Loading...
Item VI (C) Five Year Capital Improvements Program, Fiscal Years 1993-1997"CENTER OF GOOD LIVING - PRIDE OF WEST ORANGE" Ocoee CITY OF OCOEE EL 150 N. LAKESHORE DRIVE C OCOEE FLORIDA 34761 (407) 656-2322 r � 0000 M E M O R A N D U M AGENDA 6-16-92 Item VI C ---]Lrn UAnnb, jK. COMNMK)NERS RUSTY JOHNSON PAUL W. FOSTER VERN COMBS SAM WOODSON CTIY MANAGER ELLIS SHAPIRO TO: The Honorable Mayor and Board of City Commissioners �/ FROM: Montye Beamer, Director of Administrative Services�'� DATE: May 27, 1992 RE: FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM, FISCAL YEARS 1993 - 1997 On May 22, 1992, the Five Year Capital Improvements Program and the Justification by Departments were distributed along with the City Manager's explanation of the process and the priorities. Discussion of the Program is set for the June 2, 1992, Commission Meeting. Action ReQuested The Mayor and Board of City Commissioners approve the Five -Year Capital Improvements Program (1993-1997). MEB:fdg CITY OF OCOEE FIVE YEAR CAPITAL IMPROVEMENT PROGRAM JUSTIFICATION BY DEPARTMENT FISCAL YEARS 1993-1997 PREPARED BY THE FINANCE DEPARTMENT MAY 1992 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: CITY MANAGER NUMBER: (512 ) NO. PROJECT DESCRIPTION JUSTIFICATION 1 Computer Equipment Replacement Current PC is only functional part-time. It is losing hard drive and memory capability. 2 Citizen Relations Software Program to track citizen complaints - which depart- ment it was assigned to, what was done and what the follow up time was. This will enable us to better serve citizens and report problem areas to Mayor and Commissioners. 3 Software/Including Upgrades Operating software requires upgrades on a regular basis. -1- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: FINANCE NUMBER• (513 ) NO. PROJECT DESCRIPTION JUSTIFICATION l pgrades to current NCR System Annual changes in State and Federal requiremen for either payroll, taxes, and audit reporting demand software upgrades. 2 nnual Sytem 10,000 Debt Payment Current contract with NCR for System 10,000 main frame 3 alidator/Installed Validation of receipts through cash drawer. Current validator is over 5 years old and does not have the necessary speed to keep up with current number payments being processed daily. -2- is FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: PERSONNEL NUMBER: (513.3) NO. PROJECT DESCRIPTION JUSTIFICATION Produce document covers for special projects 1 Pouch Laminator and to laminate City employee identification cards. 2 Wordperfect Network Software To enable the department to interface with other network members. Presently under our ABRA (personnel) software we only have the ability to track job history 3 Software & attendance. During the next 3 years we must have the ability to track applications, EEO history, and COBRA to be able to respond to Federal inquires. Presently the department has two legal file 4 Lateral File Cabinets cabinets. Personnel files must be maintained for 75 years. Many of our dead files are in boxes or makeshift cabinets. To better control overtime & compensatory time and to have the ability to respond more 5 Time Clocks accurately to challenges by employees as to time recorded. To better control numerous instances of tardiness on reporting to work & extended lunch periods. The existing printer is slow and is limited 6 Printer in its effectiveness for graphics & font characters. We would like to create an employee newsletter as an example or graphics for survey presentations. -3- f FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: NTNG NUMBER: (515 ) NO. PROJECT DESCRIPTION JUSTIFICATION This would be an asset to the Planning Department for 1 VCR PLAYER/TV viewing a variety of work related videos. Education of developers, staff, etc. Folded plans take-up too much room in file drawers. 2MOBN STAND - DEV. PLANS Existing file drawers should be for correspondence only. 3 TIENT STORAGE RETRIEVAL SYSTEM File storage made easier, also, revisions to Land !_ Development Regulations, ordinances, etc. Equipment will be utilized by many departments. Look -up property owners, legal description, easements, 4MICRO-FICHE READER/PRINTER etc. To be used on an almost daily basis. Community services; news letters; public relations 5 DESKTOP PUBLISHING SOFTWARE material, etc. -4- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: GENERAL GOVERNMENT NUMBER: (516 NO. PROJECT DESCRIPTION JUSTIFICATION 1-16 All items listed in CIP Book Submitted by different departments. These include the furniture, fixtures, and equipmen for the new City Hall. -5- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: PUBLIC wRES ADMI NUMBER: (517 ) 1O. PROJECT DESCRIPTION I JUSTIFICATION Rruio to a t WA,,t,l d cc tb &n W ..� �►l co �'4u�cit,Q Lim h� &, Act, Anda A ct4& IL � �FtA 4 & e � �c¢ c�r,E dca it jai# & ma." t c� L�iafo V °� aI jo, Q colo, rneiAn • Q blas, cures i&& v- &" & " A4 6A p�-,Q,p� � C r»aG`un.� � ►mQc,�.e ,;o � Q nza.,� I m- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:_ PTTRT,TC` w0RKg ADMIN NUMBER: ( 517 NO. IF PROJECT DESCRIPTION Ili/ VCI� CQrn�;�a�i t,,�&VIAcdu JUSTIFICATION c aQ �- rn4& �A0 ua � coQ2. � rq�� � � dh bt�e a+ 4p&nd, &w4t ioct #aa- 4h &,kt� q 6(tt a& oe� &.ter 1, a A" IL � g1[2tG - f ►mau, � "2 ad "air CI�Go 0 a+K� oe lYlatlil�Qtn /�-�&.�o a ftada Aoc&oe ev; c cUr.'al � -7- P-41 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 — 1997 DEPARTMENT: PTTRT.TC WORKS ADMIN NUMBER: ( 517 } NO'rE:::::: PROJECT DESCRIPTION JUSTIFICATIOTd Il � 12J� I &ft Mac" Iv/ �& &4 13 C wte' � P� atadsta &;n I 15 Mac% paAMa"d. l990 dt omi *I& W �ok,& 4uta�, . -DELETE a WE m FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: ADMINISTRATIVE SERVICES NUMBER: ( 518 ) NO. N PROJECT DESCRIPTION JUSTIFICATION 1 Copier Debt Service Payment Current Contract with Monroe (City Hall) 2 Computer System/Software Program The NCR as it is currently configured does not have including upgrades capacity for expansion. The technology is not ad- equate to handle additional changes to the utilities system or to provide the necessary link to Development Review. Instead of enhancing outdated technolo y a new 3 n Desk/PC Workstations (2) To provide work areas for anticipated increase in staff and for director. 4 PC with Software (2) To provide necessary equipment for increase in staff. 5 5 Drawer Lateral filing cabinets Additiopal filing space is needed for increase (2) lin projects and personnel. FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: BUILDING MAINTENAWR NO. I PROJECT DESCRIPTION l S NP 8m .. z 3 yqmm ". man Q NUMBER: (519 ) JUSTIFICATION ,vo to - At aid. #4cGns AC6 could � du,�rd WL nQE cn l�eua c, r'�¢�a647, dao, pmh -10- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: BUILDING MAINTENANCE NUMBER: (519 NO. PROJECT DESCRIPTION Cd4t' JUSTIFICATION . '0 T 2 t LIM TEVTE id r C 7 g OO ��n►/tciaP �. wl �,�� a# adve a4L. Lol Io C� Q �. a4 -11- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: BUILDING MAINTENANCE NO. 1z 13 14 15 PROJECT DESCRIPTION 10""" aAm 4wa =1 I NUMBER: (519 ) JUSTIFICATION Al ' once �° Ip''°�cc-�.!1.e�.� epi _ f a`.'�' ''�°,�f ,a�.a.� �° • � � . i -12- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: BUILDING MAINTENANCE NUMBER: (519 ) iO. PROJECT DESCRIPTION � JUSTIFICATION la T Pct w/ bock 'ta44z yAt-04 �►u� �n nendi+ a" I g acs, f da0l&-4t, /(w oIoUll;� rnQ� u�t� - Alt�n4t�ve io i 11 I I / � ,f • I , � / i .� / / l L -13- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: BUILDING MAINTENANCE NUMBER: (519 ) NO. PROJECT DESCRIPTION JUSTIFICATION i #&A 1p mAin ADM ap �to a3 Gvt We // -- _AAD lA' Ce "y Q 04 Lam. 125 KW u��PaAcid cup trA e N•�•� c•► Yk '�� a Gicoco io ntr.�vo� � � Ga t�a(� c coo a can Owl rnb d" wl ,D2. C�dr2tC ��(.�G U1�tXO �,[k UQ/LI,OUo wc��s//C2 X /IZL�-ILoUUU��CO__ Q g'Ul°�) -14- tc� up FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: POLICE NUMBER: NO. PROJECT DESCRIPTION JUSTIFICATION Priority (3) 1 Marked Patrol Units (5) See Attachment Priority (2) Due to the anticipated traffic Motorcycles (2) ingcongestion ing SR 50) the need to g (exclud- equip our traffic motorcycles unit forurSelectivease and be able to Enforcemento t maneuver in and out of traffic with little obstructions is imminent. Priority (1) We have five (5) mobile units which 10 3 Mobile Radio Units (5) were Purchased years ago. These units will need to be replaced. The longevity of these units is normally8 years. Priority (2) We will need five (5) sirens to be attached to the new patrol units for 93/94 4 Sirens (5) due to the age Of five (5) we currently have. Priority (2) We currently have three (3) vehicles supervisors) without (driven by cages. newer units will need cages whenese units and the for 5 Cages (5) patrol. Each year the Put in operation differentl Police cars are designed Y, so „ t� at times, our current cages g will • -15- MARKED PATROL UNITS 1. For several years we have attempted to implement a total "Indian- apolis Plan". Due to economics/cost of marked units, we have adjusted where as two (2) police officers are assigned to one unit. This enables us not to have to purchase any vehicles for 92-93. In fiscal year 93-94, the current vehicles will have accumulated over 100,000 miles and will have to be downlined. Also we are anticipating hiring additional police officers and will need to supply these officers with vehicles. (See attachment). One of our priorities is to build a new police headquarters. Due to the cost of this project, all of the anticipated Police Impact Fees have been set aside to fund this project for the next ten (10) years. TO: Ellis Shapiro, City Manager FROM: John H. Boyd, Chief of Police DATE: March 17, 1992 SUBJECT: 92-93 PATRaL VEHICLE FMQ= SHIFTS 76,000 - ANTICIPATED MILEAGE (6 DAYS) CURRENT MILEAGE FEBRUARY 1993 120,000 - 301 - 144,000 Downline March 23, 1992 N/A 302 - 22,000 Chief's vehicle 2 303 - 16,000 46,000 1 394 - 8,000 23,000 80,000 - 305 - 156,000 Backup/Downline 1 310 - 90,000 105,000/Backup 319 - 156,000 Backup/Downline 320 - 134,000 Downline March 23, 1992 2 321 - 86,000 111,000 /Traffic 2 322 - 54,230 84,000 2 323 -• 55,000 85,000 1 324 -• 60,000 75,000 (K-9) 2 325 -• 58,000 88,000 2 326: 30,000 60,000 2 327 -• 22,000 52,000 2 328 28,000 58,000 ANTICIPATED MILEAGE OCTOBER 1993/FEB. 1994 N/A 76,000 - 91,000 38,000 - 48,000 N/A 120,000 - 130,000 N/A N/A 126,000 - 136,000 104,000 - 119,000 105,000 - 120,000 85,000 - 95,000 108,000 - 123,000 80,000 - 95,000 72,000 - 87,000 78,000 - 93,000 If we do not replace three vehicles in 1992/93, we will need to replace three plus in 1993/94 due to the fact that none of these vehicles will last until February, 1995. We need to replace at least five (5) vehicles per year not counting added manpower needs (2 per vehicle) due to future growth. JliB/ rmh FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: POLICE NUMBER: ( ) NO. PROJECT DESCRIPTION JUSTIFICATION We have five (5)- light bars that are several years Priority (1) old. We have recently purchased light bars in which parts can be replaced. Five (5) bars, the 6 Light Bars (5) entire unit, must be replaced. Each officer has a personal portable. We will Priority (5) need to purchase additional portables for new officers and extras to have as back-ups when other portables are down. 7 Portable Radios (5) We will need to purchase firearms for additional Priority (1) police officers and to have "spares" available when the others are inoperable. 8 Firearms (5) Bullet proof vests are only safe to five (5) years. Priority (1) We will need to purchase replacements for older ones; and additional vests for new officers. 9 Bullet Proof Vests (5) The Records Dept. needs to add to and upgrade Priority (1) her current software. 10 Records Msanagement Software ' -18- -19- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:— , NUMBER: ( N0. PROJECT DESCRIPTION JUSTIFICATION Priority (2) We are in need for a K-9 that is trained solely for Drug Searches (Lab). If 11 used properly, this cost could be paid back via forfeitures K-9 School of confis- cated money/property. Priority (1) I have initiated a traffic unit. I We currently have one radar unit that is several years old. This unit needs 12 Radars (1) to be replaced to keep four (4) radars in use. ) Priority (2) Due to the growth of the department and corres- pondence, the 13 FAX Machine (1) need for this machine will be present in fiscal year 93/94. Priority (2) 14 800 MHz Radio System See Attachment Priority (2) One Detective's caseload is esculating and the criminals 15 we arrest are repeat offenders and meet a certain profile. This CAP Criminal Profiling computer will aid the detectives in determinin uo J?i etterns and methods atAHs�lniVid-size and large agencies currently -19- 800 MHZ RADIO SYSTEM 14. We have shared the same frequency with Winter Garden Police Department since 1975. Due to growth, the airways are so congested that there are times, during simutaneous emergencies, one of the police departments cannot operate due to having to wait for the other to clear the airway. FCC has no VFH frequencies available and do not anticipate having any (ever). We are anticipating sharing this cost with the Fire Department so we may utilize either Apopka or Orange County (future) 800 MHZ system by purchasing equipment at their cost. A complete system will cost approximately two (2) million dollars. I N O I DEPARTMENT: NO. - 16 17 we 19 20 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 POLICE PROJECT DESCRIPTION NUMBER: ( JUSTIFICATION Priority (2) One of the best tools to eliminate civil liabili- ties is training regarding firearms. This machine will enable the officers to train during simulated Target Ranger actual situations. Priority (2) This equipment enables the dispatcher to transfer to another unit during the time the Base Station is down. If we purchase the 800 MHZ this item Motorola Converta Comm will not need to be purchased. Priority (2) -9 units are made where other officers cannot hare this unit. Also, the unit is constantly tA unning due to the AC operation for the K-9. We Vehicle - K-9 unit lso are called to serve in areas of rough terrain. 4 -wheel drive vehicle is needed. Priority (1) eliminates the high noise level generated Ebya printer in an enclosed area. Printer Sound Shield Priority (1) communicates with numerous languages the telephone. This equipment enables them EThedispatcher ntepret and transmit data as needed. Language Line -21- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: POLICE ' NUMBER: ( ) NO. J PROJECT DESCRIPTION _E JUSTIFICATION Priority (2) My secretary. has* had several additional assignments to given her (i.e., Fiscal Manasgement, Training, etc.). She 21 Portable Computer Priority (2) currently operates with a Silver Reed Typewriter which has very limited memory capability. We are working towards complete automation but due to records retention via state mandate, we still have "paper a load". This machine would eliminate 22 Microfilm unnecessary• storage and aid us as part of,the Priority (1) cost with City Hall. Our current radio system is a lease/purchase. This is an annual payment. 23 Radio Payment Priority (1) This is a training tool that saves thousands of dollars for training. This is an annual lease payment. 24 L.E.T.N. Priority (2) This unit is to be used to fingerprint/via elimina- tion to suspect from innocent victims out in the field. 25 Pedestal Fingerprint Unit -22- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) -23- PROJECT DESCRIPTION JUSTIFICATION This vehicle is to replace the 1980 Ford P.U. 1 4 x 4 Vehicle that is no longer safe to operate as a lieutenant response vehicle. The cost of re- pair to present vehicle from 1989-91 was $2555. Truck is presently out of service. One will be utilized by the Battalion Chief and 2 Misc. Vehicles one will be for the Training Officer This will be the second payment on one Mini - 3 250 GPM Mini -Pumper (2) Pumper (scheduled to be delivered in May, 1992) and the first payment on the second Mini -Pumper which is tentatively scheduled for Station #4 (FY 96-97). It is our intention to place a radio in each 4 Mobile Radios (9) new vehicle prior to placing in service. To be placed in Battalion Chief's vehicle to 5 800 MH Mobile Radio enable communication with Orange County Fire/ Rescue Division and West Orange Ambulance Svc. -23- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) NO. PROJECT DESCRIPTION JUSTIFICATION Will be used by lieutenants. To enable the 6 Digital Pagers (3) department to contact each lieutenant in the event there is an emergency or something occurs that requires immediate attention. This nozzle will enable the extinguishment of 7 1000 GPM Nozzle large fires in a more appropriate amount of time For use with the deck monitor gun. The smoke fan will be a large high -force fan 8 Smoke Fan to permit positive ventilation in large buildings. To improve the water flow at large fires where 9 Flow Meter (2) multiple lines are in use. The present table and chairs have been in Statioi 10 Table and Chairs (Station #2) #2 since 1985 and is in very poor shape. All chairs are broken and have been discarded due to the safety hazard involved. -24- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) NO. 11 PROJECT DESCRIPTION Light Bars and Sirens (2) JUSTIFICATION To equip the new vehicles with emergency respons capabilities. To be used at Stations 3 & 4. Will be utilized 12 Personal Computer (2) for report purposes. One to be used for Fire Inspector's vehicle 13 Mobile Telephone and one for Battalion Chief's vehicle. Will be used for replacements for present radios 14 Portable Radios (10) new stations and for personnel. Portable radios have a life expectancy of approximately 3 years. Will enable the Fire Prevention Bureau to 15 Fire Inspection Software maintain accurate records pertaining to fire Included are standpipes, sprinkler; ,inspections, and any necessary information pertaining to arson. -25- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) NO. 16 PROJECT DESCRIPTION Exercise Equipment JUSTIFICATION This equipment is needed to maintain good physical fitness (Stations 1 & 2). The equipment for Stations 3 & 4 will be included in the necessary package. Replacements for damaged ones. 17 Air Bags Required for entry in hazardous material areas. 18 Hazmat Suits Necessary for the protection of personnel when conducting investigations. Necessary to cover the east and north-east 19 Fire Station #4 areas of the City. To be used at the new stations (#'s 3 & 4) and 20 Fire Pumper (3) one additional pumper for station #1. -26- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) NO. I PROJECT DESCRIPTION II JUSTIFICATION Engine 11 (1982 GMC) fails to meet NFPA 1500 21 Engine 11 (rebuilding) requirements concerning safety. The cost to repair during FY91 to date is $5073. The motor needs rebuilding (approx. $10,000), the cab has sustained rust/deterioration over the years. By reusing the exsisting aluminum body there will be a savings of approx. $40,000 to $50,000. However, none of these repairs will bring the vehicle up to meet NFPA 1500 standards. Needed to equip new vehicles. 22 4" Fire Hose To be used in conjunction with the police dept. 23 Computer Dispatch for faster, more factual dispatching. 24 1500' of 13/4" High Combat Hose Necessary to equip new vehicles. -27- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) N0. PROJECT DESCRIPTION JUSTIFICATION 25 MSA Air Packs (22) Necessary to equip new vehicles. 26 MSA Air Bottles Needed for use with the MSA Air Mask 27 Task Force Nozzles Needed to equip new vehicles. Necessary to maintain the Windermere contract 28 Fire Station #3 and to serve the southern area of the City. 29 Rescue Truck (1 ton) (2) Necessary for the furnishing of Stations 3 & 4 0 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) NO. PROJECT DESCRIPTION JUSTIFICATION To be used to replace defective hose, for 30 1000' of A" Fire Hose extension of hoses and for use in high-rise packs. Needed to replace our present radio system 31 800 MH Radio System which is outdated and unreliable. Requested to replace present worn-out equipment 32 EMS Equipment and to equip new rescue trucks. This item will enable personnel to refill air 33 Portable Air Refill Compressor bottles on fire and hazmat incidents. The addition will be placed on the south side 34 Addition to Station #1 and will be utilized for new offices, training area for personnel and temporary quarters when Station #1 is in the process of renovation to bring up to code and OSHA requirements. -29- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) NO. PROJECT DESCRIPTION JUSTIFICATION Necessary for high-rise buildings and mall 35 90' Aerial Truck areas where necessary. Misc. equipment will be required at new stations 36 Misc. Equipment for New Trucks & and to equip new trucks. New Stations Necessary to pay for land in the east and north - 37 Land purchase (Station #4) east area of the City. For engineering and design of Stations 3 & 4. 38 Architect Design (Stations 3 & 4) To pay back impact fees for stations 3 & 4 to 39 Land Payment Recreation Department. -30- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DEPARTMENT: Fire Control NUMBER: ( 522 ) N0. PROJECT DESCRIPTION JUSTIFICATION Engine #1 is a 1973 pumper that has a aluminum 40 Rebuild Engine #1 body on it. The truck has many major problems beginning to develop. From FY 91 to date $12,200 has been spent on repairs. By removing the aluminum body approximately $40,000 to $50,000 will be saved by avoiding the purchase of a new body. A major emphasis should be placed on rebuilding this truck. This item will be used initially to outfit 41 Protective Clothing new personnel at Stations 3 & 4. -31- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: PROTECTTVE INSPF('mTnrTc NUMBER: ( 524 ) NO. PROJECT DESCRIPTION JUSTIFICATION To provide permits and permitting information 1 Personal Computer at customer counter in new City Hall Complex. Requirements are established by Building, Electrical, Plumbing, and Mechanical Codes. This is a new item. This P.C. will perform as a backup system for existing Building Dept. P.C.;current function is performed by one P.C. that will not be located at new customer counter. If the P.C. is not purchased, adequate service will not be provided. To provide transportation for municipal inspector in order to perform inspections required by 2 1 1/2 ton Mid-size Pick-up Truck Building, Electrical, Plumbing, Mechanical, and various State Codes. This is a replacement for one 1984 4 -door Toyota vehicle; existing vehicle is 11 years old and has 107,600 miles on odometer. Needs major repairs. Repair charges this year= $500.00+. Needed to perform inspections. To provide transportation for Building and Zoning Official in order to perform inspections and attend 3 1 4 -door Mid-size Automobile meetings and conferences. This is a replacement for one 1987 Ford Tempo; At the time of replacement the existing vehicle will be 8 years old with -32- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: PROTRCTTVF. TNS TIONS NUMBER: ( 524 ) -33- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P,P,T,D NUMBER: ( 5 4 1 ) NO . PROJECT DESCRIPTION maii lg 3 1' Jw 4"ana - 11 I %a { r) dccrn.P Bruck JUSTIFICATION . H 6) nwtX&Ak AAAfit gv4t 9UZ90l �e�•P ace Pfp(a c A N73 q -pad - oaw a.00, voo /ha:Lro- cno v� o "adt-a�44. ►� d 1P°n,d° -34- Oct- M&be44 , t�e,o FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P -P T D. NUMBER: ( 5 4 1 } NO. PROJECT DESCRIPTION JUSTIFICATION upon M A4i �¢ot uc ine� �[to � l to w tocc ori Fy 94-95, aeemmi Y)(44t doco A04L ice" � vnau ilia„ abiff P & 3 c"w - - t& u� &YLL ".44"m /tece�cotiucc 6 �a Ret�uatce"se a�udo - UlcLl ce►e�e Tcw! cola dau�r, on do rn"a„ct Fn butes in �'ko Ws • �0 4 ct- U,$�tn &I t 0'- uttB /uuc 2�a a4aU & m4.4 14�j x,t . �ru!x unrnf i4 Qc ' mue f -35- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 — 1997 DEPARTMENT: P.P.T.D NUMBER: ( 5 4 1 ) NO. PROJECT DESCRIPTION QAC, JUSTIFICATIOid U'1 GJ�� Q/1 A Gl�il.11�ito t�i� , LGG.� 11 Mac"� couf� v(�w ck `- [.%) dPjtip �Q,��A�i y'1')QCtlfiao OVA iu yiii o [,t llo� cLd2G� p/•c�: Iq?4 mod �—aoo,000+� %a Tczn PiC� U fs 197(0 '►��tncl,�-3oo,noo+ni�les [ 9 go Pleonwu�, VaQa,� _ 200, o00 + m� ks c 1,90 nn,, pan //..alIn�La_, �41- Q04- Aldt L —36— 11 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P.T.D. NUMBER: (541 ) iO. PROJECT DESCRIPTION 1E Maliu JUSTIFICATION K Amc ''^^- !moo a� uroicld b� t� &It 6'04142a, 4,7 L24 n"d ' 6 Ute. A42" 17 IL IB be aJ*A tb cnuvi rm. a+c,24 44 CcAA.ot ars DW. ure. pd& 2 O nA&U PPTD o Wt4 , u rd".o a4f -1Z rne2a t .�&e� � ate. Wit�► �rnaaf nu.". 4 nab A+",-- -37- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:_ P.P_T D_ NUMBER: (541 ) NO. zi 22 23 2u PROJECT DESCRIPTION &jlna.o /lyt Pour Lt 18cl c{d�,, ,aVJ 25 JUSTIFICATION D °"t Al l --aimi' lay.*m Cant FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P_T.D. NUMBER: (541 ) NO. PROJECT DESCRIPTION JUSTIFICATION f0 z u, aiu� • G�' ��I�4Z Pu- z7 a ,cy AuJ t CdI1 2ct QCCU.i Q A nat Use._ cd m,�&4 dFpt. 4 dd 04)Xt ..� /�Mr ac& "^ �' `�QCj2 v s l am � ��c, A.& ae /t"n G z s 19q,. v4& A i �. 'mom aA10< 2q m� `�� Pry urou.Lcd �ie np.� nA� c� 3� (<P) ,9gq - &4V 4 oxm&�tt" FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P.T.D. NUMBER: (541 ) NO• PROJECT DESCRIPTION a 00V a aon sprct ycrdtv,44 JUSTIFICATION u I G,e so rink�er gyckth wide) � maurtQnq„�/ � `�`�." ptw-c1 v� hotcrcotQlG� C ad'ucd n u d t 6e dt&c h , ri32 cw,n YAi z J til ,off p p -Pave = �b f `fo el .-m.z.4 Q.1,(- Cid l4".,t &Aw6 t;n Eo fo ma tit¢nct� ce ca4 2 hn t ,,i . 'pave : C�h4n7e t M;Ur-dace ,dv q� -40- 2 m FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:P_P.T.D. NUMBER: (541 NO. PROJECT DESCRIPTION JUSTIFICATION ,Pqvp- - 0 it&n, i6'el 4 e Ifo 37 4 6AMo five., includ (/ � nt,�c�, ) &T , utc&4y d�con)- c� � � 37 Lt le �i°f h �ru rl� oto B aa dv a, l�ccoIW�Wc' 4r k,i►q areas Qavi"9 ' U`►� �,,, A 6 crnPacf �ev �""�`' �`d 39 7J �- ►� pad No 'Parkinj area 'Pmmn9 ; �en tra,( park 3�e.3q -41- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P. P.T.D NUMBER: ( 5 4 1 u PROJECT DESCRIPTION f arkinq Qx+ea avin9: P.ck Pk JUSTIFICATION 3pe #39 _ 'riler Minor Pd-fk q3 �ri'nkler Syc1"cn�:IF Parkside Palk iltnc�lcQPinq= k C Ifer Glen Pat' U ffAc� " t� - �d �dc q j Lanclscap�r,� Gazebo � CU 4� "Ur -42- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:_ P.P.T.D. NUMBER: (541 NO. PROJECT DESCRIPTION11 JUSTIFICATION CQ I1dSc pinI' Pte. 0 # �� PaA� q7lands`�""5 GWa�tm 50 Ca,►dscffi+1'ng4 -43- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P.T.D. NUMBER: (541 NO. PROJECT DESCRIPTION (andsc inq . JUSTIFICATION )10--oqq 5 2 *qq IF 53 A Tda ca�k� 5Aj,�, Si dewatk ' sty. jk . vi -44- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P_T.D. NUMBER: ( 5 4 1 NO. PROJECT DESCRIPTION JUSTIFICATION Sidewa mA",f 55 5? 58 t 6, 4m� . fb at4 �q -45- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:__p.P_T,D NUMBER: ( 5 4 1 ) -46- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P.T.D NUMBER: (541 iO. PROJECT DESCRIPTION JUSTIFICATION " (0 IL l� 6q a �'► • � ��� X55 -47- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 — 1997 DEPARTMENT:P,p_T_D NUMBER: (541 ) 1O. PROJECT DESCRIPTION JUSTIFICATIOid ass IL 13 PA&A"fz 41 jos Qf,;� WIVIC FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 — 1997 DEPARTMENT:P-P-T-D NUMBER: (541 ) Id0. PROJECT DESCRIPTION JUSTIFICATION d&v4- ��- #L4 w �. i�SUPh1C1� U 6" co ,QQ Guf /V- CM4&A n2gu pa+cai xe - Set �t" Se #79 —49— FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: p=_p•T•D NUMBER: ( 5 4 1 ) NO.I PROJECT DESCRIPTION j= ' '7 q g II -50- JUSTIFICATION FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P_T.D. NUMBER: (541 -51- PROJECT DESCRIPTION JUSTIFICATION 8� S8 1. Qom. pyo-. *79 SF liaL .� 'qac qo A"+ &" -51- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P,P_T,D NUMBER: (541 ) JUSTIFICATION -52- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P_T.D. NUMBER: (541 NO. p�4 PROJECT of%;PieeIon t &q. �fs 9JUSTIFICATION Www Y�+� e � �- v; 79 c_e_ lF qq �mIq �Do -53- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P,T,D NUMBER: ( 5 4 1 ) NO. I PROJECT DESCRIPTION i cam IDI eul_dQ-,Qac JUSTIFICATION 11 V);. LF--- �. �w�, �C�;�e, �_&_.��� ioz N ir,.uae 103 ri 104 -54- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: P.P.T.D. NUMBER: ( 5 4 1 NO. PROJECT DESCRIPTION JUSTIFICATION ja w"a I� cl- `A.` I10 W-de-Oac -55- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:- p, p- T- D, NUMBER: ( 5 41 ) NO. ll PROJECT DESCRIPTION C'V-- �6, &&,d ��z o � 6'v, wit 6 X79 NYwAvv, "utia 1, �l /�• l � I 1 � �� � -56- JUSTIFICATION FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: MAINTENANCE GARAGE NUMBER: (549 ) N� PROJECT DESCRIPTION JUSTIFICATION po�csP� �&� Q(�ctu� W&&4,II z o �10lC.QOL W, Mitt ao tuwA nat &161 iw#� a- P&A44 �ft - -57- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 — 1997 DEPARTMENT: MAINTENANCE GARAGE NUMBER: (549 ) NO • 11 PROJECT DESCRIPTION fl 3 P dv� ,aocLl- ,& a Ind- /6W IMMCA 3 f q It Avx aiA ?UA 14' a aw C-� Qin �a�ia oi.,�5 -�o NP 10 , JUSTIFICATION i :, ► is : , � � � ' ' / � i FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: MAINTENANCE GARAGE NUMBER: (549 ) NO. (z PROJECT DESCRIPTION inow 4m-aLk JUSTIFICATION io owed. I Aau " ha, /z y u,,, /"A ia l"wl it albuy C� acro, /upb&c %4 a- t4og Qaof l` 4 Aep" au1J-cGt. & a t co n imc& �cblo�w dp R,2�a(�r�-� �jria�:�- ✓r�ctci�.i.�.c• •chi ,�o le-�a c�(� � , o�'/tQu,��Q. e it Mau— 'b6' naw AZ4clu;Q . - Mil 1qf'o /Lela d oc ct h� l�-3 /- q5 • cah2C , U (4 -59- ,- � � �3ga50" r � ��� FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: MAINTENANCE GARAGE NUMBER: (549 ) 14O• PROJECT DESCRIPTION JUSTIFICATION awfac-b wv-nc-k i (o �7 3/4 Ta, pick -uf wf u iiQ�, &d-�f x 4�8 u wo,mcA t&da At &4e "Mid lay rmduA"C, Aec, dlamA b6 i4 fitt Aid " Awat4 14 ygtw 7-4. to iii »u c�a �i cd io� f " iAf- l,¢ - . k- z u 100 hUd-L tuAAL.uEick. P 41 u' euw�.F ennp„�q G�ki� w ro c� nksC. FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: MAINTENANCE GARAGE NUMBER: (549 ) NO. PROJECT DESCRIPTION JUSTIFICATION V-2 "olu -61- [4 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: RECREATION NUMBER: (572) NO. PROJECT DESCRIPTION JUSTIFICATION 1 1/2 Ton Longbed Pickup ($14,000) Present truck is worn out. A truck is needed to move materials and equipment to park areas to prepare for daily activities. 2 Ford #1720 Tractor 23.5 HP ($13,000) Present tractor is down (over $3,000 to repair this time) Was a used tractor when bought 11 years ago. Needed for field preparation. 3 Resurface Tennis Courts: To upgrade parks for community use. To make safer 2 Qa Vignetti Park for users. Cheaper to resurface at this time before 2 @ Youth Center area maximum damage is created. 2 Q Tiger Minor Park ($21,800*) * For total courts at all parks. 4 Reroute emergency entry to Bulldog Football Field Old access was closed off with building of new T -ball ($12,000) field. Emergency unit is needed at field. 5 Entrance road from Adair to Sorensen Baseball field To make traffic flow safer, to eliminate some ($12,600) disturbance to citizens in the area, to offer better security to area. -62- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: RECREATION NUMBER: (572) NO. PROJECT DESCRIPTION JUSTIFICATION 6 Concession Stand at Sorenson Field ($33,000) To upgrade area with renovations of field. Better security control. Old building is becoming a hazard and in need of much repair. 7 Renovation of building (House) at Vignetti Park House is eye sore in present condition, it welcomes ($19,000) vandals. In proper condition, could be used for various community programs or security house. 8 Renovation/Expansion of Recreation Activity Center Present building is outdated and in need of many repairs. The facility could bring in revenues for the city if upgraded to handle the traffic. 9 Playground and exercise equipment at Vignetti, Upgrade for citizen use. Minor, Parkside and Youth Center parks. ($42,000) 10 Sidewalks (hard surface areas) in Vignetti, Minor and Upgrade for better use by citizens especially the Youth Center Parks ($26,000) handicapped. 11 Lighted tennis courts (2) at Parkside Park ($27,000) Upgrade - area is building very fast and facility in area is needed. -63- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: RECREATION NUMBER: (572) NO. PROJECT DESCRIPTION JUSTIFIGATIQN 12 Fishing dock in Silver Glenn Park ($4,600) No boats allowed. Children would have a place (safe) to fish from in the area. 13 8 Lane Track ($53,000) Would be an asset to recreation program on a year round basis (Hersey program). Annual Big Orange and Orlando Wheelchair Games - jogging and cycling area for citizens. 14 Gym ($91,000) Needed for various recreational programs - could bring in outside programs to generate revenues to the city. -64- i FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: STORMWATER DRAINAGE NUMBER: (538 ) iO. PROJECT DESCRIPTION JUSTIFICATION 1 11, p fo o add beA�,�P mower., 10)& �a m��. u4d a/ *'-61 . -65- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 — 1997 DEPARTMENT: STORMWATER DRAINAGE iO. I PROJECT DESCRIPTION AIWA faft�p VaTon qkq pl -af (U4ZA) z iLe�s� P�cliase (Syr) ma 6e cti, aptc�,) 4 VAC �cC. a . NUMBER: (538 ) JUSTIFICATION act 10alunwat`, d/lu.;co IA � o� n . ct at au catcg �aovro �- duu� "-00 � . Mt f114C a d, /11nW &&W b- axAwoA,,., ,►t .•, elf y '°' Q�1•`f' '�: , oo *- Uc% A ez Rinc M6 �1�4-I � c�oul t �t 4 ow ma,,M� . LE 071,[ Yb l tnA 4 R.'.0 1pMZ B7 1v/ 5 cvg4 m m&_,b . depE. +-mu.E 6e f,,,c/QeR,(.. FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: STORMWATER DRAINAGE NUMBER: (538 iO. PROJECT DESCRIPTION � o'm ri JUSTIFICATION mQ �o 1��j6vi e,c.�e V IL -67- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WATER ADMINISTRATION NUMBER: (531) NO. PROJECT )ESCRIPTION ; JUSTIFICATION 1 Facsimile machine (1/2 cost) To transmit and receive facsimile messages from developers, engineers and contractors. 2 Office furniture, additional inspector (1/2 cost) To provide workspace for inspector when hired. 3 Computer Workstation (1/2 cost) Additional GIS operator will be hired during FY 96/97. This workstation will be used by new operator. 4 GIS Terminal (1/2 cost) Additional GIS operator will be hired during FY 96/97. This Terminal will be used by new operator. 5 Flat file for drawings (1/2 cost) Engineering/Utilities currently has no flat file storage for drawings. 6 Lateral file (1/2 cost) To provide additional storage for project and development correspondence files. 7 Inspection & Master Planning Services For services rendered by consultants and contractors for overall utility network design and management and inspection of projects. 9:19 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WATER ADMINISTRATION NUMBER: (531) NO. PRO JECT DESCRIP'�'ON JUSTIFICATIQN 8 Capital Projects Management For services rendered by consultants and contractors for overall utility network design and management and inspection of projects. 9 Debt service on folder/inserter Payments on purchase of this equipment item. 10 Debt service on mailer Payments on purchase of this equipment item. 11 Diazo blueprint machine (1/2 total cost) To enable production of blueprints by city staff instead of outside shop. 12 Uninterruptable Power Supply (1/2 cost) To protect computers from data loss due to power fluctuations. 13 100 MB tape drive (1/2 cost) (3 @ 250) To provide efficient method of hard -drive back up on computer. FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WATER OPERATING NUMBER: (533) NO. PROJECT 'DESCRIPTION JUSTIFICATION 1 Saf-T-Notch Rail System By OSHA regulations each ground storage tank (3) must have a safety belt for working inside. Currently the City is in non-compliance status. 2 5 Cu. Yd. Dump Truck To haul trailer and backhoe on routine repair works. Currently, Utilities have to wait until P.P.T.D. Department can lend their truck. 3 Tandem Wheel Trailer To haul the backhoe. Saves wear and tear on backhoe. 4 Pin -on style forks for backhoe To move heavy pipe safely and faster. 5 "Pow -R Mole" underground conduit installation To install small size pipes under driveways and equipment sidewalks without cutting trenches. 6 Gasoline powered saw To replace existing saw which is worn out. CK110 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WATER OPERATING NUMBER: (533) O. PROJECT DESCRIPTION JCATION USTIFI 7 Fire hydrant flow testing equipment Needed to measure flows and pressures in the water distribution system. Currently we don't have a way to measure these. 8 Electrically powered valve actuator Due to increasing amount of valves in the water distribution system it is no longer possible to open and close valves manually on a regular basis as recommended by the manufacturer. 9 1/2 ton pickup truck with service body To replace vehicle 513 which is a 1979 Ford pick up with 120,000 miles needing extensive repair work. 10 I Wall mounted case for chlorine emergency gas masksI Required by OSHA regulation at each well. Currently the City is in non-compliance status. 11 Fluoride pump 94 - Jamela Plant 96 - Kissimmee Avenue Plant 12 1 Drive motor for water well -71- For replacing existing pumps which have excessive wear and tear. To be used as back up motor at Jamela Avenue and Forest Oaks plants. FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WATER OPERATING NUMBER: (533) NO. PROJECT DESCRIPTION JUSTIFICATION 13 ISE Fluoride meter Required by DER for monitoring fluoride levels. 14 1/2 ton pickup truck with service body To replace vehicle 514 which is a 1984 Dodge with 100,000 + miles. 15 Radio base station To be located at the Utilities Operations Office to be able to communicate with field personnel. Currently there is no way to communicate with the trucks from the office. 16 Table and chairs for break room Existing table is good for eight people. Currently the personnel numbers 16. 17 Television and VCR To be able to show safety and instruction videos. 18 Revisions and additions to Jamela water treatment Currently the south system is isolated from the north plant booster pump system. To interconnect both systems it is necessary to increase fluid pressure to the Jamela Water Plant. 19 Modifications to storage tanks at Jamela WTP Several parts of the elevated water tank are badly corroded and structurally unsafe. Repair work is overdue. -72- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WATER OPERATING NUMBER: (533) NQ.PROJECT DESCRIPTION JIJSTIFICATIQN 20 12" water main on White Road, Hammocks Subdiv. to To improve water pressure throughout the system. Clark Road 21 Upsize water main to 12" through Plantation Grove Currently this water main is 8". The size increase is East subdivision necessary because newer developments require more water. 22 Improvements to water storage facilities at Kissimmee Several parts of the elevated water tank are badly WTP corroded and structurally unsafe. Repair work is overdue. 23 Debt service on backhoe Yearly payments for backhoe lease. 24 Water meters Required for projected growth during the next five years. -73- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT:— c_ nTT n WA c m ' NUMBER: ( 534 ) NO. II PROJECT DESCRIPTION J2 �11n 51F T�/A 2 6fi W -Eracc U -74- JUSTIFICATION WA �ACVAk& A41AU , viW&AA4 � a an.aG tylotic, c�-tR.e /gyp � �v U��� f�Ct coo ao urc couch aloif �G�' �P a11,1110 �t°u'°`.' �G�u�i-.qac. c�'�ucLc�2 � ct • An�Q ,(� ►nc��� 20P.Wi U.dlt1 6/iP Jlaewn iw o I1,..%. � �_ FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: Snr.Tn IASTF NUMBER: ( 534 ) NO. PROJECT DESCRIPTION JUSTIFICATION t Qac pQ bCMV& aW_ YV� I � =� -tip me luck Ute rn� atica AICAlChd �a len . ju -uP u / X Ap_czQ 5 Qo �- FF &� "M� 14 . s-� ,�.�,�.. Q �► "°'°° tee. wAjU� -75- o/oat li" 6 Mo,,k FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WASTEWATER ADMINISTRATION NUMBER- (532) NO. PROJECT DESCRIPTION ;. 7USTIPICATION 1 Facsimile machine (1/2 cost) To transmit and receive facsimile messages from developers, engineers and contractors. 2 Office furniture, additional inspector (1/2 cost) To provide workspace for inspector when hired. 3 Computer Workstation (1/2 cost) Additional GIS operator will be hired during FY 96/97. This workstation will be used by new operator. 4 GIS Terminal (1/2 cost) Additional GIS operator will be hired during FY 96/97. This Terminal will be used by new operator. 5 Flat file for drawings (1/2 cost) Engineering/Utilities currently has no flat file storage for drawings. 6 Lateral file (1/2 cost) To provide additional storage for project and development correspondence files. 7 Inspection & Master Planning Services For services rendered by consultants and contractors for overall utility network design and management and inspection of projects. -76- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WASTEWATER ADMINISTRATION NUS: (532) f0. PRQJEGT DESGRIPTIQN JUSTIFICATION ........... Capital Projects Management For services rendered by consultants and contractors for overall utility network design and management and inspection of projects. g Debt service on folder/inserter Payments on purchase of this equipment item. 9 Debt service on mailer Payments on purchase of this equipment item. 10 Diazo blueprint machine (1/2 total cost) To enable production of blueprints by city staff instead of outside shop. 11 Uninterruptable Power Supply (1/2 cost) To protect computers from data loss due to power fluctuations. 12 100 MB tape drive (1/2 cost) (3 @ 250) To provide efficient method of hard -drive back up on computer. 13 -77- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WASTEWATER OPERATING NUMBER: (535) NO. 'PROJECT DESCRIPTION JLTS`TIFICATION 1 Hydraulically operated pump The present propane pump used for emergency by pass pumping is worn out. 2 Replace lift station in Pioneer II mobile home park The metal parts in this lift station are corroded to the point that routine operation and maintenance is dangerous. Safety and environmental hazards make this lift station completely inefficient. 3 Autostart diesel pump for lift station #1 (Nicole Lift station floods in five (5) minutes when power is Avenue) interrupted. Sewage flows to nearby lake causing environmental hazard. Pump will eliminate this hazard. 4 1/2 ton pickup truck with service body To replace vehicle 806 which is a 1979 Dodge with over 180,000 miles. 5 1//2 ton pickup truck with service body To replace vehicle 800 which is a 1986 Ford. Expected to have in excess of 100,000 miles when decommissioned. 6 Laboratory analytical balance Required to meet certification criteria by DER. FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WASTEWATER OPERATING NUMBER: (535) NO. _. PROJECT DESCRIPTION...JUSTIFICATION,; 7 Radio for 1/2 ton P.U. Radio for 1/2 ton pickup truck. Necessary for City communication network. 8 Spare 25 HP lift station pump Repair work on lift station pumps are currently made on emergency basis resulting in premium repair costs. By having a spare pump, time is allowed to shop for more reasonable repair costs. 9 Autodialer for lift station #10 Lift station #10 is located in a remote area and does not have emergency signaling. The autodialer will fill this deficiency. 10 Portable oxygen sensor To replace the existing 10 -year old sensor as recommended by manufacturer. Accuracy of the current sensor will become highly questionable which could endanger life. 11 1/2 ton pickup with utility body To replace vehicle 802 which is a 1988 Dodge for lift station maintenance through the City. 12 Medium duty tractor Tractor is used for mowing 160 acres of grass; disking 60 acres of pond bottoms and sludge fields. Tractor will then be 10 years old. -79- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993 - 1997 DEPARTMENT: WASTEWATER OPERATING NUMBER: (535) NO. PROJECT DESCRIPTION JCISTIFICAT14N 13 1 ton truck with service body and crane The Utilities Department currently does not have capabilities of lifting and hauling medium heavy equipment. Leasing is expensive and bucket tractors make some lifting very unsafe. 14 Rehab lift station #5 The lift station is part of the Prima Vista acquisition. Mechanical equipment is very old and parts are difficult to get because some have been discontinued. 15 Expand WWTP #2 to 3 MGD and reconfigure on-site Additional treatment capacity is needed because of ponds. commitments with development contractors. 16 Spray irrigation system coordination and permits Consulting engineering work related to effluent disposal. 17 South -to -west master force main To expand service to committed growth areas. 18 Debt service on sludge truck Final payment on sludge truck acquired in 1988. 19 Replacement autodialers Because of environmental operating condition replacement of these dialers will be needed at each lift station after 10 year operation. m CITY OF OCOEE FIVE YEAR PROJECTION FISCAL YEARS 1993-1997 CAPITAL IMPROVEMENT PREPARED BY: FINANCE DEPARTMENT; CITY OF OCOEE MAY 1992 PROGRAM MEMORANDUM TO: The Honorable Mayor and Board of City Commissioners FROM: Ellis Shapiro, City Manager DATE: May 21, 1992 RE: FIVE YEAR CAPITAL IMPROVEMENT PROGRAM Attached is the Capital Improvements Program for fiscal years 1992-1993 through 1996-1997. The Local Planning Agency has reviewed this along with the funding requirements, method of funding and proposed dates for purchase. Their recommendations as to priorities have been included on the individual items. The basic operating requirements of the departments were discussed with regard to work programs. While the major emphasis in any multi-year capital program is the planned expenditure of funds, the development of cash reserves is the foremost goal during the next fiscal year. These reserves will allow a scheduled capital replacement program as well as provide for payments of unplanned occurrences and for a stronger portfolio for future capital improvements. The Five -Year Capital Program itself is a plan for Capital Purchases (those items costing over $500), Capital Replacements and Capital Leases. It represents the projected needs from which a budget can be developed. It is a plan after all and will be constrained by the availability of funding. The greatest need during the next several years is the replacement of the City's aging fleet of vehicles and heavy equipment. Another large number of purchases shown in the program is computer equipment. However, except where repairs become too costly or replacement allows for enhanced or expanded work effort, computer equipment will not be bought until the computer master plan has been completed. This entails not only the use of microcomputers but also the expansion/replacement of the mainframe. Cost estimates in the attached Five -Year Program are based on 1992 dollars. Only where actual increases over the last several years are known and can be utilized to anticipate the future increases have such increases been included. Where costs for repairs or the cost for operating and maintaining have continued to escalate new equipment is recommended. For such new equipment warranties will be negotiated or purchased. City Hall furniture, fixtures and equipment will be moved out another year since construction will not be completed until the fourth quarter of Fy 1993. The companion document includes the specific department's justification for each request. These were reviewed as the initial ranking was developed. This summarizes the contents of the Five -Year Capital Improvement Program. Again, the main goal is to develop the necessary cash reserves first and replace the fleet second. Discussion and approval of this program has been placed on the agenda for ,Tune 2, 1992. ,, Respectfully Submitted, FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 CITY MANAGER (512) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 2 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH. Z. COST THRU 9/30 PROGRAM 92-3 93-4i 9I4-5 95.-6 96-'7 FIN.I 1 1 1 1 COMPUTER EQUIPMENT (R) 4,000 4,000 4,000 A 2 1 1 1 CITIZEN RELATIONS SOFTWARE 1,000 1,000 1,000 A 3 1 1 1 SOFTWARE INCLUDING UPGRADES 3,350 3,350 2,000 600 750 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 2 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL MPROVEMENT PROGRAM FISCAL YEARS 1993-1997 CITY CLERK DEPARTMENT (512.1) L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 3 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE5 EST:: -CASH, YEAR FY' FY FY FY FY METH. T Z` M COST THRU 9j30 PROGRAM 92-3 93-4 94-5 .j 95'-6 96-7 FIN. 1 1 1 1 PERSONAL COMPUTERS (3) 6,600 6,600 2,200 2,200 2,200 A 2 1 1 1 LASER PRINTER (R) 1,500 1,500 1,500 A 3 1 1 1 CREDENZAS (3) 1,500 1,500 500 500 500 A 4 1 1 1 SECRETARIAL CHAIRS (3) 900 900 300 300 300 A 5 1 1 1 DESKS/WORKSTATIONS (3) 1,500 1,500 500 500 500 A 6 1 2 2 SCANNER W/FEEDER & INTERFACE 2,000 2,000 2,000 A 7 1 1 1 CODIFICATION SUPPLEMENT 25,000 25,000 5,000 5,000 5,000 5,000 5,000 A L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 3 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 FINANCE DEPARTMENT (513) L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING LCOM=COMMISSION - 4 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C TOTAL COST NO P CM & O PROJECTFYI DESCRIPTION ESTIMATE EST CASH S YEAR FY FY FY FY METH. T Z M COST THRU 9/30 PROGRAM 92-3 93-4 94-5 95 6 96-7 FIN. 1 1 1 1 UPGRADES CURRENT NCR 13,000 13,000 6,000 7,000 A SYSTEM 2 0 0 0 0 ANNUAL SYSTEM 10,000 82,500 82,500 27,500 27,500 27,500 A DEBT PAYMENT 3 1 1 1 VALIDATOR/INSTALLED 2,500 2,500 2,500 A L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING LCOM=COMMISSION - 4 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PERSONNEL DEPARTMENT (513.3) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING LCOM=COMMISSION - 5 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C TOTAL COSI' NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH. T M COST THRU 9/30 PROGRAM 92-3 93-4 94-5 < 95 6 96-7 FIN.'` 1 1 3 3 POUCH LAMINATOR 500 500 500 A 2 1 1 1 WORDPERFECT NETWORK SOFTWARE 1,500 1,500 1,500 A 3 1 1 1 SOFTWARE UPGRADES 2,600 2,600 800 800 1,000 A 4 1 1 1 LATERAL FILE CABINET 1,170 1,170 580 590 600 A 5 1 2 2 TIME CLOCKS 12,600 12,600 12,600 A 6 1 1 1 PRINTER 1,800 1,800 1,800 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING LCOM=COMMISSION - 5 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER r J FIVE YEAR CAPITAL IMPROVEMENT PROGRAM r FISCAL YEARS 1993-1997 PLANNING DEPARTMENT (515) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION L - 6 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D E C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMAT EST CASH 5 YEAR FY YT FY FY FY METH.: T Z M COST.'. THRU 9/'3 0 - PROGRAM. 92-3 - 934 94-5 95-6 96-7 .FIN 1 1 3 3 VCR PLAYER/TV 800 800 800 A 2 1 2 2 MOBILE STAND -DEV. PLANS 630 630 630 A 3 1 2 2 DOCUMENT STORAGE 17,850 17,850 17,850 . A RETRIEVAL SYSTEM 4 1 2 2 MICRO -FICHE READER PRINTER 1,800 1,800 1,800 A 5 1 1 1 DESKTOP PUBLISHING SOFTWARE 1,845 1,845 1,845 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION L - 6 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 GENERAL GOVERNMENT (516) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 7 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C:: TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMAT$ EST CASH 5 YEAR FY FY FY FY FY METE.`> T Z. M COST THRU 9/30 PROGRAM 92-3 93-4 9i4.-5 95:-6 96-:? FIN.. 1 1 1 1 DESKS/WORKSTATIONS 4,850 4,850 4,850 D 2 1 1 1 OFFICE/SECRETARIAL CHAIRS (2) 950 950 950 D 3 1 1 1 CREDENZAS (2) 2,975 2,975 2,975 D 4 1 1 1 CONFERENCE TABLE AND CHAIRS 3,800 3,800 3,800 D 5 1 1 1 GUEST CHAIRS 1,950 1,950 1,950 D 6 1 1 1 BOOKCASES 1,175 1,175 1,175 D 7 1 3 3 TIME CLOCKS 12,600 12,600 12,600 D 8 1 1 1 DEVELOPMENT REVIEW WORK TABLE 500 500 500 D 9 1 1 1 AMERICAN AND CITY OF OCOEE 650 650 650 D FLAGS 10 1 1 1 1 t EXECUTIVE DESKS WITH CHAIRS 800 800 800 D FOR COMMISSION CHAMBERS (2) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 7 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 GENERAL GOVERNMENT (516) L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 8 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C TOTAL. COST.. NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY, METH. COST THRU 9/30 PROGRAM 92-3 93-4 94.- 95-6 96-7 FIN. 11 1 1 1 4 DRAWER FILING CABINETS FOR 1,500 1,500 1,500 D COMMISSION CHAMBERS (5) 12 1 1 1 RECEPTION CHAIRS (4) 1,000 1,000 1,000 D COMMISSION CHAMBERS 13 1 2 2 ARTWORK FOR COMMISSION 2,000 2,000 2,000 D CHAMBERS 14 1 1 1 EXECUTIVE CHAIRS FOR 5,000 5,000 5,000 D COMMISSION CHAMBERS 15 1 1 1 LATERAL FILING CABINETS (2) 1,300 1,300 1,300 D 16 1 1 1 CITY HALL 1,344,750 1,344,750 1344,750 D L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 8 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PUBLIC WORKS ADMINISTRATION (517) - 9 - D P C TOTAL EST.CAS HO COST <FY NO P M & PROJECT DESCRIPTION ESTIMATEI THRU 5 YEAR Fy FY FY FY METH. T Z M ;; COST 9%3a PROGRAM 92-3 93-4 9.4 5 95-6 96-7 F IN. 1 1 2 2 FAX Machine 1,000 1,000 A 2 1 2 2 Fleet Maintenance Computer 6,000 6,000 A Program 3 1 1 1 Software/P.P.T.D./STREETS 1,500 1,500 A 4 1 1 1 Color Monitor (R) 600 600 A 5 2 2 2 Feeder for Copy Machine 1,200 1,200 A 6 1 2 2 TV/VCR Combination 750 750 A 7 2 2 2 Wall Heat/Air Unit (3) 1,900 600 1,300 A 8 1 2 2 Expand Current Office Space 3,000 3,000 A 9 1 2 2 Software - St. Sign 500 500 A Maintenance DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 9 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 10 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D C P C TOTAL EST CASH COST NO P & O PROJECT DESCRIPTION ESTIMATE` THRU 5 YEAR FY FY FY FY FY METH .' T M Z M COST 9/30 PROGRAM 92-3:1193-4 94-5 95-6 96-7 1 1 1 2 Way Midland Radio 600 600 A 10 w/charger (2/3) 11 1 2 2 Cellular Phone 750 750 A 12 1 2 2 Copy Machine w/Feeder 3,200 3,200 A 13 2 2 2 Conference Table and Chairs 2,500 2,500 A 14 1 2 2 PC w/Printer & Work Station 4,000 4,000 4,000 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 10 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 ADMINISTRATIVE SERVICES (518) D TOTAL COST NO P cm :4 O PROJECT DESCRIPTION ESTIMATE`' EST CASH S YEAR FY FY FY FY FY METH.; T M CO3T THRII 9' 38 PROGRAM 92-3 93-4 9'4 5 95-6 96-7 SIN.: 1 0 0 0 0 COPIER DEBT SERVICE 28,000 28,000 7,000 7,000 7,000 7,000 A PAYMENT 2 1 1 1 COMPUTER SYSTEM/SOFTWARE 320,000 320,000 80,0000 80,0000 80,0000 80,0000 A PROGRAM INCLUDING UPGRADES 3 1 1 1 DESK/PC WORKSTATIONS (2) 2,500 2,500 1,000 1,500 A 4 1 1 1 PC WITH SOFTWARE (2) 9,200 9,200 4,000 5,200 A 5 1 1 1 5 DRAWER LATERAL FILING 2,800 2,800 800 2,000 A CABINETS (2) DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION -11- C. OTHER FEDERAL AID F. OTHER r FIVE YEAR CAPITAL E%IPROVEMENT PROGRAM r FISCAL YEARS 1993-1997 PAGE ONE OF THREE BUILDING MAINTENANCE (519) 12 No. D P T CM P & Z1.,:M C O PROJECT . DESCRIPTION TO TAL ESTIMATE COST EST,CASH THRU 9/30. COST .5.YEAR PROGRAM Fy 92-3 FY 93�q FY 94 5 FY R5-6 FY 96.7 METH. FIN. 1 2 2 2 COMMUNITY CENTER EXPANSION 40,500 40,500 40,500 A 2 1 2 2 5 HP GAS COMPRESSOR 800 gpp A 3 1 1 1 REMODEL KITCHEN AT COMMUNITY CENTER 2,100 800 1,300 A 4 1 1 1 REMODEL LADIES ROOM AT COMMUNITY CENTER 1,850 750 1,100 A 5 1 2 2 RESTROOM FACILITIES AT BOAT DOCK 25,000 25,000 25,000 A ` 6 1 1 1 TABLE STORAGE CARTS (3) 600 600 A 7 1 1 1 HEAVY DUTY FOLDING TABLES (5) 1,000 1,000 A 8 1 1 1 REMODEL MEN'S ROOM AT COMMUNITY CENTER 2,500 1,000 1,500 A 9 1 2 2 COMMERCIAL GRADE STOVE WITH MICROWAVE 2,500 2,500 A 10 1 2 2 COMMERCIAL GRADE REFRIGERATOR 2,500 2,500 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER 12 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE TWO OF THREE BUILDING MAINTENANCE (519) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 13 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C:: TOTAL. COST. NO P CM & O PROJECT DESCRIPTION ESTIMFYATES.YEAR EST CASH, FY FY FY FY; METH. T Z. M « _' COST THRU 9 30 PROGRAM 92-3 93-4; 94-5 95-6 96.7 FIN. 11 1 1 1 10" RADIAL ARM SAW 1,250 1,250 1,250 A 12 1 1 1 5 BLADE FANS W/LIGHTS FOR 1,250 1,250 A COMMUNITY CENTER (5) 13 1 1 1 BAR STOOLS FOR COMMUNITY 2,000 2,000 A CENTER (6) 14 1 1 1 4 SPEED BAND SAW 1,100 1,100 1,100 A 15 1 1 1 RESURFACE PARKING LOT AT 2,800 2,800 2,800 A COMMUNITY CENTER 16 1 1 1 POWER FRAMING NAILER 500 500 A 17 1 1 1 1/2 TON PICKUP W/UTILITY BODY 27,000 27,000 13,000 14,000 A (R)(2) 18 1 1 1 INSTITUTIONAL FLOOR POLISHER 950 950 A 19 1 1 1 PRESSURE WASHER W/WAND 2,500 2,500 A 20 1 1 1 WET/DRY VACUUM (3) 2,200 700 750 750 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 13 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER r FIVE YEAR CAPITAL IMPROVEMENT PROGRAM r FISCAL YEARS 1993-1997 BUILDING MAINTENANCE (519) rPAGE THREE OF THREE D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH.' 'j' K: COST THItU 9/30 PROGRAM 92-3 93-4 ! 94-5 95':-6 96-7 21 1 1 1 10" TABLE SAW 750 750 750 A 22 1 2 2 REPLACE TILE FLOOR IN MAIN 5,500 5,500 A ROOM AT COMMUNITY CENTER 23 1 2 2 ELECTRICAL CABLE INSTALLATION 6,500 6,500 D (CITY WIDE) 24 1 2 2 REPLACE WALL PHOTO AT 750 750 A COMMUNITY CENTER 25 1 2 2 SCAFFOLDING 2,000 2,000 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 14 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE ONE OF THREE LAW ENFORCEMENT (521) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 15 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P G TOTAL:COST NO P GM & O PROJECT DESCRIPTION ESTIMATE. EST CASH 5 YEAR FY FY FY FY .. FY METH,; T Z M COST THRU 9/30 PROGRAM 92-3 93-4.' 94 1 1 1 1 MARKED PATROL CARS 613,500 613,500 86,000 162,000 87,500 98,000 180,000 A 2 2 3 3 MOTORCYCLES (2) 14,000 14,000 14,000 A 3 1 1 1 MOBILE RADIO UNITS 46,400 46,400 5,100 4,500 18,800 8,400 9,600 A 4 1 2 2 SIRENS 1,500 1,500 1,500 A 5 1 1 1 CAGES 12,100 12,100 2,000 2,400 2,800 2,400 2,500 A 6 1 1 1 LIGHT BARS 27,250 27,250 3,600 8,100 6,300 4,000 5,250 A 7 1 1 1 PORTABLE RADIOS 27,200 27,200 5,000 4,500 4,500 7,200 6,000 A 8 1 1 1 FIREARMS 14,200 14,200 3,700 2,000 2,000 2,500 4,000 A 9 1 1 1 BULLET PROOF VESTS 13,250 13,250 2,450 2,800 3,600 4,400 A 10 1 1 1 RECORDS MANAGEMENT COMPUTER & 41500 4,500 4,500 A SOFTWARE DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 15 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER PAGE TWO OF THREE FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 LAW ENFORCEMENT (521) D P -16- C: TOTAL COST NO P CM: & O PROJECT DESCRIPTION ESTIMATE EST CASH S. YEAR FY FY FY FY FY` META. T Z M G03TPROGRAM THRU 9 30 92-394-5 95-6FIN. >: 11 2 2 2 K-9 SCHOOL 1,500 1,500 1,500 A 12 1 1 1 RADAR 11,000 11,000 2,200 2,000 2,000 2,400 2,400 A 13 1 2 2 FAX MACHINE 1,000 1,000 1,000 A 14 2 2 2 800 MHz RADIO SYSTEM 250,000 250,000 250,000 A 15 2 2 2 CAP CRIMINAL PROFILING 3,000 3,000 3,000 A 16 1 2 2 TARGET RANGER 3,000 3,000 3,000 A 17 2 2 2 MOTOROLA CONVERTA COM 2,300 2,300 525 525 600 650 A 18 1 2 2 VEHICLE K-9 UNIT 12,500 12,500 12,500 A 19 1 1 1 PRINTER SOUND SHIELD 600 600 600 A ll0 1 1 1 LANGUAGE LINE 1,300 1,300 1,300 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER -16- FIVE YEAR CAPITAL JM1?ROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE THREE OF THREE LAW ENFORCEMENT (521) NO D P T CM P & Z>. C O M PROJECT DESCRIPTION:ESTIMAT$ TOTAL COST EST CASH THRU 9/30 COST 5 YEAR PROGRAM FYFY 92-3 93-4' FY 94 5 FY 95-6 FY 967 METH. FIN. 21 1 2 2 PORTABLE COMPUTER 1,000 1,000 1,000 A 22 1 2 2 MICROFILM MACHINE 3,000 3,000 3,000 A 23 0 0 0 0 RADIO PAYMENT 14,400 14,400 14,400 A 24 0 0 0 0 LAW ENFORCEMENT TELEVISION NETWORK 24,000 24,000 4,800 4,800 4,800 4,800 4,800 A 25 2 2 2 PEDESTAL FINGER PRINT UNIT 230 230 230 A 26 1 1 1 LANGUAGE LINE 1,300 1,300 1,300 A 17 DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 17 - FIVE YEAR CAPITAL EMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 FIRE DEPARTMENT (522) NO ID: P T' CM P & Z, C O M PROJECT DESCRIPTION TOTAL ESTIMATB COST EST CASH THRU 9/30 COST 5 YEAR PROGRAM FY 92-3 FY `93-4 FY 94-5 FY 95-6 FY' 96-7 METH.:,: FIN.: 1 1 1 1 4 X 2 VEHICLE 13,000 13,000 13,000 A 2 1 2 2 MISC. VEHICLES (2) 24,000 24,000 24,000 B 3 1 1 1 250 GPM MINI -PUMPER (2) 237,000 116,000 17,000 17,000 17,000 17,000 48,000 B 4 1 1 1 MOBILE RADIOS (9) 7,200 7,200 3,200 1,600 800 1,600 B 5 1 1 1 800 MOBILE RADIO 1,200 1,200 1,200 B 6 1 2 2 DIGITAL PAGERS (3) 700 700 700 B 7 1 1 1 1000 GPM NOZZLE 800 800 800 A 8 1 1 1 SMOKE FANS 6,000 6,000 1,200 2,400 1,200 1,200 B 9 1 1 1 FLOW METER (2) 600 600 600 A 10 1 1 1 TABLE & CHAIRS (STATION #2) 800 800 800 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE -BONDS P&Z=PLANNING & ZONING B. IMPACT FEE E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER F. OTHER - 18 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 FIRE DEPARTMENT (522) -19- D P C TOTAL COST NO F CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH.' T Z M COST THRU 9/30 PROGRAM 92-3 93-4 9!4-5 95! 6 96 -►7 FIN.;. 11 1 2 2 LIGHT BAR & SIRENS (2) 5,000 5,000 5,000 B 12 1 1 1 PERSONAL COMPUTER (2) 6,000 6,000 3,000 3,000 B 13 1 2 2 MOBILE TELEPHONE 800 800 400 400 A 14 1 1 1 PORTABLE RADIOS (10) 10,000 10,000 2,000 2,000 4,000 2,000 A/B 15 1 2 2 FIRE INSPECTION SOFTWARE 1,500 1,500 1,500 A 16 1 2 2 EXERCISE EQUIPMENT 2,400 2,400 1,800 600 A 17 1 1 1 AIR BAGS 3,000 3,000 3,000 A 18 1 1 1 HAZMAT SUITS 1,500 1,500 1,500 A 19 1 1 1 FIRE STATION #4 448,000 448,000 448,000 B 20 1 1 1 FIRE PUMPER (3) 434,400 434,400 80,000 118,600 117,900 117,900 B DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEE E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER -19- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 FIRE DEPARTMENT (522) NO D P T CM P & Z C O M PROJECT DESCRIPTION TOTAL ESTIMATE CO3T EST CASH THRII 9 30 >:. COST 5 YEAR - PROGRAM , FY 92-3 .: FY 934 FY 94-5 FY 95'-6 FY METH. 21 1 1 1 ENGINE 11 (REBUILDING) 150,000 122,000 50,000 24,000 24,000 24,000 A 22 1 1 1 4" FIRE HOSE (4000') 24,000 24,000 12,000 6,000 6,000 B/A 23 1 1 1 COMPUTER DISPATCH 60,000 50,000 10,000 10,000 10,000 10,000 10,000 B 24 1 1 1 HIGH COMBAT 1 3/4" X 1500' 6,000 6,000 2,400 1,200 2,400 B 25 1 1 1 MSA AIR PACKS (22) 43,200 43,200 18,000 10,800 3,600 10,800 B 26 1 1 1 MSA AIR BOTTLES (22) 8,400 8,400 3,500 2,100 700 2,100 B 27 1 2 2 TASK FORCE NOZZLES 12,000 12,000 6,000 3,000 3,000 B 28 1 1 1 FIRE STATION #3 600,000 600,000 600,000 B 29 1 1 1 RESCUE TRUCK (1 TON) (2) 182,000 77,000 16,000 31,000 30,000 B 30 1 1 1 1 3/4" FIRE HOSE 5,600 5,600 2,000 1,200 1,200 1,200 B/A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEE E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER -20- FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 FIRE DEPARTMENT (522) NO D P T CM P & Z C O M PROJECT DESCRIPTION TOTAL ESTIMATE COST EST CASH THRU 9/30 COST 5 YEAR PROGRAM FY 92-3 FY 93-4` FY 94-5 FY 95-6 FY. 96-7 METH.`, 31 1 2 2 800 RADIO SYSTEM 320,000 250,000 100,000 75,000 75,000 B 32 1 2 2 EMS EQUIPMENT 40,000 40,000 10,000 10,000 10,000 10,000 B/A 33 1 2 2 PORTABLE AIR REFILL 40,000 40,000 20,000 20,000 B 34 1 1 1 ADDITION TO STATION #1 96,000 96,000 96,000 B 35 1 2 2 90' AERIAL TRUCK (LP) 630,000 109,000 109,000 B 36 1 2 2 NEW TRUCKS/NEW STATIONS 40,000 40,000 10,000 10,000 10,000 10,000 B 37 1 1 1 LAND PURCHASE (STATION #4) 100,000 100,000 100,000 B 38 1 1 1 ARCHITECT DESIGN (ST #3 &4) 60,000 60,000 60,000 B 39 1 1 1 LAND PAYMENT (REC DEPT/ST #3) 75,000 60,000 20,000 201000 20,000 B 40 1 2 2 REBUILD ENGINE #1 150,000 96,000 50,000 24,000 24,000 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 21 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEE E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL EMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 FIRE DEPARTMENT (522) D P' C TOTAL EST CASH COST FY FY FY FY FY METH, NO P CM & O PROJECT DESCRIPTION ESTIMATE 5 YEAR T �> M COST THRU 9/30 PROGRAM 92-3 91.---4.: 94 5 95-6 96-7 i: FINi 41 1 1 PROTECTIVE CLOTHING 25,200 25,200 12,600 12,600 B DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 22 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEE E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PROTECTIVE INSPECTIONS (524) NOP D CM P' & C PROJECT DESCRIPTIOFY TOTAL EST CASH. COST FY FY FYO FY METH. T Z. M_ COST THRII 9.30 1' PROGRAM 92-3 93-4 94-51 95-6 96­7:FIN. 1 1 1 1 PERSONAL COMPUTER 2,200 2,200 2,200 A 2 1 1 1 1/2 TON PICK-UP (R) 11,000 11,000 11,000 A 3 1 1 1 1/2 TON PICK-UP R / ( ) 10,500 10,500 10,500 p, 4 1 1 1 AUTO 4 DR (R) 10,000 10,000 10,000 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 23 - r FIVE YEAR CAPITAL IlUPROVEMENT PROGRAM r FISCAL YEARS 1993-1997 P.P.T.D. DEPARTMENT (541) PAGE ONE OF 13 P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR11 FY FY FY FY FY METH. T 2 M COST THRU 9 30 _PROGRAM1. 92'-3 :93-4 914 96 :7 FIN. 1 1 1 1 MARK III LAKE AID SYSTEMS 44,000 44,000 22,000 22,000 A 2 1 1 1 WELDER W/GENERATOR 3,000 3,000 3,000 A 3 1 2 2 TOW LAWNAIRE AERATOR 2,800 2,800 r 2 800 r A 4 1 1 1 TWO 1/2 TON DUMP TRUCKS (R) 51,000 51,000 25,000 26,000 A 5 1 1 1 16' X 18' EQUIPMENT TRAILER 10,000 10,000 3,000 3,000 4,000 A 6 1 1 1 LESCO AERATOR 1,200 1,200 1,200 A 7 1 2 2 LESCO REMOVATOR-20 3,000 3,000 3,000 A 8 1 1 1 ECHO 3500 CHAIN SAWS (R)(12) 7,200 7,200 1,800 1,800 r 1 800 r 1 ,800 A 9 1 1 1 CONCRETE SAW (2) (R) 1,450 1,450 700 750 A 10 1 1 1 HEAT/AIR CONDITIONER SIGN 1,000 1,000 1,000 A SHOP DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 24 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE TWO OF 13 P.P.T.D. DEPARTMENT (541) - 25 - D P C TOTAL COST NO P CM '&: O PROJECT DESCRIPTION ESTIMATE EST CASH 5 y Fy Fy FY FY FY METH.'. T Z M COST THRQ 9/30 PROGRAM 9Z-3 93-4< 9;4-5 95-6 96-7 FIN.;.. 11 1 2 2 LIGHTING AT PUBLIC WORKS 2,500 2,500 2,500 A PARKING AREA (SEWER PLANT) 12 1 2 2 SIGN SYSTEM III MACHINE 8,000 8,000 8,000 A 13 1 1 1 TORO GROUNDMASTER MOWER 20,000 20,000 6,500 7,000 6,500 A (3)(N)(R) 14 1 1 1 1/2 TON PICKUPS (6) (R) 30,000 30,000 15,000 15,000 A (USED) 15 1 1 1 FORD TRACTOR 2/20 (2)(R) 36,000 36,000 18,000 18,000 A 16 1 2 2 WALK ALONG TRENCHER 8,000 8,000 8,000 A 17 1 2 2 WELCOME TO OCOEE SIGNS (5) 7,500 7,500 3,000 4,500 A 18 1 1 1 MIDLAND 2 -WAY RADIO INSTALLED 1,600 1,600 1,600 (2)(R) A 19 1 1 1 HONDA EDGER (5)(R) 3,300 3,300 1,200 1,400 700 A 20 1 1 1 ECHO 2501 WEED EATERS (24)(R) 91600 9,600 3,200 2,000 2,000 2,400 A DPT=DEPARTMENT CM=CITY MANAGER METHOD OF FINANCING P&Z=PLANNING & ZONING A. CURRENT REVENUE D. REVENUE BONDS COM=COMMISSION B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER - 25 - r FIVE YEAR CAPITAL IMPROVEMENT PROGRAM r FISCAL YEARS 1993-1997 PAGE THREE OF 13 P.P.T.D. DEPARTMENT (541) D P C: TOTAL COST NO P CM' & O PROJECT DESCRIPTION ESTIMATE EST. CASH 5 YEAR FY FY FY FY FY; METH.: T Z M COST THRU 9./30 PROGRAM 92-3 93-4 94-5 95.-6 96 -►7 FIN.`:; 21 1 1 1 CHRISTMAS LIGHTS (98)(R)(A) 25,000 25,000 5,000 5,000 15,000 A 22 1 1 1 BACK PACK BLOWERS (8)(R) 2,800 2,800 1,400 1,400 A 23 1 2 2 EASY RIDER ATHLETIC FIELD 15,500 15,500 7,500 8,000 A CONDITIONER 24 1 1 1 POWER EDGER 700 700 700 A 25 1 1 1 18" GAS POWERED CHAIN SAW 1,200 1,200 550 650 A 26 1 2 2 SOD CUTTER 3,000 3,000 3,000 A 27 1 2 2 REFLECTOMETER 3,500 3,500 3,500 A 28 1 1 1 PLATE COMPACTOR 2,000 2,000 2,000 A 29 1 1 1 JOHN DEERE LOADER 75,000 75,000 75,000 A L30 1 2 1 2 3 WHEELED SWEEPER (LP)(R) 64,000 64,000 16,000 16,000 16,000 16,000 A DPT=DEPARTMENT CM=CITY MANAGER METHOD OF FINANCING P&Z=PLANNING & ZONING A. CURRENT REVENUE D. REVENUE BONDS COM=COMMISSION B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER - 26 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE FOUR OF 13 P.P.T.D. DEPARTMENT (541) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION XXL' METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P C TOTAL COSZR NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR py FY FY FY FY METH.:' T Z M COST THRO 9/30 PROGRAM 92-3 93-4 94 5 95.-6 96..-7 FIN... 31 1 1 1 200 GAL. SPRAYER 11,000 11,000 5,500 5,500 A 32 1 1 1 SPRINKLER SYSTEM (CITY WIDE) 5,000 5,000 5,000 A 33 1 2 2 ROAD STRIPING MACHINE 8,000 8,000 8,000 A ***PAVING PROGRAM*** 34 1 1 1 LYLE STREET FROM FRANKLIN TO 175,000 175,000 175,000 B TAYLOR 35 1 1 1 ORLANDO AVE. FROM BLUFORD TO 40,000 40,000 40,000 B CITY LIMITS NEAR CLARK RD. 36 11 1 CUMBERLAND AVENUE FROM SILVER 50,000 F 50,000 F50,000 -T B STAR RD. TO DEAD END DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION XXL' METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE FIVE OF 13 P.P.T.D. DEPARTMENT (541) NO D P T CM P & Z_ C:::: O M PROJECT DESCRIPTION TOTAL ESTIMATE COST EST CASH THRII 9/30 COST 5 YEAR PROGRAM FY 92-,3 FY 93-4' FY 94 5 FY 95-6 FY 96-7 METH • FIN.;; **INTERSECTION IMPROVEMENTS** 37 1 1 1 BLUFORD & ORLANDO INCLUDING DRAINAGE AND SIGNALIZATION 225,000 225,000 225,000 D,E 38 1 1 1 INTERSECTION IMPROVEMENTS KISSIMMEE & STORY INCLUDING DRAINAGE/SIGNALIZATION 800,000 800,000 800,000 D, E ***PARKING AREAS*** 39 1 1 1 PARKING AREA AT VIGNETTI PARK 5,500 5,500 5,500 B 40 1 1 1 PARKING AREA AT CENTRAL PARK 3,000 3,000 3,000 B 41 1 1 1 PARKING AREA AT PARKSIDE PARK 20,000 20,000 20,000 B ***SPRINKLER SYSTEM*** 42 1 1 1 SPRINKLER SYSTEM AT TIGER MINOR PARK 4,200 4,200 4,200 B 43 1 1 1 SPRINKLER SYSTEM AT PARKSIDE PARK 4,200 4,200 4,200 B DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 28 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER PAGE SIX OF 13 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 P.P.T.D. DEPARTMENT (541) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION L - 29 - A. B. C. METHOD OF CURRENT REVENUE IMPACT FEES OTHER FEDERAL AID FINANCING D. REVENUE BONDS E. STATE AID F. OTHER D Pi C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH.'. T Z M .:': COST THRYI 9/30 PROGRAM 92-3 >93-4 9:4-5 9Si-6. 96-7 ***LANDSCAPING*** 44 1 1 1 SILVER GLEN PARK LANDSCAPING 500 500 500 B 45 1 2 2 GAZEBO LANDSCAPING 1,000 1,000 1,000 A 46 1 1 1 YOUTH CENTER PARK LANDSCAPING 3,500 3,500 3,500 B 47 1 1 1 RUSSELL DRIVE PARK 500 500 500 A LANDSCAPING 48 1 1 1 BULLDOG FOOTBALL FIELD 500 500 500 B LANDSCAPING 49 1 1 1 LITTLE LEAGUE FIELD 500 500 500 B LANDSCAPING 50 1 1 1 MAJOR LEAGUE FIELD 500 500 500 B LANDSCAPING 51 1 1 1 SORENSON FIELD LANDSCAPING 500 500 500 B 52 1 1 1 VIGNETTI FIELD LANDSCAPING 500 500 500 B DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION L - 29 - A. B. C. METHOD OF CURRENT REVENUE IMPACT FEES OTHER FEDERAL AID FINANCING D. REVENUE BONDS E. STATE AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE SEVEN OF 13 P.P.T.D. DEPARTMENT (541) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 30 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D T' P z C M - TOTAL COST ESTCASH THRU 9/30 COST - PROGRAM FY 92-3 FY 93-4 FY 94-5 FY 95-6 FY 96-7 METH .> FIN..>; 53 1 2 2 TIGER MINOR PARK LANDSCAPING 7,000 7,000 7,000 B 54 1 1 1 PARKSIDE PARK LANDSCAPING 8,000 8,000 8,000 B ***SIDEWALKS*** 55 1 1 1 CRYSTAL DRIVE SIDEWALK 4,600 4,600 4,600 A 56 1 1 1 MABEL STREET SIDEWALK 2,800 2,800 2,800 A 57 1 1 1 SIDEWALK IMPROVEMENT PROJECT URSULA STREET 3,900 3,900 3,900 A 58 1 1 1 EAST LAKESHORE FROM ORLANDO AVE TO OLD SIDEWALK 7,500 7,500 7,500 A 59 1 1 1 SPRING LAKE CIRCLE SIDEWALK 8,500 8,500 8,500 A 60 1 1 1 MAUREEN AVENUE SIDEWALK 10,500 10,500 10,500 A 61 1 1 1 SAL STREET SIDEWALK 1,000 1,000 1,000 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 30 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE EIGHT OF 13 P.P.T.D. DEPARTMENT (541) — 31 — D P C TOTAL COST' NO P CM & O PROJECT DESCRIPTION ESTIMATE: EST CASH 5 YEAR FY FY FY FY. FY METH. T' Z M COST THRQ 9 /30 PROGRAM 92-3 93-4'' 94-5 . 95-6 96 —7 FIN. 62 1 1 1 DOREEN AVENUE SIDEWALK 9,400 9,400 9,400 A 63 1 1 1 PERCE AVENUE SIDEWALK 7,200 7,200 7,200 A 64 1 1 1 OAKLAND AVENUE FROM BLUFORD 5,500 5,500 5,500 A TO RAILROAD SIDEWALK 65 1 1 1 FRANKLIN FROM TAYLOR SIDEWALK 10,000 10,000 10,000 A 66 1 1 1 OHIO STREET FROM BAY TO 7,000 7,000 7,000 A BLUFORD AVENUE SIDEWALK 67 1 1 1 CUMBERLAND AVENUE FROM OHIO 12,500 12,500 121500 A TO FRANKLIN SIDEWALK 68 1 1 1 CHARLES STREET FROM LAKEWOOD 2,000 2,000 21000 A TO LYMAN SIDEWALK 69 1 1 1 SECURITY CIRCLE FROM LAKEWOOD 9,500 9,500 9,500 A AVENUE TO END SIDEWALK 70 1 1 1 ALASKA DRIVE FROM STARKE LAKE 3,000 3,000 3,000 A CIRCLE SIDEWALK 71 1 1 1 1 HAWAII DRIVE FROM STARKE LAKE 3,000 3,000 3,000 A CIRCLE SIDEWALK DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION Co OTHER FEDERAL AID F. OTHER — 31 — FIVE YEAR CAPITAL EMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE NINE OF 13 P.P.T.D. DEPARTMENT (541) L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 32 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D; P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FYFY-FY FY METE. T' M COST TV 9/30 PROGRAM ; 92-3 93-4' 94 5 95-6 96-7 72 1 1 1 HILL AVENUE FROM SILVER STAR 2,500 2,500 2,500 A ROAD TO CENTER ST. SIDEWALK 73 1 1 1 CENTER STREET FROMHILL AVENUE 2,200 2,200 2,500 A TO ORANGE AVENUE SIDEWALK 74 1 1 1 OCOEE HILLS RD FROM SILVER 20,000 20,000 20,000 A STAR RD TO FLEWELLING AVE SIDEWALK 75 1 1 1 APRICOT DRIVE FROM 703 17,000 17,000 17,000 A APRICOT DRIVE TO OCOEE HILLS ROAD SIDEWALK 76 1 1 1 RUSSELL DRIVE FROM FLEWELLING 9,000 9,000 9,000 A TO JAMELA SIDEWALK 77 1 1 1 LYMAN STREET FROM LAKEWOOD TO 11,500 11,500 11,500 A REWIS SIDEWALK 78 1 1 1 REBA AVENUE FROM FLEWELLING 5,700 5,700 5,700 A AVENUE TO PINEWOOD AVENUE SIDEWALK ***RESURFACING PROGRAM*** 79 1 1 1 REBA AVENUE TO FLEWELLING 4,000 4,000 4,000 A RESURFACING 80 1 1 1 SANDY BEACH/RUSSELL DRIVE 2,000 2,000 2,000 RESURFACING A L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 32 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE TEN OF 13 P.P.T.D. DEPARTMENT (541) - 33 - D: P C TOTAL COST NO P CM & O PRaJECT DESCRIPTION ESTIMATE EST: CASH 5 YEAR FY FY FY FY FY METH. T Z M COST THRII 9/3,0 - PROGRAM 92-3 93-4 > 94 5 95-6 96-7 FIN. <_ 81 1 1 1 SPRING CREEK/HYLAND TO WILLOW 5,900 5,900 5,900 A RESURFACING 82 1 1 1 CARDINAL STREET RESURFACING 4,000 4,000 4,000 A 83 1 1 1 JAY STREET RESURFACING 4,000 4,000 4,000 A 84 1 1 1 HYLAND SPRINGS FROM RUSSELL 2,900 2,900 2,900 A TO SPRING CREEK RESURFACING 85 1 1 1 MAUREEN FROM MONA AVENUE TO 3,100 3,100 3,100 A LADY AVENUE RESURFACING 86 1 1 1 GENEVA FROM BLUFORD AVENUE TO 9,500 9,500 9,500 A CEMETERY RESURFACING 87 1 1 1 KIMBERLY AND SNOWDEN 7,400 7,400 7,400 A RESURFACING 88 1 1 1 SEVENTH AVENUE RESURFACING 1,600 1,600 1,600 A 89 1 1 1 LAKEWOOD FROM 7TH AVENUE TO 1,600 1,600 1,600 A DELAWARE RESURFACING 90 1 1 1 DELAWARE STREET FROM LAKEWOOD 2,000 2,000 2,000 A TO BLUFORD RESURFACING DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 33 - FIVE YEAR CAPITAL EMIPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE ELEVEN OF 13 P.P.T.D. DEPARTMENT (541) DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 34 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D: P C _ TOTAL COST NO P CM' & O PROJECT DESCRIPTION ESTIMATE EST; CASH 5 YEAR FY FY FY FY FY METH. T' Z M COST THRU 9/30. PROGRAM 92-3 93-41 94 5.`;: 95=6 96-7 91 1 1 1 LAKESHORE DRIVE FROM 3,200 3,200 3,200 A LAFAYETTE TO DEAD END RESURFACING 92 1 1 1 OAKLAND AVENUE FROM BLUFORD 4,100 4,100 4,100 A TO TAYLOR RESURFACING 93 1 1 1 SECURITY CIRCLE RESURFACING 5,600 5,600 5,600 A 94 1 1 1 MOBILE LANE FROM LAKEWOOD TO 6,100 6,100 6,100 A CLAY ROAD RESURFACING 95 1 1 1 CHRISTINE FROM REWIS TO MAC 2,200 2,200 2,200 A STREET RESURFACING 96 1 1 1 HILL AVENUE FROM SILVER STAR 5,000 5,000 5,000 A TO FLEWELLING RESURFACING 97 1 1 1 WEST AVENUE FROM SILVER STAR 3,400 3,400 3,400 A TO REWIS ST RESURFACING 98 1 1 1 CUMBERLAND AVENUE FROM FLORAL 2,000 2,000 2,000 A STREET TO OHIO STREET RESURFACING 99 1 1 1 FRANKLIN FROM TAYLOR TO 8,100 8,100 8,100 A BLUFORD AVENUE RESURFACING 100 1 1 1 MELVA AVENUE FROM REWIS TO 2,300 2,300 2,300 A MAC STREET RESURFACING DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 34 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL EUPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE TWELVE OF 13 P.P.T.D. DEPARTMENT (541) w D P CTOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE. EST CASH 5 YEAR FY FY FY F Y FY METH. T Z M CO3T THRII 9/30 PROGRAM 92-3 93-4: 94-5 95:-6 96-7 FIN.:.: 10 1 1 1 1 NOELWOOD COURT FROM FOXFIRE 4,000 4,000 4,000 A TO CUL-DE-SAC RESURFACING 102 1 1 1 KINDLING COURT FROM FOXFIRE 4,000 4,000 4,000 A CUL-DE-SAC RESURFACING 103 1 1 1 PICWOOD COURT FROM FOXFIRE TO 3,800 3,800 3,800 A CUL-DE-SAC RESURFACING 104 1 1 1 CATWOOD AVENUE FROM STARFIRE 2,900 2,900 2,900 A TO FOXFIRE RESURFACING 105 1 1 1 STARFIRE LANE FROM OWLTREE 3,700 3,700 3,700 A WAY TO CATWOOD RESURFACING 106 1 1 1 OWLTREE WAY FROM FOXFIRE TO 2,700 2,700 2,700 A STARFIRE RESURFACING 107 1 1 1 FOXFIRE DRIVE FROM WURST TO 5,300 5,300 5,300 A OWLTREE WAY RESURFACING 108 1 1 1 KIMBALL DRIVE FROM RUSSELL TO 8,600 8,600 8,600 A WURST RESURFACING 109 1 1 1 OHIO FROM KISSIMMEE TO 4,400 4,400 4,400 A BLUFORD AVENUE RESURFACING 110 1 1 1 TANGERINE CIRCLE FROM CATWOOD 2,400 2,400 2,400 A TO CUL-DE-SAC RESURFACING DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER w PAGE THIRTEEN OF THIRTEEN FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 P.P.T.D. DEPARTMENT (541) M D P C TOTAL.COST NO P' CM & :.O PROJECT DESCRIPTION ESTIMATE' EST CASH S YEAR FY FY FY FY FY' META. T Z M -' COST THRU 9/30 PROGRAM 92-3 93-4 94-5 111 1 1 1 NORTHERN DURANGO FROM CATWOOD 9,600 9,600 9,600 A TO CUL-DE-SAC RESURFACING 112 1 1 1 LITTLE SPRING HILL FROM WURST 11,000 11,000 11,000 A TO NORTHERN DURANGO RESURFACING DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER M FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 MAINTENANCE GARAGE (549) PAGE ONE OF THREE NO D P T CM. P & Z C O M PROJECT DESCRIPTION TOTAL,COST ESTIMATE COST EST CASH THRU 9/30 5 YEAR PROGRAM FY 92-3 FY 93-4' FY 94-5 FY 95-6 FY 96-7 METH. FIN.:: 1 1 2 2 PORTABLE ELECTRIC WELDER 3,400 3,400 3,400 A 2 1 1 1 OVERHEAD GARAGE DOORS W/OPENERS 2,000 2,000 2,000 A 3 1 2 2 HYDRAULIC LIFT INSTALLED 12,000 12,000 12,000 A 4 1 1 1 REWIND ASSEMBLY 1,250 1,250 1,250 A 5 1 1 1 22 TON FLOOR JACK 850 850 850 A 6 1 1 1 TRANSMISSION JACK FOR LARGE VEHICLES (HEAVY DUTY) 1,000 1,000 1,000 A 7 1 1 1 1" DRIVE SOCKET SET 750 750 750 A 8 1 1 1 OPEN END/BOX END WRENCH SETS (2) 1,000 1,000 1,000 A 9 1 1 1 3/4" AIR GUN IMPACT WRENCH 700 700 700 A 10 1 2 2 AIR COMPRESSOR 15 TO 20 HP 10,000 10,000 10,000 A L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 37 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 MAINTENANCE GARAGE (549) PAGE TWO OF THREE 38 D P C TOTAL COST:FY NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FYI METH.. T' Z M COST THRU 9/30 PROGRAM 92 3 93-4 94-5 95-6 11 1 1 1 DRILL PRESS 1,000 1,000 1,000 A 12 1j 1 1 I TRANSMISSION JACK FOR SMALL 800 800 800 A VEHICLES 13 1 1 1 2-1/2 TON FLOOR JACK 325 325 325 A 14 1 1 1 ICE MACHINE (2) 5,400 5,400 2,700 2,700 A 15 1 1 1 UNDERGROUND STORAGE TANKS (2) 85,000 85,000 85,000 A 16 1 1 1 1/2" AIR GUN IMPACT WRENCH 875 875 400 475 A 17 1 1 1 JET RESNOR HEARTER/GAS/WITH 4,000 4,000 2,000 2,000 A BLOWER 18 1 1 1 3/4 TON PICKUP WITH UTILITY 16,000 16,000 16,000 A BED 19 1 1 1 HYDRAULIC PORTABLE HOIST 500 500 500 A 20 1 1 1 10 HP PORTABLE AIR COMPRESSOR 2,500 2,500 2,500 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER 38 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 MAINTENANCE GARAGE (549) PAGE THREE OF THREE - 39 - D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH T Z M COST THRII 9/30 PROGRAM 92-3 93-4 94-5 95,-6 96-7 FIN. 21 1 1 1 INLINE AIR DRYER SYSTEM FOR 750 750 750 A AIR COMPRESSOR 22 1 1 1 SMALL ENGINE STAND 500 500 500 A 23 1 1 1 LARGE ENGINE STAND 800 800 800 A c DPT -=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 39 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE ONE OF TWO RECREATION (572) L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION !lE,tlm METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D p C - TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH . T95-6 Z M COST THRII 9/30 - PROGRAM 92-3 93-4 94-5 96-7 FIN.:;: 1 1 1 1 1/2 TON LONGBED PICKUP 14,000 14,000 14,000 A 2 1 1 1 RESURFACE TENNIS COURTS 2@ 9,300 9,300 9,300 A VIGNETTI; 2 @ YOUTH CTR; 2 @ MINOR PARK 3 1 2 2 REROUTE EMERGENCY ENTRY TO 12,000 12,000 12,000 A BULLDOG FIELD 4 1 1 1 NEW ENTRANCE TO SORENSON 19,000 19,000 19,000 B FIELD FROM ADAIR 5 1 2 2 RENOVATION OF BUILDING IN 19,000 19,000 19,000 A,F VIGNETTI PARK 6 1 1 1 RENOVATION/EXPANSION OF 28,000 28,000 28,000 A,F RECREATION ACTIVITY CENTER 7 1 2 2 SORENSON FIELD CONCESSION 32,000 32,000 32,000 ASB STAND W/MTG ROOM FACILITIES 8 1 2 2 PARK PAVILIONS & TABLES 14,800 14,800 6,200 8,600 A,B 9 1 2 2 DRINKING FOUNTAINS (PARKS) 6,400 6,400 3,200 3,200 B 10 1 1 1 PARK BENCHES 3,000 3,000 3,000 A,B L DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION !lE,tlm METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER r FIVE YEAR CAPITAL EMPROVEM[ENT PROGRAM r FISCAL YEARS 1993-1997 PAGE TWO OF TWO RECREATION (572) 41 D P C TOTAL COST NO P CMi & O' PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY' METH.: T Z_ mCOST THRU 9/30 PROGRAM 92-3 93-4 94-5 95-6 96;7 11 1 1 1 PLAYGROUND AND EXERCISE 36,000 36,000 36,000 BSC EQUIPMENT FOR VIGNETTI, PARKSIDE AND MINOR PARKS 12 1 1 1 SIDEWALKS AND PATHWAYS IN 18,000 18,000 18,000 BSC PARKS - VIGNETTI, MINOR, PARKISDE AND CENTRAL 13 1 2 2 FISHING DOCK IN SILVER GLEN 4,600 4,600 4,600 B 14 1 2 2 LIGHTED TENNIS COURTS 27,000 27,000 27,000 B,C (PARKSIDE) 15 1 1 1 PURCHASE PROPERTY ADJOINING 10,000 10,000 10,000 A SORENSON FIELD 16 1 1 1 8 LANE TRACK AND SOCCER FIELD 53,000 53,000 53,000 B,C 17 1 2 2 GYMNASIUM 91,000 91,000 91,000 B 18 1 2 2 SOD FOR MAJOR/MINOR FIELDS 4,000 4,000 4,000 ASB DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER 41 FIVE YEAR CAPITAL BIPROVEMENT PROGRAM FISCAL YEARS 1993-1997 PAGE ONE OF TWO STORMWATER DRAINAGE (538) 140 NO D P T' CM! P & Z C O M PROJECT DESCRIPTION TOTAL ESTIMATE COST EST CASH THRU 9/30 COST 5 YEAR PROGRAM FY 92-3 Py 93-4 9'4-5 FY 95.-6 FY 96-7 METH FIN.< 1 1 1 1 TRASH PUMP (R) 4,000 4,000 4,000 A 2 1 1 1 1/2 TON PICKUP 4 X 4 (1) 15,000 15,000 15,000 A 3 1 1 1 HYDRAULIC EXCAVATOR - GRADALL 150,000 150,000 1501000 A 4 1 2 2 VACTOR TRUCK 160,000 160,000 160,000 A 5 1 1 1 TORO RIDING MOWERS (6) 18,000 18,000 9,000 9,000 A,F 6 1 1 1 FORD TRACTOR 13,000 13,000 13,000 A 7 1 1 1 RADIO 1,000 1,000 1,000 A 8 1 1 1 YAZOO WALK BEHIND MOWERS (3) 1,800 1,800 1,800 A,F 9 1 1 1 YAZOO WALK BEHIND MOWERS (3)(R) 2,000 2,000 2,000 A,F 10 1 2 2 MOTT FLAIL MOWER (1) 3,000 3,000 3,000 A DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION - 42 - METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 STORMWATER DRAINAGE (538) PAGE TWO OF TWO -43- D P C TOTAL COST NO P' CM & O PROJECT DESCRIPTION. ESTIMATE EST CASH 5 YEAR FY FY FY FY FY' METH. T Z M COST THRU 9 30 - - PROGRAM 92-3 93-4 94 -5 95=6 96 .7 hIN. ;:: 11 1 1 1 20' BOOM MOWER 17,500 17,500 17,500 A 12 1 1 1 DEWEZE SLOPE/LEVEL MOWER MC70 30,000 30,000 15,000 15,000 A (2) (R) 13 1 1 1 SURVEY AND ANALYSIS; CAPITAL 1,185,200 1,185,200 298,200 290,500 129,000 144,000 324,000 A IMPROVEMENTS DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER -43- FIVE YEAR CAPITAL EMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 WATER ADMINISTRATION DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION — 44 — METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER NO D P CM & C O PROJECT DESCRIPTION TOTAL ESTIMATE EST CASH COST 5 YEAR FY FY : FY EY - FX METH. . T Z' M " COST THRO 9/30 - PROGRAM 92-3 93-4 9;4-5 95; 6 96-7 1 1 2 2 Facsimile machine (1/2 cost) 1,000 1,000 1,000 A 2 1 1 1 Office furniture, additional 700 700 A inspector (1/2 cost) 700 3 1 1 1 Computer workstation (1/2 700 700 700 A cost) 4 1 1 1 GIS Terminal (1/2 cost) 6,000 6,000 6,000 A 5 1 1 1 Flat file for drawings (1/2 600 600 600 A cost) 6 1 1 1 Lateral file (1/2 cost) 600 600 600 A 7 1 1 1 Inspection & Master Planning 243,000 243,000 117,000 126,000 F Services 8 1 1 1 1 Capital Projects Management 73,000 73,000 35,000 38,000 F DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION — 44 — METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER Water Administration NO D P CM F Z C O PROJECT DESCRIPTION TOTAL ESTIMATE EST CASH COST 5 YEAR FY FY FY FY FY METH.' T M C08T THRU 9/3Q PROGRAM 92-3 93-4; 94 5 9 1 1 1 Debt service on 4,200 4,200 1,400 1,400 1,400 folder/inserter A 19 1 1 1 Debt service on mailer 3,900 3,900 1,300 1.300 1,300 A 11 1 1 1 Diazo blueprint machine (1/2 2,250 2,250 2,250 A total cost) 12 1 1 1 Uninterruptable Power Supply 2,400 2,400 1,800 600 A (1/2 cost) 13 1 1 1 100 MB tape drive (1/2 cost) 750 750 750 A (3 @ 250) DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER 45 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 WATER OPERATING DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION — 46 — A. B. C. METHOD OF CURRENT REVENUE IMPACT FEES OTHER FEDERAL AID FINANCING D. REVENUE BONDS E. STATE AID F. OTHER D P C TOTAL COST . NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR. FYI FY FY FY FY; METH.: T' Z M COST THRU 9/30 - PROGRAM 92-3 93-4 94-5 95-6 9G.-7 FTN.: 1 1 1 1 Saf-T-Notch Rail System 1,200 1,200 1,200 A 2 1 2 2 5 Cu. Yd. Dump Truck 30,000 30,000 30,000 A 3 1 1 1 Tandem Wheel Trailer 5,000 5,000 5,000 A 4 1 1 1 Pin -on style forks for 1,000 1,000 1,000 A backhoe 5 1 1 1 "Pow -R Mole" underground 6,500 6,500 6,500 A conduit installation equipment 6 1 1 1 Gasoline powered saw 900 900 900 A 7 1 1 1 Fire hydrant flow testing 600 600 600 A equipment 8 1 2 2 Electrically powered valve 2,500 2,500 2,500 A actuator DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION — 46 — A. B. C. METHOD OF CURRENT REVENUE IMPACT FEES OTHER FEDERAL AID FINANCING D. REVENUE BONDS E. STATE AID F. OTHER WATER OPERATING DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION — 47 — METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER D P' C: TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST:CASH 5 YEAR FY FY FY..F,Y FY METH.: T Z'. M COST THRT 9/ 30 : . PROGRAM 92-3 93-4 94 5 9 1 1 1 1/2 ton pickup truck with 11,000 11,000 11,000 A service body 10 1 1 1 Wall mounted case for 900 900 900 A chlorine emergency gas masks 11 1 1 1 Fluoride pump 2,200 2,200 1,000 1,200 A 94 - Jamela Plant 96 - Kissimmee Avenue Plant 12 1 1 1 Drive motor for water well 5,000 5,000 5,000 A 13 1 1 1 ISE Fluoride meter 1,200 1,200 1,200 A 14 1 1 1 1/2 ton pickup truck with 12,500 12,500 12,500 A service body 15 1 1 1 Radio base station 1,500 1,500 1,500 A 16 1 2 2 Table and chairs for break 1,000 1,000 1,000 A room 17 1 1 1 Television and VCR 600 600 600 A 18 1 1 1 Revisions and additions to 350,000 350,000 350,000 F Jamela water treatment plant booster pump DPT=DEPARTMENT CM=CITY MANAGER P&Z=PLANNING & ZONING COM=COMMISSION — 47 — METHOD OF FINANCING A. CURRENT REVENUE D. REVENUE BONDS B. IMPACT FEES E. STATE AID C. OTHER FEDERAL AID F. OTHER WATER OPERATING NO D P T CM P & Z.` C O M PROJECT DESCRIPTION TOTAL ESTIMATE' COST EST CASH THRU 9/30 COST 5 YEAR PROGRAM FY 92-3 FY 93-4 FY 94-5 F:Y 95-6 FY 96-7 _. _.; METH. FIN. 19 1 1 1 Modifications to storage tanks at Jamela WTP 85,000 85,000 85,000 F 20 1 1 1 12" water main on White Road: Hammocks Subdiv. to Clark Rd. 55,000 55,000 55,000 F 21 1 1 1 Upsize water main to 12" through Plantation Grove East subdivision 40,000 40,000 40,000 F 22 1 1 1 Improvements to water storage facilities at Kissimmee WTP 200,000 200,000 200,000 F 23 1 1 1 Debt service on backhoe 25,600 25,600 6,400 6,400 6,400 6,400 A 24 1 1 1 Water meters 150,000 150,000 25,000 27,500 30,000 32,500 35,000 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE -BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER 48 FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 SOLID WASTE DEPARTMENT (534) - 49 - D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY:TY::':-METH. T 2 ' M COST THRU 9/30 - PROGRAM 92-3 93-4 94-5 95-6 96-7 FIN.i 1 1 1 1 SOFTWARE/ROUTING, TONNAGE, 750 750 750 A COMPOSITION 2 0 0 0 0 LEASE PAYMENTS ON TRUCKS 150,000 120,000 30,000 30,000 A 3 0 0 0 0 1/3 DEBT SERVICE ON FOLDER 9,200 2,300 6,900 2,300 2,300 2,300 A INSERTER 4 2 2 2 2 TON FLAT BED TRUCK 20,000 20,000 20,000 A 5 2 2 2 COMMERCIAL GLASS CRUSHER 3,500 3,500 3,500 A 6 1 1 1 FRONT SIDE LOAD GARBAGE TRUCK 520,000 520,000 220,000 150,000 150,000 A W/PACKER (R)(4) 7 2 2 2 FORK LIFT (LEASE) (USED) 5,000 5,000 5,000 A 8 1 1 1 1/2 TON PICKUP WITH LONG 13,500 13,500 13,500 A WHEEL BASE (R) 9 1 1 1 MOBILE PRESSURE WASHER - 5,000 5,000 5,000 A GASOLINE OPERATED DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 49 - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 WASTEWATER ADMINISTRATION NO P CM C O PROJECT DESCRIPTION TOTAL ESTIMATE EST CASH COST 5 YEAR FY FY FY FiC FY METH. T Z M COST THRU 9 3:0 PROGRAM 92-3 93-4 94-5 95.;. 6 96-? FIN. 1 1 2 2 Facsimile machine (1/2 cost) 1,000 1,000 1,000 A 2 1 1 1 Office furniture, additional 700 700 A inspector (1/2 cost) 700 3 1 1 1 Computer workstation (1/2 700 700 700 A cost) 4 1 1 1 GIS Terminal (1/2 cost) 6,000 6,000 6,000 A 5 1 1 1 Flat file for drawings (1/2 600 600 600 A cost) 6 1 1 1 Lateral file (1/2 cost) 600 600 600 A 7 1 1 1 Inspection & Master Planning 291,000 291,000 140,000 151,000 F Services 8 11 1 Capital Projects Management 73,000 73,000 35,000 38,000 F DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER 50 Wastewater Administration - 51 - D F & C TOTAL COST NO P' CM O PROJECT DESCRIPTION ESTIMATE EST CASH 5 YEAR FY FY FY FY FY. METH..' T' Z M COST THRU 9 3Q PROGRAM 92-3 93-4' 94. 95-6 96-7 9 1 1 1 Debt service on 4,200 4,200 1,400 1,400 1,400 folder/inserter A 10 1 1 1 Debt service on mailer 3,900 3,900 1,300 1.300 1,300 A 11 1 1 1 Diazo blueprint machine (1/2 2,250 2,250 2,250 A total cost) 12 1 1 1 Uninterruptable Power Supply 2,400 2,400 1,800 600 A (1/2 cost) 13 1 1 1 100 MB tape drive (1/2 cost) 750 750 750 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 51 - u FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 1993-1997 WASTEWATER OPERATING — 52 — D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION - ESTIMATE EST CASE 5 YEAR FY FY FY FY FY' : METS. T Z M COST THRU 9/30 PROGRAM 92-'3 . 93-4 9'4-5 95:-6 96-7 FIN. 1 1 2 2 Hydraulically operated pump 23,000 23,000 23,000 A 2 1 2 2 Replace lift station in 60,000 60,000 60,000 A/F Pioneer II mobile home park 3 1 1 1 Autostart dieselum for P P 40 000 . 4 0,000 40,000 A/F lift station #1 (Nicole Ave.) 4 1 1 1 1/2 ton pickup truck with 10,500 10,500 10,500 A service body 5 1 1 1 1/2 ton pickup truck with 12,500 12,500 12,500 A service body 6 1 1 1 Laboratory analytical balance 3,000 3,000 3,000 A 7 1 1 1 Radio for 1/2 ton P.U. 800 800 800 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER — 52 — WASTEWATER OPERATING D F C TOTAL COST NO P CM & O PROJECT DESCRIPTION ESTIMATE..5 EST .CASH YEAR FY FY FY FY FY METH. T �> M COST THRU 9/30 PROGRAM 92-3 93-4 94 5 95-6 96- 7 8 1 1 1 Spare 25 p HP lift station pump 10,000 10,000 10,000 A 9 1 1 1 Autodialer for lift station 1,000 1,000 1,000 A #10 10 1 1 1 Portable oxygen sensor 1,500 1,500 1,500 A 11 1 1 1 1/2 ton pickup with utility 13,000 13,000 13,000 A body 12 1 1 1 Medium duty tractor 23,000 23,000 23,000 A 13 1 2 2 1 ton truck with service body 20,000 20,000 20,000 A and crane 14 1 2 2 Rehab Lift Station #5 25,000 25,000 25,000 A 15 1 1 1 Expand WWTP #2 to 3 MGD and 4,500,000 4,500,000 4,500,000 F reconfigure on-site ponds 16 1 1 1 Spray irrigation system 100,000 100,000 100,000 F coordination and permits 17 1 1 1 South -to -west master force 250,000 250,000 I 250,000 I F F main DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER - 53 - WASTEWATER OPERATING — 54 — D P C TOTAL COST NO P CM & O PROJECT DESCRIPTION:' ESTIMATE EST CASH 5 YEAR FY FY FY FY FY METH.:: T` 2 M COSTPROGRAM THRU 9130192-3 93-4 94-5 95-6 96-7 :::FIN 18 0 0 0 0 Debt service on sludge truck 16,500 16,500 16,500 A 19 1 1 1 Replacement autodialers 5,000 5,000 1,100 1,200 1,300 1,400 A DPT=DEPARTMENT METHOD OF FINANCING CM=CITY MANAGER A. CURRENT REVENUE D. REVENUE BONDS P&Z=PLANNING & ZONING B. IMPACT FEES E. STATE AID COM=COMMISSION C. OTHER FEDERAL AID F. OTHER — 54 —