Item #03 Approval of Ocoee West Transmission Lift Station #10 and #12 Modifications ocoee florida AGENDA ITEM COVER SHEET Meeting Date: July 7, 2015 Item # 3 Reviewed By: Contact Name: Charles K. Smith, P.E. Department Director: Chart-; , Contact Number: 407-905-3159 City Manager: Robert Fra ,;,�/���/`�-I Subject: Ocoee West Transmission System Lift Station #10 and #12 Modifications Background Summary: As part of the Ocoee West Transmission System Project, and in conjunction with the State Road 50 widening project, sewer flows from the South and North Maguire Road areas and along State Road 50 West of Bluford Avenue shall be temporarily directed to the gravity collection system on the north side of State Road 50 until the Ocoee West Transmission Project is completed. To ensure the redirected flows can be accommodated by the gravity system, three (3) lift stations' ( #10, #12 and #62) flows need to be throttled in concert with each other. To accomplish this work, each station needs to be equipped with Variable Frequency Drives (VFDs) and Radio Terminal Units (RTUs) capable of communicating with each other through the Alarm Monitoring Control Center. Lift Station #62, for which construction shall begin with the next 45 days, is planned to be outfitted accordingly. Rehabilitation of Lift Station #10 shall be completed in July 2015, and it will need to be retrofitted with VFDs and have its RTU (SciText SCADA programmable logic controller) reprogrammed. Lift Station #12 is a triplex station (three pumps) which requires three (3) VFD retrofits and the conversion of its RTU to a SciText system. The City's standard for lift stations is the SciText SCADA programmable logic controller system. Issue: Should Commission approve the modifications to Lift Station #10 and Lift Station #12 to accommodate flows to the existing gravity system along State Road 50 west of Bluford Avenue until the Ocoee West Transmission Project is completed? Recommendations Staff recommends that Commission authorize the City Manager to contract with Sanders Company, Inc. in the amount of$29,025.00 to supply the equipment and labor to convert Lift Station #10 and Lift Station #12 to VFD stations running on the Department's Alarm Monitoring Control Center. And Attachments: Proposal from Sanders Company, Inc. for Scope of the Project. Financial Impact: Cost associated with the proposed work to Lift Station #10 and #12 totals $29,025.00. The Department's Approved Fiscal Year 2015 budget includes $459,270.00 for the Ocoee West Transmission System Construction (G/L account 401-531-00-6302), of which $329,684.23 remains unencumbered. Therefore, after this approval, $300,659.23 will remain available for additional work on the transmission project. Type-of Item: (please mark with an "x") Public Hearing For Cle►k's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion&Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney _ / N/A Reviewed by Finance Dept. _ �Jjd/V- N/A Reviewed by 0 v' N/A 2 411 SANDERS COMPANY. INC. 2816 Southeast Monroe Street Stuart, Florida 34997 772.220.2900 Cost Proposal Date: June 25, 2015 Project: Lift Station modifications City of Ocoee Tom King: In accordance with the attached Terms and Conditions, Sanders Company is pleased to offer the following materials/services for the above referenced project. PRICE, DELIVERY AND TERMS OF OFFERING Prices submitted are for equipment/services specifically listed within this Scope of Supply which constitute our complete offering. Scope of the Project Sanders Company is providing an cost proposal for the following scope of work. When looking at lift stations 10, 12, and consumers we can only flow 1500gpm total from all three stations. We reviewed utilizing scada to lock out station based upon level needing to pump and found several issues. In conjuction with the futer lift station 32 (Consumers Court), Our idea is to add VFDs to lift station 10 and 12, adjust speed to limit flow from all stations to an acceptable level. Below is the cost: 2 - 10-hp N4X VFD $2,475 each 3 - 20-hp N4X VFD $3,725 each 5 - Labor to install VFD $1,150 each 5 - Material to install $225 each 1- VFD Scitext 1062 $3,825 each 1- Add IO to existing 1062 $450 each 1-Program exist.1062 to VFD $1,000 each 1 - Level Transducer $750 each TOTAL $29,025.00 Sanders Company will provide a complete turnkey project to the City including Engineering, Design, Fabrication, Installation, Setup, Training, and Superior Support. SCI's price includes: Field Installation Programming Start-up and Training PAGE 1 OF 3 SANDERS COMPANY, INC. 2816 Southeast Monroe Street Stuart, Florida 34997 772.220.2900 Engineering Submittals, Operation & Maintenance Manuals 1-Year Warranty Factory Check Out SCI's price does not include: Taxes Cost Proposal: See Above PLUS TAX if applicable. FOB factory with freight allowed to jobsite, shipped via standard commercial carrier. DELIVERY: 8-10 weeks after complete and acceptable approval is received in the Stuart offices of Sanders Company, Inc. SUBMITTAL FOR APPROVAL: 5 - 7 weeks after acceptable purchase Agreement is received in the Stuart offices of Sanders Company, Inc. TERMS OF PAYMENT Based on initial and continuing credit approval by Sanders Company, Inc., the following payment terms apply: Net 30 SCI form 575 Terms and Conditions, which is attached, is an integral part of this offering. Thank you for the opportunity to offer this Scope of Supply. Please contact me with any questions and/or comments regarding this offering. Rom RoOi,ette Sales Cell 321-229-7643 Stuart office 800-247-0880 Ron @Mrsewage.com PAGE2OF3 SANDERS COMPANY, INC. 2816 Southeast Monroe Street Stuart, Florida 34997 772.220.2900 TERMS AND CONDITIONS Sanders Company, Inc. 2816 SE Monroe St Stuart, Fl 34997 AN ORDER WILL CONSTITUTE A CONTRACT BETWEEN THE COMPANY AND THE BUYER WHEN ACCEPTED IN WRITING BY THE COMPANY AT ITS HOME OFFICE IN STUART FLORIDA. A CONTRACT RESULTING FROM THE ACCEPTANCE OF AN ORDER MAY BE CANCELED OR ALTERED BY THE BUYER ONLY IF AGREED TO IN WRITING BY THE COMPANY AT ITS HOME OFFICE SUBJECT TO PAYMENT OF REAONABLE CHARGES NECESSARY TO PROTECT THE COMPANY FROM LOSS. UNTIL ACCEPTED, AS PROVIDED HEREIN,AN ORDER SHALL CONSTITUTE AN OFFER TO PURCHASE. NEITHER THE ACCEPTANCE OF ANY DEPOSIT MADE WITH AN ORDER NOR THE CASHING OF ANY CHECK OR OTHER INSTRUMENT THEREFOR, NOR THE HOLDING OF SUCH DEPOSIT BY THECOMPANY SHALL BE DEEMED AN ACCEPTANCE OF AN ORDER, BUT IF THE ORDER IS NOT ACCEPTED, THE COMPANY WILL PROMPTLY REFUND SUCH DEPOSIT. THE COMPANY SHALL NOT BE LIABLE FOR ANY FAILURE TO MAKE DELIVERY OR OTHER DEFAULT BY REASON OF ANY OCCURRENCE OR CONTINGENCY BEYOND THE REASONABLE CONTROL OF THE COMPANY OR OF ANY OF ITS SOURCES OF SUPPLY. IN THE EVENT OF ANY SUCH OCCURRENCE OR CONTINGENCY THE COMPANY MAY EXTEND DELIVERY SCHEDULES OR MAY, AT ITS OPTION, CANCEL THE ORDER IN WHOLE OR IN PART WITHOUT LIABILITY OTHER THAN TO RETURN ANY DEPOSIT OR PREPAYMENT. SHOULD THE WHOLE ORDER BE CANCELED, THE BUYER WILL REIMBURSE THE COMPANY FOR ALL TAXES, EXPENSES AND SIMILAR CHARGES BASED UPON OR MEASURED BY THE PRODUCTION, STORAGE, SALE, TRANSPORTATION OR USE OF THE PRODUCTS DESCRIBED HEREIN.THE COMPANY SHALL NOT BE BOUND BY ANY TERMS, CONDITIONS, OR REPRESENTATIONS WHICH ARE NOT STATED HEREIN. THE COMPANY SHALL NOT BE OBLIGATED TO PERFORM HEREUNDER IF AT ANY TIME: BUYER'S CREDIT RATING BECOMES IMPAIRED. THE COMPANY SHALL RETAIN A SECURITY INTEREST IN THE PRODUCTS/SERVICES SUPPLIED HEREUNDER TO SECURE PERFORMACE OF BUYER'S OBLIGATIONS AND BUYER SHALL EXECUTE ALL FINANCING STATEMENTS AND OTHER INSTRUMENTS THAT THE COMPANY DEEMS NECESSARY TO PERFECT ITS SECURITY INTEREST. IF THE BUYER DEFAULTS IN ANY OF ITS OBLIGATIONS HEREUNDER OR IS UNABLE TO PAY ITS DEBTS AS THEY MATURE,THE COMPANY SHALL HAVE THE RIGHT TO REPOSSESS THE PRODUCTS WITH OR WITHOUT RESORT TO LEGAL PROCESS. ACCEPTANCE OF THIS SUBMISSION ACKNOWLEDGES THAT EQUIPMENT LISTED IS IN COMPLIANCE WITH THE PLANS AND SPECIFICATIONS OR IS ACCEPTED AS AN EQUAL TO THE PLANS AND SPECIFICATIONS. THE FOREGOING TERMS AND CONDITIONS WILL PREVAIL NOTWITHSTANDING ANY VARIANCE WITH THE TERMS AND CONDITIONS OF BUYER'S ORDER FOR THE PRODUCTS. o r,' G7L PAGE3OF3