Loading...
Item III (C) Approval and Authorization to Execute Addendum No. 91-6 to PEC's Contract for Design Services-Relating to WWTP #1 Abandonment in a Not-to- AGENDA 8-20-91 Item III C 0` �y • a O n0# S•s� James W Shira P.E. OP GOOD CITY ENGINEER/UTILITIES DIRECTOR 150 N. LAKESHORE DRIVE OCOEE, FLORIDA 34761 (407)656-2322 DATE: August 8. 1991 TO: The Honorable Mayor and Board of City Commissioners, FROM: James W. Shira, P. E. City Engineer/Utiliti Director SUBJECT: WWTP # 1 Abandonment - Project Design Addendum to PEC Contract The subject wastewater plant, located at the south end of Sleepy Harbor Drive, serves approximately 400 residences and the elemen- tary and middle school facilities. The plant consistently meets or exceeds state and county treatment standards, but it is an old plant, and our operational costs are increasing. We have determined that the plant can be taken off-line, and the sewage now being treated can be re-routed so that it is pumped to WWTP # 2 on A. D. Mims Road. This can be accomplished by instal- ling a new section of force main to deliver the sewage to our existing lift station at S.R. 50 and Bluford Avenue, from where it will be pumped to WWTP # 2. After the plant is removed from service, the plant property, and the nearby effluent disposal site, which together total approxi- mately 7 acres, can be utilized for other municipal purposes or sold. The attached addendum to PEC's contract is for design services related to this project. The construction will be accomplished by Utility Department personnel. I recommend that the City Commission authorize the Mayor and City Clerk to execute this addendum in the not-to-exceed amount of $11, 329. 00 JWS/jr Attachments THE PRIDE OF WEST ORANGE 9 PEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC L ETT E R OF T R A N S M I TTA L 200 E. Robinson Street Suite 1560 Orlando, Florida 32801 DATE JOB NO. (407) 422-8062 8-7-91 MK-04 ATTENTION Mr. James W. Shira, P.E. RE: TO Mr. James W. SHira, P.E. City of Ocoee 150 N. Lakeshore Drive Ocoee, Fl GENTLEMEN: WE ARE SENDING YOU 1$ Attached 0 Under separate cover 0 Hand delivered the following items: ❑ Shop drawings 0 Prints 0 Plans 0 Specifications 0 Reports O Copy of letter 0 Change order 0 No.Copies No.Sets Description 9 AddPn(dnm 91-6 THESE ARE TRANSMITTED as checked below. ❑ For approval 0 As requested 0 Approved as noted ❑ For your use 0 For review 0 Returned for corrections O For distribution 0 Approved as submitted 0 REMARKS Please sign both and return one copy for our records. :1-5, S 1991 COPY TO SIGNED: i eyes ' II enclosures ere not u noted,pease Wvise. �� /01( ADDENDUM NO. 91-6 TO AGREEMENT FOR CONSULTING ENGINEERING SERVICES ENGINEERING SERVICES RELATED TO THE CITY OF OCOEE'S WWTP NO. 1 SERVICE AREA FORCE MAIN REROUTING AND IMPROVEMENTS This Addendum No. 91-6 hereinafter called the Addendum, as of this day of , 1991, shall constitute an Addendum to the Agreement for Consulting Engineering Services between the City of Ocoee, Florida (the CITY) and Professional Engineering Consultants, Inc., 200 East Robinson Street, Suite 1560, Lake Eola Centre, Orlando, Florida(the CONSULTANT), dated the 21st day of August, 1984, hereinafter referred to as the AGREEMENT. WHEREAS, the CITY and CONSULTANT entered into AGREEMENT whereby the CITY retained the CONSULTANT to provide professional engineering services as required from time to time, and WHEREAS the CONSULTANT will perform consulting engineering services for the CITY as herein defined. NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth on the part of both parties to be kept and performed, the parties do mutually agree as follows: Section 1 - Services of the Consultant 1.1 The CONSULTANT shall perform the Engineering services as outlined in the attached proposal, dated August 7, 1991, relative to the provision of consulting services to the CITY. Section 2 - Compensation 2.1 Compensation by CITY for engineering services provided under this Addendum shall be computed under Paragraph 6.1.2.3 of the AGREEMENT, utilizing the Payroll Cost Times a Factor Method of Compensation with the compensation for this additional authorization not to exceed $11,329.00 as outlined in the attached proposal, without further authorization from the CITY. Section 3 - Time of Completion 3.1 The CONSULTANT shall provide the services within a 60 day period from the notice to proceed. IN WITNESS WHEREOF, the parties have executed this Addendum No. 91-6 the day and year hereinabove set forth. ITY CONSULTANT CITY OF OCOEE PROFESSIONAL ENGINEERING CONSULTANTS, INC. BY: BY: • Mayor Lester Dabbs, Jr. t ' ATTEST: ATTEST: 4.Ant._, lT/I.&FGHi0A4. Jean Grafton, City Clerk pEC�PROFESSIONAL ENGINEERING CONSULTANTS, INC. EOLA PARK CENTRE • 200 E.ROBINSON ST. • SUITE 1560 • ORLANDO, FLORIDA 32801 engineers (407)422-8062 Affiliate Firm:PEC/W. K. Daugherty Consulting Engineers planners surveyors August 7, 1991 P-1087 Mr. James W. Shim, P.E. City Engineer, Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 32761 RE: Proposal for Engineering Services for Wastewater Treatment Plant#1 Service Area Force Main Manifold System ReRouting and Related Improvements Gentlemen: We are pleased to present the attached proposal for Engineering Services related to the above referenced assignment. Our services on this assignment include preparation of construction plans and specifications, and preparation of the required permit applications for the proposed wastewater manifold system improvements recommended in the March 1991 Engineering Report prepared by PEC. Since the City has indicated the intention to construct the improvements with City forces, contract documents, bidding and construction administration services have been deleted from this proposal. Enclosed for your review are man-hour estimates included in Attachment A and cost estimates shown in Attachment B. We propose to perform the engineering services described herein, utilizing the actual hourly rates times a multiplier of 2.92 with a not-to-exceed figure of$11,329 without further authorization from the City. Surveying services and geotechnical support services are included in this proposal. The survey services proposed herein consist of aerial targeting and baseline profile at 100 feet intervals only. All other right-of-way research and field verification is assumed to be completed by others. Sincerely, PROFESSIONAL ENGINEERING CONSULTANTS, INC. i.40.1,1\-1' . S David R. Refling, P.E. Principal DRR/sg ORLANDO CLEARWATER LAKE CITY t- 00 0 O N — N h h N Q N N «> ::>:I a {Z�]<; N co 0 • "t:F[�]...:.....i:....03: ::::?:?ii:: ii iii ElltAIPOV!P.F. 111111g11111g1J111111111111 iQ� 7 h Iiiiiilj -' W:i:. i • H'i::;:: i �: : •r A ce:: :::i; : ::! ii al A v <: :.O,:Q :i::i::::<:::::ii:zsi:s::iis>: 3 a F s o >, •E0 0 eq 8 •3 ae u 3 .5 E '-:. .... ..... .......:177771''.7:i .::: C 0 u i Ir.' — — o 9 N C s u ia:a>::: > II q 0 0 :: : > > a >��� 4 rV u 3i:::,:t :iy:i4 ?i iiii:' q V C V a o p4 fi o I u W p * .y"�j q iiiM q V ILIL — _ w a Y U A u _ u u — - 9 w la S C u J i+ O O C A uYL' O >, J V v U (� in �7 x q v� U o g ° ' N .4- Nos �C C —• C U5—� q $ .3 8 E '9 o q w e y a u a a q u a cE {L cc1 6 6 ui u: PROFESSIONAL ENGINEERING CONSULTANTS,INC. PROJECT COST ESTIMATE ATTACHMENT B P-1087 CLIENT CITY OF OCOEE DATE OF ESTIMATE 7/18/91 LABOR MULTIPLIER 2.92 PROJECT NAME WWTP #1 MANIFOLD SYSTEM REROUTING WITH DIRECT MULTIPLIER 1.0 IMPROVEMENTS LABOR COST DETAIL TASK 1: TASK 2: TASK 3: DIRECT MULTI PRELIM. PREP. OF BIDDING TOTAL LABOR LABOR LABOR CLASS RATE DESIGN CONTR. DOC. ASSISTANCE HOURS COST COST PROJECT MANAGER $29.00 0 2 0 2 $58 $170 SENIOR ENGINEER $22.00 0 5 0 5 $110 $322 ENGINEER $17.00 0 21 0 21 $357 $1,044 DESIGNER $14.00 0 10 0 10 $140 $409 DRAFT. $10.00 0 100 0 100 $1,000 $2,923 CLERICAL $10.00 0 4 0 4 $40 $117 SUBTOTAL LABOR HOURS 0 142 0 142 $1,705 SUBTOTAL RAW LBR DOLLARS SO $1,705 SO $4,984 SUBTOTAL TOT LBR DOLLARS SO $4,984 SO $4,984 •rmtt,t t t,tr *** OTHER DIRECT COSTS DETAIL ACTUAL MULTI ITEM DESCRIPTION ODC ODC TRAVEL/MILEAGE SO SO SO SO SO TELEPHONE (long distance only) SO $5 $0 S5 $5 POSTAGE SO S15 SO S15 S15 REPROD./PRINTING $0 $75 SO $75 S75 SURVEYING/AERIAL PHOTOGRAPHY $4,000 SO SO 54,000 $4,000 PERMIT FEES $0 $250 SO $250 $250 SUBTOTAL DIRECT $ 54,000 $345 SO $4,345 SUBTOTAL MULT DIR $ $4,000 $345 $0 $4,345 trt tww*,tt,t ,t t r ti►t *Int it *** EXTERNAL ASSOCIATES COST DETAIL ASSOCIATE ACTUAL MULTI ODC ODC Michael D. Sims and Assoc. $2,000 $0 SO $2,000 $2,000 TOTAL LABOR, ODC's & EXTERNAL ASSOCIATES $4,000 $5,329 SO $11,329