffl ffl ffl ffl ffl ffl ffl ffl ffl ffl ffl V 'tl ... ... c c ca Ql III III S ~ c 0 III 0 0 0 0 E ::l c: G> 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - :c '" CJ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '" E ::l 'C 0; 0 0 0 0 ~ 0 0 0 .,; ,...: .,; 0 .,; 0 0 0 0 0 ~ <ri 0 0 0 0 Q c:( 0 0 '" 0 '" <ri M ,...: 0 U 0 l1. M M '" en N ~ N N -oi M ;0. N N en 0 M a; N ,...: -oi M -oi ... ... v r- ~ N V <0. r- r- en co ;2; <Xl en ~ N V M 0 ~ CJ 'c r.ci r.ci lli ci ai ... ffl ffl ffl N ai lli ai r.ci r- co en N ffl ffl ffl ffl -; +:l I!! ~ ~ ~ ;;; ;;; ;;; ffl ffl ffl ffl -= 'tl ~ ffl ffl ffl ... ffl ffl ffl C ... ffl ... ffl E- O c: 0 ca 0 ~ ::l U Ql a J!l z Cl ... en en en en en u. u. u. u. U) U) U) U) U) en U) U) U) U) U) >- >- >- >- 'tl ::l 'c -' -' -' -' -' -' -' -' -' 0 -' en en en en Ql 0 ~ I- 3: Ql .. III .e 0 € <3 ... '" 0 0 ... 0 ;; <Xl <0 N M 0 M M <0 0 0 N l; ... c: ~ ~ ~ ~ ~ ~ en N M ~ N ~ ~ ~ N ... M ~ 0 u '" .... v N ~ N ~ M '" M ~ J:l ~ ::l ~ N N M ~ Ql 0 0:: c 0 E 0 S ~ III c: c: '(ij >- x x '(ij c: '(ij a. f/) x x .8 .8 '(ij ~ c: c: .8 .8 ::!: E .. c: c: '(ij '(ij 'C 'C E ~ S '(ij '(ij E E :;; Ul 2 '" 'C 'C c: c: Ul <tl el c: E E c: c: <tl <tl ~ <tl Q) ca 'E :;; :;; <tl <tl 'C '" c: b 8. 3: :;; :;; Q) g! 'C '(ij OJ ~ Q) Q) > <tl <tl '" c: c: 8 e c: '0; E E ~ OJ ~ > > (ij ~ 'C e '0; 8 'tl ~ ~ (ij (ij > Q) 0+- Ul Ul :;; Q) Ql ~ ~ > > E '0 0 e e 'C >t:: Q) Q) ~ .!. E (ij 'C 'C Q) Q) OJ OJ '(ij Q) " ~ c: Ql Q) E E .r:. Q) 'C " 'j; .2 ::l E E OJ OJ '" '" Ul ~ 'C '0; 'C 'C 2 Ul '(ij 'iii '" '" ::> '0; <tl ~ Q U ~ 'S; '(ij '(ij c: c: <tl e Q) ~ ~ c: c: J~ ,g 0::: 0:: Q) Q) e 2 c: b 0 ~ ~ E E .~ Ql '6 J~ J~ 'C E :5 ~ c: '8 0:: CJ Q) (ij ~ :5 '(ij III ::> W W 2 2 E ~ .~ " ~ 8 Ul CIl <tl W W l1. l1. Q) 2 13 13 '" .~ 13 c: c: 0 'C l1. l1. Cl Cl ~ 13 '(ij Ul c: C C c: c: ~ 8 .~ ..g '(ij ::> ::> ~ '2 0 0 e c: Cl Cl ::r: ::r: ::> ::> 'C 'C '" 0 ~ 0 n '" .r:. (ij C c: <tl ::r: ::r: 'C 'C c: <tl 1l 1l -5 ~ .r:. .r:. .r:. .r:. E Q) .S: " .r:. '(ij .Q Ul -5 .r:. " " -5 .r:. " " -5 u Q) Q) 1il .S: c: a. E OJ .r:. " c: c: " c: c: "" c: c: c: c: ..;. J Ul ~ a. c: c: ~ J, c: .S: ~ ~ c: l1. 'C c: c: c: c: 'x <tl 'C el Ul ~ ~ ~ 'J, rlJ ~ 15 c: 8 8 8 8 Q) ~ ~ ~ c: :0 8' c ~ ~ ~ <tl .9 <tl 0 Q) c: ~ ~ ~ ~ <tl <tl <tl E 15 E el (ij (ij (ij (ij (ij (ij (ij (ij (ij (ij ci c: Ci. Ci. Ci. ~ Q) '" .r:. ~ ::> 1il 1il 1il 1il 1il 1il 1il 1il 1il 1il c: .~ .~ .~ .~ 0 ~ ~ ~ Cl c: a. Ul .S: .S: .S: .S: .S: .S: .S: .S: .S: .S: :E Q) Q) 13 <tl c: .~ c: '5 .!: Ul Q) Ul Q) Ul CIl 'C 'C 'C Ci. 0 0- 'C 'C 'C 'C 'C 'C 'C 'C 'C 'C ::> Ul Q, Ul Q, c: c: c: c: ~ .Q el ~ 'C c: c: c: c: c: c: c: c: c: c: u:: Q, Q, <tl <tl <tl 13 c: <tl <tl <tl <tl <tl <tl <tl <tl <tl <tl ::0 ::0 c: OJ 'C <tl ci c;, ::> c;, ::> 8 Q) Q) g! ai ~ 'E 2 (ij .r:. .r:. .r:. .r:. .r:. .r:. .r:. .r:. .r:. .r:. c: 0 c: 0 > > > 1il :;; Ul rJJ Ul rJJ Ul Ul Ul Ul Ul Ul Ul c: '0; 'C '0; 'C ~ 0 0 0 0 :0 ~ 'C 'E 'E 'E "E 'E 'E 'E 'E 'E 'E "0, E E E E c: c: c: oa oa oa oa 0 0 CIl 0 ::> ::> ::> ::> ::> ::> ::> ::> ::> ::> '" <tl Ql Q) Q) Q) ::!: 0:: () (!) ell U. U. U. U. U. U. U. U. U. u. 0: u. u. u. u. ::!: 0:: 0:: 0:: 0:: ... G> e,C N M V '" <0 r- <Xl en 0 ;: N M V It) CD r- <Xl en 0 N N M ... It) 2 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ N N N N N - ::l Z '" x i .. ~ " '6' 4: >- " 'E 11l " o S o .. '" o C3 u ~ 'E o u