Loading...
Item #10 Approval of Winshire Boulevard (Windermere Groves Subdivision) Pavement Repairs 11/4VJP ocoee florida AGENDA ITEM COVER SHEET Meeting Date: October 6, 2015 Item # 1 0 Reviewed By: Contact Name: Stephen C. Krug Department Director: yjoff Contact Number: 6002 City Manager: Subject: Winshire Boulevard (Windermere Groves Subdivision) Pavement Repairs - Commissioner Johnson, District 3. Background Summary: The City accepted the maintenance of the general access roads in the Windermere Groves subdivision in August of 2012. This non-gated community allowed general access of the public throughout since its construction. The roads were originally constructed to City standards, and the Homeowners Association expended significant funds repairing defects prior to the transfer. Since the acceptance, the structural roadway base under the pavers at the entrance on Winshire Boulevard has failed in several spots, and it has been determined the pavers have lost their structural capacity. Public Works has made several repairs with various non-homogeneous materials and has researched various long-term solutions for the entrance feature: 1. Remove all pavers & concrete border, replace with new base and stamped asphalt: $31,000. 2. Remove all pavers, replace with new base and non-decorative asphalt: $10,000. 3. Remove all pavers, replace with new base and stamped asphalt: $23,000. 4. Remove all pavers, replace with new base and concrete pavers: $22,000. All of the proposed options include a new base course constructed of crushed concrete fines. Solution 1 removes all of the existing pavement entrance features and recreates the look of pavers bordered by concrete using stamped and colored asphalt. Solutions 2 through 4 replaces the existing pavers within the existing concrete ribbon curb, thus reducing the overall quantity of new materials required. Public Works is recommending Solution 4 as utilizing concrete pavers will maintain the existing look of the subdivision entrance and is in keeping with the Maguire Road Corridor. There are adequate funds from the completed 2014/15 resurfacing program remaining to cover the cost for the proposed repair. Issue: Request the City Commission approval for Winshire Boulevard restoration. Recommendations: Recommend approval to assign $25,000.00 of the remaining 2014/2015 resurfacing capital funds to restore the existing roadway base and pavers on Winshire Boulevard. Work will be solicited and awarded in accordance with City Purchasing Policy and Procedures. Attachments: None. Financial Impact: There are adequate funds remaining in the 2014-2015 Resurfacing Capital Budget to cover the restoration of Winshire Boulevard to a maximum of $25,000.00. Type of Item: (please mark with an x') Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion&Direction Original Document/Contract Attached for Execution by City Clerk X Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by ( ) N/A 2