Loading...
Item III (I) - Approval and Proposed Addendum to PEC Contract for Engineering Services in the Amount of $15,500 for the Municipal Complex and Authorization to Execute the Accepatnace of the Proposal and Authorization to Proceed AGENDA 10-1-91 "CENTER OF GOOD LIVING-PRIDE F ST ORANGE" Item III I ` Ocoee LESI'EK 1.)A Mb,JK. ... • j: ° CITY OF OCOEE RUSTY IOIONERS HIVSON CL 150 N.LAKESHORE DRIVE vO OCOEE FLORIDA 34761 PAUL W.FOSTER (407)656-2322 VERN COMBS fti ., II SAM WOODSON ,�* Of GOO° `.i CITY MANAGER ELLIS SHAPIRO MEMORANDUM TO: THE HONORABLE MAYOR AND BOARD OF CITY COMMISSIONERS FROM: MONTYE BEAMER, DIRECTOR OF ADMINISTRATIVE SERVICES ?) 7 - DATE: SEPTEMBER 26, 1991 SUBJECT: ADDENDUM TO PROFESSIONAL ENGINEERING CONSULTANTS CONTRACT - ENGINEERING SERVICES FOR THE MUNICIPAL COMPLEX The attached proposal for $15,500 from Professional Engineering Consultants represents the land surveying, civil engineering and construction administration services necessary for the expansion of City Hall and Police Department. As indicated in PDR's proposal, PEC was to be a part of its team. Since the City of Ocoee currently has a contract for engineering services with PEC, Staff has elected to utilize their services directly as opposed to indirectly through PDR. Staff recommends that the Honorable Mayor and Board of City Commissioners ( 1) approve the proposal as submitted by Professional Engineering Consultants and (2) authorize the Honorable Mayor to execute the Acceptance of the Proposal and Authorization to Proceed. MB/sas CSS PEc/PR0FEssI0NAL ENGINEERING CONSULTANTS, INC. EOLA PARK CENTRE • 200 E. ROBINSON ST. • SUITE 1560 • ORLANDO,FLORIDA 32801 engineers (407)422-8062 Affiliate Firm:PEC/W.K.Daugherty Consulting Engineers planners surveyors September 23, 1991 P-1146 Ms. Montye Beamer City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 32761 Re: City of Ocoee Municipal Complex Dear Ms. Beamer: Professional Engineering Consultants, Inc. (PEC) is pleased to provide this proposal for the above referenced project. BASIC SERVICES Following is a list of Basic Services we believe necessary to accomplish the work required for the referenced project. Land Surveying Services A) Off-site Sewage Force Main Route Survey: Perform necessary field work and prepare related survey drawings for preparation of final construction drawings. The survey will include location and topographic information along the proposed off-site force main alignment to the connection point with the existing force main from the Tricon Shopping Center lift station. Civil Engineering Services A) Schematic Design: Participate in meetings with the City and project Architect to provide input to the development of the site plan layout; prepare preliminary design layout for the stormwater drainage system, water distribution and sanitary sewage collection/transmission system improvements based on the Schematic Plans (3 plans maximum) prepared by the Architect; prepare preliminary construction cost estimate for the site improvements; and conduct meet- ings/conversations with the local and state regulatory agencies to refine design and permitting criteria for the project; review available soils information for the ORLANDO CLEARWATER LAKE CITY Ms. Montye Beamer P-1146 September 23, 1991 Page 2 project site and prepare recommendations for additional geotechnical investiga- tions, if necessary. B) Design Development: Participate in meetings with the City and project Architect to provide input to finalization of the site plan layout; refine preliminary design layout for the stormwater drainage system, water distribution and sanitary sewage collection/transmission system improvements; prepare preliminary grading for the site and building elevation; prepare preliminary construction cost estimate for site improvements; and prepare preliminary outline for project technical specifica- tions. C) Final Construction Documents: Preparation of final civil engineering calculations and construction documents consisting of construction drawings and technical specifications for the site geometry, paving, grading, drainage, sidewalks, pavement striping and signage, water distribution system (including fire line to the building based on line size determined by the Architect), and sewage collec- tion/transmission system improvements; preparation of construction cost estimate for site improvements; provide coordination as necessary with the project Architect to facilitate the final civil construction drawings and specifications compatible with the architectural construction documents. D) Permitting: The following site-related permits are anticipated to be required prior to construction of the proposed improvements. 1. Preparation and processing of the Florida Department of Environmental Regulation (FDER) permit application for construction of sewage collec- tion/transmission system. 2. Preparation and processing of the Florida Department of Environmental Regulation (FDER) permit application for construction of the water distribution system. 3. Preparation and processing of the St. Johns River Water Management District (SJRWMD) permit application for construction of the stormwater management system improvements. 4. Preparation and processing of the SCL Railroad utility permit for construction of the sewage force main within the right-of-way. Ms. Montye Beamer P-1146 September 23, 1991 Page 3 5. Preparation and processing of the U.S. Army Corps of Engineers (ACOE) short form permit application for dredge and fill requirements within the ditch traversing the site. Though permit applications are prepared according to applicable regulatory agency regulations, codes and laws, we cannot guarantee approval of the permits by the various agencies due to circumstances beyond our control. Construction Administration Services The following construction administration services are anticipated as a part of this proposal. 1. Attend pre-bid meeting, if required, to answer questions concerning the design, specifications, or other matters related to the project. 2. Review bids with respect to the site improvements. The results of such reviews will be reported directly to the Owner and Contractor. 3. Attend pre-construction meeting with Owner, Architect, Contractor. 4. Review and processing of shop drawing submittals. The results of such reviews will be reported directly to the Architect. 5. Provide interpretation and clarification of the construction documents to the Owner and Contractor. 6. Make site visits at intervals appropriate to the various stages of construction as necessary to observe the progress and quality of the various aspects of the Contractor's work, but not less than one site visit per week. Based on observa- tions and/or information obtained during such visits, reports shall be provided to the Architect advising of the work progress and whether the work is proceeding in general conformance with the construction documents. It is estimated that up to eight (8) site visits will be required through the construction phase of the Project. 7. Review periodic pay request with regard to the site improvements. 8. Prepare certification to Owner and regulatory agencies as required by permits obtained for the Project. Ms. Montye Beamer P-1146 September 23, 1991 Page 4 Basis of Proposal This proposal is based on the following conditions and assumptions: 1. The final construction documents will include details of site improvements to five (5) feet outside the building envelope. 2. Geotechnical investigations and construction testing services for the project shall be provided by the Owner. 3. Engineering services related to the surveying of any jurisdictional wetland encroachment are not included in this proposal. 4. Architectural, traffic engineering (e.g., studies, signalization), mechanical engineering (e.g., fire pumps), geotechnical engineering and testing, construction layout surveys, landscape and irrigation design and non-utility engineering (e.g., power, gas, telephone, cable television, site lighting) services will be provided by others. 5. Underground utility location information will be provided by the servicing utility. Any utility investigation required in addition to information made available by the utility companies may be provided as an additional service performed based on the attached hourly rate sheet (Exhibit "A"), or in the case where an underground contractor is required, those costs will be billed directly to the client as they are incurred. 6. No permit application or negotiation with permitting authorities, other than those specifically listed hereinbefore, are included; unusual or extensive request for additional information by regulatory agencies may be provided as an additional service performed, based on the attached hourly rates (Exhibit "A"), upon authorization by the Owner. Additional Engineering Services Following is a list of Additional Engineering Services that are not included as part of the Basic Engineering Services. These services, if required, shall be performed upon proper authorization by the Owner. 1. Services to make measured drawings of or to investigate existing conditions or facilities, or to verify the accuracy of drawings or other information furnished by Owner. Ms. Montye Beamer P-1146 September 23, 1991 Page 5 • 2. Services resulting from significant changes in the general scope, extent or character of the Project or its design including, but not limited to, changes in size, complexity, Owner's schedule, character of construction; and revising previously accepted studies, reports, design documents or Contract Documents when such revisions are required by changes in laws, rules, regulations, ordinances, codes or orders enacted subsequent to the preparation of such studies, reports or documents, or are due to any other causes beyond Engineer's control. 3. Services resulting from the award of more than one separate prime contract for construction of the Project. 4. Prepare for review and approval by Owner or its legal counsel contract agreement forms, general conditions and supplementary conditions, bid forms, invitations to bid and instructions to bidders. 5. Further bidding and negotiating services including assistance in connection with bid protests and rebidding or renegotiating contracts for construction, materials, equipment or services. 6. Providing any type of property surveys or related engineering services needed for the transfer of interests in real property and field surveys for design purposes and engineering surveys and staking to enable Contractor(s) to proceed with their work, and providing other special field surveys. 7. Preparing to serve or serving as a consultant or witness for Owner in any litigation, arbitration or other legal or administrative proceeding involving the Project. 8. Services in connection with work directive changes and change orders to reflect changes requested by Owner. 9. Services in making revisions to construction documents occasioned by the acceptance of substitutions proposed by Contractor; and services after the award of each contract in evaluating and determining the acceptability of mor than three substitutions proposed by Contractor. 10. Additional or extended services during construction made necessary by a significant amount of defective or neglected work of the Contractor, acceleration of the progress schedule involving services beyond normal working hours, and default by any Contractor. Ms. Montye Beamer P-1146 September 23, 1991 Page 6 11. Services required due to conditions different from those itemized under Basis of Proposal or due to events beyond the control of the Engineer. 12. Services related to construction survey and/or as-built surveys. Client Responsibilities and General Terms of Agreement The attached Exhibit "B" defines the Owner Responsibilities and General Terms of Agreement. Payments to Engineer 1. Basic Engineering Services: Engineering services itemized under the Basic Engineering Services shall be performed on a lump sum basis as indicated below: Land Surveying Services A. Off-site force main route survey $ 2,000.00 Civil Engineering Services A. Schematic Design 1,500.00 B. Design Development 2,500.00 C. Final Construction Documents 5,000.00 D. Permitting 1,500.00 Construction Administration Services (See Note 1) 3.000.00 TOTAL $15,500.00 Note 1: The fee for construction administration services includes up to eight site visits during the construction phase. 2. Additional Engineering Services: Any engineering services authorized by the Owner and performed as an Additional Engineering Service shall be performed on a time-and-material basis pursuant to the attached standard hourly rate sheet (Exhibit "A"). 3. Reimbursable Expenses: Reimbursable expenses, such as plotting and printing of drawings and specifications incurred in connection with all Basic and Additional Engineering Services shall be paid by the Owner. Reimbursable Ms. Montye Beamer P-1146 September 23, 1991 Page 7 expenses shall be billed according to the rates itemized in Exhibit "A" for interoffice expenses. Outside reimbursable expenses shall be billed at cost. Reimbursable expenses for the subject project are estimated to not exceed $350.00. 4. Permit Fees: Permitting fees associated with any required permits for the Project shall be paid by the Owner. The terms of this proposal shall be valid for acceptance for a period of sixty (60) days from the date of execution by PEC. We thank you for the opportunity to provide this proposal, and look forward to working with you on this project. We are prepared to commence work on this assignment as soon as an agreement for the work is executed. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. 171141(Richard D. Merkel, P.E. RDM/kh Proposal is Hereby Accepted and Authorization to Proceed is Hereby Given. (Please return one executed copy of this proposal for our records.) Authorized Signature Title Date P-1146 EXHIBIT "A" HOURLY RATE SHEET Principal $85.00/hr. Project Manager/Registered Land Surveyor $70.00/hr. Senior Engineer/Senior Planner $60.00/hr. Engineer/Land Surveyor/Computer Technician $50.00/hr. Technician II/Planner II/Jr. Engineer $50.00/hr. Technician I/Planner I $35.00/hr. Sr. Draftsman $30.00/hr. Draftsman/Engineering Assistant $27.00/hr. Clerical $27.00/hr. Survey 2-Man Crew $60.00/crew hour Survey 3-Man Crew $75.00/crew hour Photocopies $ 0.25/each Mileage $ 0.25/mile Blue Print $ 0.75/sheet Fax $1.00/page Government Permits As Required Effective 5/1/91