Item III (B) Approval and Authorization to Execute Change Order No 6, 7 and 8 for Contract with Butler Construction Company for South Water Plant. AGENDA 6-16-92 • • Item III B t. 4rF4 of Goo‘,• JAMES W.SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 (407)656-2322 MEMORANDUM DATE: June 8, 1992 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utilitie irector SUBJECT: South Water Plant Change Order # 6, 7 and 8 Construction of the South Water Plant is now complete. The attached change orders are for a variety of small items that arose during the final days of construction. Change Order Number 6 is a credit in the amount of $7,150.00. This credit is the result of changing the type of seed used as ground cover, and the deletion of grout in the casing under the turnpike. Change Order Number 7 is a cost of$1,824.17 for the installation of insect screens on the large ventilation louvers in the operations building, modification to a chain-link fence, and several minor electrical wiring modifications. Change Order Number 8 is a cost of$1,518.17 for additional 16" D.I.P. 45° elbows that were required to match field conditions. Together, these three change orders have a net credit value of$3,807.66. This amount brings the total change order amount(excluding the$274,000.00 16" water main addition) to$9,795.80 which represents 0.92% of the original contract amount of $1,067,635.00. rottSe"' THE PRIDE OF WEST ORANGE The Honorable Mayor and Board of City Commissioners June 8, 1992 Page Two I recommend that the City Commission approve these change order proposals and authorize the City Engineer to execute Change Order # 6, 7, and 8 in an amount not to exceed ($7,150.00), $1,824.17 and $1,518.17, respectively. JWS/jbw O * Adjustment as of Change Order No. 05 I (Short title of Change Order) CHANGE ORDER FORM CITY OF OCOEE OPROJECT: SOUTH WATER PLANT I CHANGE ORDER NO. 06 tDATE: CONTRACTOR: Butler Construction Ca. tOWNER: CITY OF OCOEE, FLORIDA AGREEMENT DATE: IThe following changes are hereby made to the CONTRACT DOCUMENTS : Original CONTRACT PRICE $ 1 ,067,615_00 ICurrent CONTRACT PRICE ADJUSTED by previous CHANGE ORDER* $ 1 ,355,534.38 Net (Increase) (Decrease) Resulting from this CHANGE ORDER $ 7,150.00 rThe current CONTRACT PRICE including this CHANGE ORDER $ 1 ,348,384. 38 ORIGINAL CONTRACT TIME: 240 days Date March 28, 1992 Current CONTRACT TIME adjusted by previous CHANGE ORDERS* Date 4/21/92 Net (Increase) (Decrease) Resulting from this CHANGE ORDER Days OCurrent CONTRACT TIME Including this CHANGE ORDER Date 4/21/92 CHANGES ORDERED: I 00842-1 0E-137/WP I. GENERAL IL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITIONS , SUPPLEMENTARY II CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. Change Order No. 06 II. REQUIRED CHANGES See Change Proposal Summary I 11 III. JUSTIFICATION I I IV. PAYMENT • M I V. NARRATIVE OF NEGOTIATIONS 11 I VI. APPROVAL AND CHANGE AUTHORIZATION Par City Commission Action. ;acknowledgements: The aforementioned change, and work affected thereby, is subject to all I provisions of the original contract not specifically changed by this Change Order; and, I 00842-2 OE-137/WP I INI ' 111 It is expressly understood and agreed that the a Chane Order shall have no effect on the original contractt other than oval of ematters :IIIi expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of PI performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. Change Order Request by: City of Ocoee, Florida Change(s) Ordered by: James W. Shira, P.E. ::: RECOMMENDED BY: ACCEPTED BY: Butler Constructio Co 111 Contractor By: By IIISignature - Engineer of Record S 'g . It Date: . Date: Lt(z Jq z 10! Title: Title: V? APPROVED BY: IIICity of Ocoee, Florida Owner II By: Signature Lester Dabbs, Jr. , Mayor Date /1 Attest: Change Order No. Jean Grafton, City Clerk END OF SECTION 11 FOR USE AND RELIANCE ONLY • SY THE CITY:,'F OCOFE, APPROVED/1 10 FORM AND LEGALITY WI day of 19_� FOLEY&LARDNER OF City Atturney I 00842-3 0E-137/WP 1 ► /PROFESSIONAL ENGINEERING (�� PEC b1AJOF1 PARK PLAZi. SUITE •Su0 E pOBIN$ON � Ue !:� I!� CHANGE PROPOSAL enq,nee,: `` Ira 0� ► planners uld.uc Firm PEC.W K D _z, *- „{� SUMMARY sunvema MAR 19 ►992J NO. ► P R O J ECT DATA • NAME: Souk W ArraL Pin AWMBER: O-�_ ( 3 II �"1 LOCATION: �GOA r1.L GATE: (tV N�AA /J 2i OWNER: C m Of OCO,E DRAWING NO.: OTHER: SPEC SECTION: REFERENCE: ::::..::.',.i.. .:-:. .:.. .......1.:.:. ..,..::. 7::,..;. ..,..`..:.--'..-•-• ► RFP No. Work Directive No. ► Field Order No. Other DESCRIPTION: 1 t3 U I I4`�(� 'O S1G Z r0 I. e G' TO 12 1 ./ .t. Ga-o0-1 C� Tu" fir•N �E 'J(J4Ct IL`��ikTl 1� S..CJ PRICING INFORMATION ► 1. DIRECT LABOR Skill/Trade Manhours Rate Cost ► 1.A Production Labor: ( I i ► I ► ► 1 0 Foreman I ► 8 Supervision: 0 S ns>»»>.x:n»».»>:•»:»: ► 1.0 Field► ld Engineering:in c eri 9: 1 :iii>s•::: ,...; .. .. ► 1 .D Expenses:s „»> es- ► 2. MATERIALS AND EQUIPMENT SUBTOTAL (1) ► ► j I1 Description Quantity Unit Price Cost 2.A Incorporated in Work: ► 2.8 Consuned in Performance: I � ► 2.0 Equipment: I 2.0 Direct Costs: I I 2.E Bonds, Insurance: / l3ato� i3coas Krsit itr— ► »»» » »» >%»»> ;>:;.....:»> »»>»>»,» »»:»> SUBTOTAL ( ) ,.... �:::::::i'::� <ii;<:': :'•::: ;.:::'::'ii:: :::::::::>;>::::: >:s:s>?ss»;s>s»»»>s»»»s>sssa»>s»s>. WNER. p CONTRACTOR: , PROJECT NO. ► 0 ENGINEER: I 0 FIELD: ► I DATE: r1 ARCHITECT: 0 OTHER: I I 1 00865 BUTLER CONSTRUCTION COMPANY GENERAL CONTRACTORS P.O.Box 2038 1 P.O.Box 560398 4807 GEORGIA AVENUE / 210 HARDEE LANE WEST PALM BEACH,FLORIDA 33402 �' ROCKLEDGE,FLORIDA 32956-0398 PLEASE REPLY TO: PHONE(407)632-6234 ROCKLEDGE OFFICE FAX#(407)632-6331 March 16, 1992 City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 Attn: James W . Shira, P.E. City Engineer/Utilities Director Credits for berm seed change and deletion of grout in casing Re: South Water Plant Dear Jim: The following is a breakdown of the credit we can offer you for the deletion and/or changes to the scope of work for the above referenced project : 1) Seed and Mulch Change: 40 ,000 sf @ $ . 07/sf = $2800 .00 2) Grout Turnpike Casing: $4350 .00 Total Credit = $7150 .00 Per the direction of Ted Moore we are proceeding with seeding operations with the different type of seed and will remove the small pipe left in place for the grouting of the casing. If you have any questions please give me a call . Sincerely, BUTLER 1S R C l ON COMPANY, INC. D E@EOWIE0 effrey` L . Gibson Vice-President MAR 1 8 i992 * Adjustment as of Change Order No. 06 I (Short title of Change Order) CHANGE ORDER FORM CITY OF OCOEE PROJECT: SOUTH WATER PLANT I CHANGE ORDER NO. 07 11 DATE: April 28, 1992 CONTRACTOR: Butler Construction Co. 11 OWNER: CITY OF OCOEE, FLORIDA AGREEMENT DATE: 11 The following changes are hereby made to the CONTRACT DOCUMENTS: Original CONTRACT PRICE $ 1 .067,635.00 11 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER* $ 1.348.384.38 Net (Increase) (Decrease) Resulting from this CHANGE ORDER $ 1.824.17 11 The current CONTRACT PRICE including this CHANGE ORDER $ 1 ,350,708.55 ORIGINAL CONTRACT TIME: 240 days Date March 28, 1992 11 Current CONTRACT TIME adjusted by previous CHANGE ORDERS* Date 4/21/92 Net (Increase) (Decrease) Resulting from this CHANGE ORDER Days 11 Current CONTRACT TIME Including this CHANGE ORDER Date 41/92 CHANGES ORDERED: 11 11 I 00842-1 0E-137/WP 11 I I. GENERAL 41 This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article l, ' Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. Change Order No. 07 II. REQUIRED CHANGES See Change Proposal Summary 111 III. JUSTIFICATION I IV. PAYMENT r1 a V. NARRATIVE OF NEGOTIATIONS lit • a VI. APPROVAL AND CHANGE AUTHORIZATION Per City Commission action. Acknowledgements: The aforementioned change, and work affected thereby, is subject to all 111 provisions of the original contract not specifically changed by this Change Order; and, • a 00842-2 0E-137/WP III 1 *I III It is expressly understood and agreed Order shall have no effect on thorig nal ontractroval other thanofemaChane ttersexpressly provided herein. • CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted bthe OER for the Work covered by this Change Order. ' The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising !I from or relating to the matters or Work set forth or contemplated this .Change Order. by Change Order Request by: City of Ocoee, Florida Change(s) Ordered by: James W. Shir RECOMMENDED BY: ACCEPTED BY: I ...1 . . Ili ' . Contractor By: 6 III Signature - Engineer of Record B �-�14 . Aillr e Date: Date: 5 Z • le Title: Title: _ r ' APPROVED BY: ICity of Ocoee Florida Owner 11 BY: Signature Lester Dabbs, Jr. , Mayor Date gAttest: Change Order No. Jean Grafton, City Clerk END OF SECTION II FOR USE AND RELIANCE MLY dY THE CITY OF OCOEE, APPROVED AS TO FORM AND tECGAL/TY INS day W 10 FOLEY&LARDNER ~ City Attorney , I 00842-3 0E-137/WP 1 PEC/PROFESSIONAL ENGINEERING CONSULTANTS. INC. CHANGE PROPOSAL MAJOR PARK PLAZA SUITE ,5u0 :co C ROBINSON ST ORLANDO. FLORIDA 32001 M,�� evmeerS Alldl.11e Firm P SUMMARY Banners EC.W K Daugherty Consulting Engmecl; surveyors NO. 8 PROJECT DATA OCOEE SOUTHWATER PLANT NAME: 0E-137 NUMBER: LOCATION: OCOEE, FLORIDA DATE: APRIL 20 a 1 992 OWNER: CITY OF OCOEE DRAWING NO.: OTHER: SPEC. SECTION:REFERENCE: RFP No. work Directive No. Field Order No. Other MISC. CLAIMS FOR EXTRA WORK REQUESTED BY OWNER AND DESCRIPTION: ELECTRICAL ITEMS NOT SHOWN ON DRAWINGS PRICING INFORMATION 1. DIRECT LABOR Skill/Trade Manhours Rate Cost 1.A Production Labor: CARPENTER(SCREENS ) 2 I 1 2 . 00 24 . 00 ' I 1.8 Supervision: ❑ Foreman i}i}.. �:.}:}}}ii:i: : ;:>>}ay}:.}:':" ❑ Sup1 1. e ld( Engineering: ri e n 9: ori}a}i jj: i 1.D SSj}iji}�ia:i Expenses: I ia. SUBTOTAL (1) 2. MATERIALS AND EQUIPMENT Description Quantity Unit Price Cost 2.A Incorporated in Work: ! LOUVER SCREENS 4 — 132 . 29 2.6 Consumed in Performance: � I I I 2.0 Equipment: 2.0 Direct Costs: • 2.E Bonds, Insurance: BLDR' S RISK; 27. 78 BONDS SUBTOTAL (2) 160 . 07 ;;s}}s•:......:.s :..,,>sii::::.•,;;i}iu}••••••••ris:s>:is:s:is>sssr:;a:;iasssasi;}} s••ss>assss•a>s»•»>a>ssr>ss>s>a+s s>s»ssiaisiasv•s ......................: .:,}:.,a..,.,•.:aaaa•.:v::iitii:iiii:v:ii»:.:Ciiii:.:i4�:::.::...:. :i:...::::. ..: .::.:.........: .. ....... ..... : ..... .a.v.ia.S}a.aa a>ivvni WNER: .a. ....n.,,,...n},.:v..:...a.........a...,.....aaa}.a n.:...a...v.:,.... .,............a........ I . ..... .::......::•::::::::::::.:::.::ii:....:::'.i"i:'::i.;..:::::.:i:::�"'i::i'•:is i`i�".`.`:'�':j 1 El CONTRACTOR: 4.15\ � f4- tl(�M� � PROJECT NO. ENGINEER: El FIELD: ii\c 2 2992 Fjji DATE: APR n ARCHITECT: El OTHER: I 00865 i 1 • • 03. C3.'9O 95:46 DON MILLER'S PATRIOT FENCE. INC. P:01 Don Miller's PATRIOT FENCE 125(3rillln Road Nonh (407) 833.4427 8o, 1250 Cecolk Florida 32928 FAX 639-8377 Cocoa,Florida 32923 OWNER REF ! DMPF QUOTE 1B91- ~ Ph# Qc.tTi. r COivDate ST 3 ) 2.3100 Addresnt NARnTc 4.A.) Job Name: C , T.y QCorG' C1JwrP ROCk• 1—F0,51. FI-P Job Loc at ion: a GOFr F44 *0* PROPOSAL, **a RF)tovt + iqv JA-Is ALL ro 2. t' T11w& Feud • Re Ntr 1 S JNG-L E G A Ti Akio ADD I ros. 21. ' Rol-L. GATT 4 ! 1Js a el5. 0oa l.. CSS CQ l r 't) u Z J /i1 ` G,A'r L aQ � � 5 eo TL P1 O u r � C MA Cry. CONDITIONS OP PROPOSAL Yes No , ' N Addendums Acknowledged � Grounding X Bonding X. Core-Drilling Requiteri Certified Payrolls X Special Ground Conditions? Clearing/r3rading X Special Insurance Req. Underground Utilities )( "Suy American" y A , Fence removal X Davis Bacon required Temporary Fence required Permit Included? X We propose hereby to furnish meter lel and I ahc'r -- complete and in accord- ance with the above spec i f !cat ions for the sum of Dol l are ($ 8tau dG All material is guaranteed to be an specified, unless otherwise noted. All work to be completed in a workmanlike manner according to standard practices. Any alterations or deviation from the above spec 1 >#igatic.ns involving extra coats will be executed only upon written orders; and will become an extra charge over and above this estimate. All agree- ments are contingent upon strikes, accidents or delays beyond our control . Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Worker ' s Compensation Insurance. �r - a CA 92. 0 3/ 1 8 2 0 : 4 8 P 0 1 * F 1 • FAX Memo --- -: -..zi:-=--------z-------- , . A.:* 1• Date,1.4.1 )12_—Time:Ailagf , 1 5 • : a ,,Locotion:,_ Rc.4.4.12....._ ,L03(t.......-cb....,y• • • FAX #: Lo ..- ("31 1 I O From: • • • • Location: (.. 'r*-AirS 1,3-.)1/4/41.-...) • • • i FAX #: Lit) 2-CA 231 • • • • Phone #: C9":" (1, - 2149-1 3 • 1 • c.fr,ek•94667 t I 1 i ,.....- 1.4 i., ' ,...k...-- LL 6/1 3 t.A.ft tzi,sr 5 c:\ . ".. --. :us-romER.s ORDER NO. iDEPT. DAT • . 639 — 6.9 39 ; ,--- y--il itiA:41,ex. cI_ 's.,(„Cacr_ f7L(._ i.IT1 ECRTii-—-------------- D I 0 1-tetecie,e_ _kg .WIr .t. ' _ . . SOLO •Y CASH C.O.O. CtIANGlat 014 Af..:Y. PAOSCASTO. VAIO OUT .- (MAN DESCHIP HON PRICEAMOUN I 33 1 i)* 4 X 66 g !tido 9e) .0. /— 3 — *44,-- _IX —2/fiii - . - ----._ ;I ° LouvEas 4 -- 7 • 4-ci 6 • q 0 6 711;.4 B1)?(_______ (1).i.1.1. A.11.1oN • .... I 3 8 --T --Pk- O:C- la ------------ - ----- — - -- .___... ___ ... ........ ...... , 10 DeR. J 00 °° ..........___ • 11 7-1C--- ----- • ..... _____- - -.- 13 14 -... - • . . - - -• • 15 - - .- - - . ---- -'• 18 li a a . . RECD BY MURDAUGH CONST. CO. INC. Electrical Contractors $lite 124 780 Mullet Rd. TO: BUTLER CONSTRUCTION Cape Canaveral, FL 32920-4504 210 HARDEE LANE (407)784-2179 ROCKLEDGE, FL 32955 RE: OCOEE WATER PLANT CHANGE ORDER NO. : 9113-5 DATE; 16 MAR 92 SUBJECT: SHIELDED WIRE TO FLOW SWITCHES Our cost for subject change is $ 180 . 22 . Following is a cost breakdown : #14 SHIELDED MATERIAL: 560 FT @ . 24 $ 134. 40 Sales Tax: 8 .06 TOTAL MATERIAL ; $ 142 . 46 EQUIPMENT RENTAL : S TOTAL RENTAL: $ 0 .00 LADQR; ELEC: HRS @ $ 0 . 00 Q.C. : HRS @ $ 0 . 00 FORE: HRS @ $ 0 . 00 SUPT; HRS e S 0 . 00 S/T $ 0 . 00 P/R TAX & INS: 0 . 28 $ 0 . 00 TOTAL LABOR: S 0 . 00 TOTAL COST: $ 142 . 46 OVERHEAD: 21 . 37 FEE: 16. 38 Very truly y�ur.s , l TOTAL : S 180 . 22 MURDA/GH STRUCTION CO. , INC. Time required to accomplish this change is : Jjnles C. Sp ve , Project Ma -.ger MURDAUGH CONST. CO. INC. Electrical Contractors Suite 124 TO: BUTLER CONSTRUCTION 780 Mullet Rd. 210 HARDEE LANE Cape Canaveral, FL 32920-4504 ROCKLEDGE, FL 32955 (40717844179 RE: OCOEE WATER PLANT CHANGE ORDER NO. : 9113-4 SUBJECT: TRANSFER SW SIGNAL TO CONTROL PANEL DATE: 16 MAR 92 Our cost for subject change is $ 110 . 79 . Following is a cost breakdown: MATERIAL: (see attached) $ 12 . 13 Sales Tax: 0 . 73 TOTAL MATERIAL: $ 12 . 86 EQUIPMENT RENTAL: $ TOTAL RENTAL: $ 0 . 00 LABOR: ELEC: 3 HRS @ 19. 46 $ 58 . 38 Q.C. : HRS @ $ 0 . 00 FORE: HRS Q $ 0 .Q0 SUPT: HES @ $ 0 . 00 S/T $ 58 . 38 P/R TAX & INS: 0 . 28 $ 16 . .3.5 TOTAL LABOR: S 74. 73 TOTAL COST : $ $7 . 58 OVERHEAD: 13 . 14 Very truly swat FEE: 10 . 07 ) TOTAL: $ 110 . 79 !TURD GH S7REACT I ON CO. , INC. \ Time required to accomplish this change is : J;ti" es C. Spject Manager FROM MURDAUGH CONST. '92 03/16 17: 10 P.07 Ii Ni it C) _ u It '.L` iIZ II Ii 2 II II II 0 11 2 I I M II O li •• II ' II i'' II II O VD CO "J CM to .A• co NJ I--' It it II 6 at N 1-+ — 1-r II 11 '0 ►-j O F-'\---\\ II 11 ►-- "pl ('j .C- NJ NJNNJ II Ii N.* )0 0 11 i1 Cate m co II u 1 U! 01 1-3 Ill VI t23 11 „'3„" X X4 Z II II II M ' zf--344 4 u u 0No P 0 0 It II elt C 2 II II S CO Pa z u II *0C" II Ii - r En I1 II yt I I II Z Z II II > y I I II t-. fi u u u .- II II 0 I I 11 I I I I (a) ii n 6 II II x II II y 11 II 5! II II Q X It io it r Cl II C II >f II •)I I I b C7 li Z II 04 0P y II II C I' n I-1 II tN 0 w rvlly it r x 0 L WN0 11 PC II II II H � � b H II a II b p0 2 II II Wbo ►3 II I1 r•. 4 O II I I c) xi ha ii pt n w C '0 Ii II Z () L--. 00000 II C: iI G7 y .. . . . . ii x 03 I I f+ NN1r II M.0 NI II thC5 4. d) N .. Lh n II mx WOOOW II °p fl PI 0000 .1 u r u tai O 00000n a y0 Ii u Ii . II H II II 0 II IP 2 I, II X 0 e5 u X Ii 11 lI H '$ II ii II pi 0-3 11 II II Z till II t-+ 11 I i (n i>y i t NJ II O0 CG 00 .1000 W II "...I 0.4 Ii I I Il 0 �s ii I-- a aeaaa -4N4hJ. a n 2 ril II W 11 000004. W Ch CC0 .1 II II 11 II II II II II Il II II • MVAPAVGN CWNST, C4, INC. Electrical Contractors Suite 124 780 Mullet Rd. TO: BUTLER CONSTRUCTION Cape Canaveral, FL 32920-4504 210 HARDEE LANE (407)784-2179 ROCKLEDGE, FL 32955 RE: OCOEE WATER PLANT CHANGE ORDER NO. : 9113-2 DATE: 16 MAR 92 SUBJECT: CL2 RECORDER NOT SHOWN Our cost for subject change is $ 99 . 88 . Following is a cost breakdown: MATERIAL: (see attached) $ 3 . 99 Sales Tax: 0 . 24 TOTAL MATERIAL: $ 4 . 23 EQUIPMENT RENTAL : $ TOTAL RENTAL : $ 0 . 00 LABOR; ELEC: 3 HRS @ 19 . 46 $ 58 . 38 Q.C. : HRS q $ 0 . 00 FORE: HRS @ $ 0 . 00 SUPT: HRS @ $ 0 .00 S/T $ 58 . 38 FIR TAX & IN$: Q12$ $ 16 . 35 TOTAL LABOR : $ 74.73 TOTAL COST: $ 78 . 96 OVERHEAD: 11 . 84 PEE: 9 . 08 V7rul y ours , TOTAL: S ' 99. 88 1URD GH r %NS'RUCTION CO. , INC. i` Time required to accomplish this change is : ('a s C.4. +vey Pfoject Mal.ge FROM MURDAUGH CONST. '92 03/16 17:08 P.03 u H 11 O u y it M 11 rg it ¢+ 11 NE II 2 II II 4) II 2 II ru II 0 u •• A . II I-- n II 0 kD W v cn to .la (.4 N I-' n II II II 4*# I•-+ I-, I I II uD C( O h-' I-'\\ 1I I I F-, C" C] Nj+ NN II II 1--' NO I I I I W (s3 HH n u I xiM xO) QQ 11 n NJ VII = 23 XI II ti 0 Z Z C) SI SI n II ID Di 5+1 tTJ MH u 5J P-3 t O 2 4 n II t 7 M t' 1.1Jhj u II m7D tg PM /4 II 11 ›i rui rul u II 'd rru n 2r 0 0 II u o �11 II u y 2 0 n II '-3 O II 11 O SC ii ii x 2 II 11 0 II II Z II II I I II II II II II II II II u Ii 1► M 11 0 II a II C It P3 M DI n 0 A 't4 n Po II y II tP II h-1 II C I-1 u P3 I I rx. n) 11i co ,A ►1 Fti u I I Il 0 ma ma '_] t>h a A n 0 H HHDs II a *0Z A u '"3 11 11 r+ r.-] 0 u II H II pc u yr0•e C r CD oaQCD Mo II Cy ii CI Pi •• • • II Z tal II H O NI-• n? II N.+ pi If to ,oatoO ii 5d iI bd N 000 II t'+ II ts3 f7 u+ 000 u II H0 II it li • II II II II ►1 11 I-1 ►1 II II 2 11 11 VII I I CD II 11 'c M II 11 II 14 Ogi II ii 11 t=i H 11 11 I I 2 to I I 11 0J II 1 P3 n W u 0000000Oh-t0 n PA ri 11 II . . . . . . II 01,0 II Ib II 000000 . u5 Jt. 65 II tet:. ii .o II 0000pa1-0cmCO 45. It ii II II II it II II II II it MURDAUGH CONST, CO. INC. Electrical Contractors Suite 124 780 Mullet Rd. TO: BUTLER CONSTRUCTION Cape Canaveral, FL 32920-4504 210 HARDEE LANE (407)784„2179 RQCKLELQE, FL 329$5 RE: OCOEE WATER PLANT CHANGE ORDER NO. : 9113-3 DATE: 16 MAR 92 SUBJECT: SIGNAL CIRCUIT CL2 ANALYZER TO CONTL PNL Our cost for subject change is $ 135 . 95 . Following is a cost breakdown; MATERIAL: (see attached) $ 7 , 39 Sales Tax: 0 . 44 TOTAL MATERIAL : $ 7 . 83 EQUIPMENT RENTAL: $ TOTAL RENTAL: $ 0 .00 LABOR: ELEC: 4 HRS @ 19 . 46 $ 77 . 84 Q.C, ; HE5 FORE: HRS @ $ 0 , 00 SUPT: HRS @ $ 0 . 00 S/T $ 77 . 84 P/R TAX & INS: 0 . 28 $ 21 . 80 TOTAL LABOR: $ 99. 64 TOTAL COST : $ 107 . 47 OVERHEAD: 16. 12 FEE: 12 . 36 Very truly/{ou}s , TOTAL: $ 135 . 95 MGRDUG NSTRUCTION CO. , INC. / Time required to accomplish this change is : �n� � 47;pires C. Sp. vey, roject Ma ger' I FROM MURDAUGH CONST. '92 03!16 1':O9 P. 05 11 1.4 11 C) II H II 1i�i " M 5,1 II 11 I I O II 1g II 11 0 II 11 • n W II it O kD CO J Cn (J+ .A (.4 N F-• I I I I II II stl. rrwl.-a II M tpCAO () .pNNNN M II W O U It II W rn En I I ,I I ;w Ci] ,•3 rl r4 (rnC4 II 11 wr �1 w M .M. M 11 II .y 0 t-1 a 11 II ti II I-1 a ti cm c) II II .hdt�7 E=J •� 00 t'J ;Ij C: II II d h:1 L-4 II II yr N II n y II II C7 Z II u r II H iV II 1 D II ii x I, II II II r II II 1< II it N I II (s7 II DJ 1 II X 110 II 03 C_, I C II Q 1 DW n I t4 u 0 I y II O C re 10 't,' (;J O N P s• �Q CS W N 6 I Ii iI 4 A '00 DI 7 VO r00 II II r I1 Q .jyDal yy 11 II w '?.' n n NJ 53 to y II II DPI r3 O tI I I ?, n ;x1 y II X II trJ I--1 C r' 00000 11 CH 1.4 •• • • . II M rritt ., O ONNI I ,I H `,>y II (!) Q IA On N Iia LT 11 r3 F-1II `.r. 2 co O00 co II , 5 II [s7 Q Q Q Q Q IIII H O II ii It • 11 II II Ii II II II "� 11 It t II (2 11 11 X II 11 I-3 II ,'p1 II II 1 y H II II sz rm II II II V) .'ID 11 -4 II 00000 W 000 co U 1--, r-1 II It II (D Do U Co le 4884) 45au NJ u :4r tp II O00QQ40. 00NCOII II 11 It II II II II II * Adjustment as of Change Order No. 07 (Short title of Change Order) 11 CHANGE ORDER FORM CITY OF OCOEE 11 PROJECT: SOUTH WATER PLANT 11 CHANGE ORDER NO. 08 DATE: April 28, 1992 CONTRACTOR: Butler Construction Co. OWNER: CITY OF OCOEE, FLORIDA AGREEMENT DATE: 11 The following changes are hereby made to the CONTRACT DOCUMENTS: 11 Original CONTRACT PRICE $ 1.067.635.00 t] Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER* $ 1 ,1511,7fR_ SS Net (Increase) (Decrease) Resulting from this CHANGE ORDER $ 1,518.17 11 The current CONTRACT PRICE including this CHANGE ORDER $ 1.351.726.79 ORIGINAL CONTRACT TIME: 240 days Date March 28, 1992 11 Current CONTRACT TIME adjusted by previous CHANGE ORDERS* Date 4/21/92 Net (Increase) (Decrease) Resulting from this CHANGE ORDER Days -0- 11 Current CONTRACT TIME Including this CHANGE ORDER Date 4/21/92 CHANGES ORDERED: 11 I I 00842-1 OE-137/WP 11 I I. GENERALNM It This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITIONS, SUPPLEMENTARY It CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article l,' Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. Change Order No. 08 II. REQUIRED CHANGES See Change Proposal Summary III. JUSTIFICATION OIL 111 IV. PAYMENT I I V. NARRATIVE OF NEGOTIATIONS I . VI. APPROVAL AND CHANGE AUTHORIZATION Per City Commission action. Acknowledgements: The aforementioned change, and work affected thereby, is subject to all III provisions of the original contract not specifically changed by this Change Order; and, I 00842-2 OE-137/WP III iPir ill rig It is expressly understood and areed that the Order shall have no effect on the original contractroval other thanofe maChane ttersI expressly provided herein. !II • CONTRACTOR ack nowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted bthe OER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. Change Order Request by: City of Ocoee, Florida Change(s) Ordered by: James W. Shira, P.E. RECOMMENDED BY: ACCEPTED BY: 1 1 Butler Construc_ ion Co. Contract• t By: B *if ../ 111 Signature - Engineer o Record �'� Date: Date: S'SIq2 • pi Title: Title: v.?. APPROVED BY: 11 city of Ocoee Florida Owner II By: Signature Lester Dabbs, Jr. , Mayor Date gAttest: Jean Grafton, City Clerk Change Order No. END OF SECTION II PON L$E WID MINCE ONLY IN Ng CIN Of OCOEE. AIMOMEo As TO"UM NIMH"" I - car Am mey I 00842-3 0E-137/WP 1 /PROFESSIONAL ENGINEERING CONSULTANTS. INC. CHANGE PROPOSAL I PEC MAJOR PARK PI.AZA SUITE 150 :CO E. ROBINSON ST ORLANDO.FLORIDA 32001 planners dlldi..Ie Firm PEC.W K Daugnerly Consulting Engineers SUMMARY enpmesurrerots NO. `? PROJECT DATA NAME: SOUTH WATER PLANT OE-137 NUMBER: OCOEE, FLORIDA LOCATION: DATE: APRIL 24 , 1 992 OWNER: CITY OF OCOEE DRAWING NO.: SOUTH CONNECTOR CHANGE ORDER OTHER SPC SECTION: REFERENCE: ... ... .: . ...:.. - •....• .:....,:.... ..:... ._ .... RFP No. Work Directive No. Field Order No. Other PROVIDE TWO ADDITIONLA 45° BENDS ABOVE & BEYOND THOSE SHOWN DESCRIPTION: ON THE BID DOCUMENTS . I PRICING INFORMATION 1. DIRECT LABOR Skill/Trade Manhours Rate Cost 1.A Production labor: ( I I I I I I i I I ❑ Foreman » .>,.:::•::,>»• ::,»>:>»»,:,,.,»»:>: 1.8 Supervision: ❑ Supf AKWagT"'•;' »>; 1.0 Field Engineering: 1:4?�s> 1 1.D Expenses: >{ >> •1 I I SUBTOTAL (1) I —(1'- 2. MATERIALS AND EQUIPMENT I Description Quantity Unit Price Cost r I t 2.A Incorporated in Work: I I f � 2.8 Consumed in Performance: II2.0 Equipment: I I 2.0 Direct Costs: • 2.E Bonds, Insurance: BLDR' S RISK,BOND 20. 15 SUBTOTAL (2) ' 20 . 1 5 ;;»fsa>:;» >s>»r••••s,,,,,:......»:»»>>»»>>»»»»»s>»»»:»>»»sa»s»ss»>»»»>a;• •,, ,s»a »»s>:»»»>s»a sss•ss>a»>»»> .. .. .. ... :s:aa:ii?itttttfaf : .::;;:::•;;.:.::::.•;.;:::........ na.'...... s s i .::.:..::.:...>:y :f>fsw•a:T:a:.:�s.,.......�;.:.,;...;_......: >,>. ::iii..ii:iiv:::iiiiiv:iii4:�i:i<iiv:iiiiii: .<i.i..i<•..n:.:::,.i. :::>��.;�•: .,..v.:,.n..n,.>..nnv.i>K,...:.>tv....in .. .a.vw:::,�> ::t;yt;:i<':::it::•:ii::::>;�n:::::: . .. .• .' '•••....;"""'iiiiii<iii4:iiv:ii:isiiia:iv:iii:;ti{<<iiv:i�iii:�::::5 i�:iiiii:iii I WNER: PROJECT NO. 0CONTRACTOR: 0 ENGINEER: 0 FIELD: I DATE: n ARCHITECT: 0 OTHER: li 00865 • 1 3. SUBCONTRACTORS Name Description of Work Cost 3.A Direct: C.A. MEYER 2 ADDITIONAL 16" 1 1_t300 .00 45° BENDS 3.3 Lower Tier: SUBTOTAL (3) 1 , 3 0 0 . 0 0 4. CONSULTANTS Name Description of Work Cost I . SUBTOTAL (4) -0- 5. FEE STRUCTUR A. Contractor Cost Percent Fee I. Direct Labor: -0- 2. Material and quipment: I 20 . 15 1 5 _11 • 8. Subcontractors: 1 , 300 .00 15 195 . 00 I Ii SUBTOTAL (5) 198 .02 TOTAL COST OF THIS CHANGE PROPOSAL (all deductions shown in parentheses): TOTAL EXTENSION OF CONTRACT ME As part of this Change Proposal, the Contractor requests an extension of Contract Time - Justification: PLANS ISSURED FOR CONSTRUCTION ADDED TWO THAT WERE NOT ON PLANS WHEN USED FOR PREPARING OUR . . . RECORD DOCUMENTS As part of this Change Proposal, th C ntract r h provide applicable record drawing information affected by this change. Sign9A Title RESIDENT Contractor BUTLER CONSTRUCTION COMPANY, TNC_ Date APRIL 24 , 1992