Loading...
Item 07 Consideration to Approve Expenditure of $24,000 from the Stormwater Operating Contingency Funds for Repairs to the Culvert and Pavement on A.D. Mims Road, West of the Beech Center and Award Bid to T.D. Thomson Construction center of GOOd LJ jJ{fJ. '!~ oc-~ AGENDA ITEM COVER SHEET Meeting Date: April 5, 2005 Item # 7 Contact Name: Contact Number: Bob Zaitooni 6002 Reviewed By: Department Director: City Manager: Subject: Repair of Culvert & Pavement on A.D. Mims Road Background Summary: This project is intended to replace the cross culvert under A.O. Mims Road and repair the pavement at the crossing east of the entrance to the Beech Center. The culvert failure and insufficient compaction has caused a noticeable depression in pavement at this location. Staff obtained 3 written quotes for the project and recommends award to T.O. Thomson Construction. The project will be funded from the Stormwater Operating Contingency Funds. Issue: City Commission to authorize funds and approve issuing a Purchase Order to T.O. Thomson Construction for $24,000. Recommendations Approve expenditure of $24,000 from the Stormwater Operating Contingency Funds the project and approve award to T.O. Thomson Construction. Attachments: Three (3) Quotes Financial Impact: The funds are available from Stormwater Operating Contingency Funds with a balance of $54,195. Type of Item: o Public Hearing o Ordinance First Reading o Ordinance First Reading o Resolution o Commission Approval o Discussion & Direction For Clerk's Deaf Use: I:8l Consent Agenda o Public Hearing o Regular Agenda D Original Document/Contract Attached for Execution by City Clerk D Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) 3/ 'Z. &J I ()) . i:2J N/A o N/A o N/A City Mana2:er Robert Frank Commissioners Danny Howell District 1 Scott Anderson, District 2 Rusty Johnson. District 3 Nancy J. Parker, District 4 Mayor S. Scott Vandergrift STAFF REPORT TO: The Honorable Mayor and City Commissioners FROM: Bob Zaitooni, Director or Public Works DATE: March 29, 2005 RE: Repair or Culvert & Pavement on A.D. Mims Road ISSUE Should the Honorable Mayor and City Commission authorize $24,000 from Stonnwater Operating Contingency Funds for the replacement of culvert and repair of the pavement on A.D. Mims Road; and approve award of project to T D. Thomson Construction? BACKGROUNDIDISCUSSION This project is intended for the replacement the cross culvert under A.D. Mims Road and the repair of the pavement at the crossing east of the entrance to the Beech Center. The culvert failure and insufficient compaction has caused a noticeable depression in pavement at this location. Staff has obtained three (3) written quotes from Ranger Construction Industries, Inc. (68,328.20), Conway Underground Construction, Inc. ($23,898.52), and TD. Thomson Construction ($23,625.60) for the project and recommends award to TD. Thomson Construction. The project will be funded from the Stonnwater Operating Contingency Funds. RECOMMENDATION Staff respectfully requests that the Honorable Mayor and City Commission to approve expenditure of $24,000 from the Stonnwater Operating Contingency Funds for this project; and approve award of the project to T.D. Thomson Construction. nar 11 U~ U~;U~p IV Inamson "fU'-IO~,",-D.:J~1 p.c: CITY OF OCOEE 3/11/2005 ATTN:BUDDYELMORE~TREET~STORMWATER Repair Road & Pipe on A.D. Mi.s T. D. Thomson Construction 407 w654-8388 Fax 407-654-8351 ITEM DESCRIPTION QUANTITY !Ui!! UNIT PRICE AMOUNT 1 Mobilization 1 lS $ 2,000.00 $ 2,000.00 2 Remove Pipe & Asphalt 1 LS $ 1,500.00 $ 1,500.00 3 105ta1l42" R.C.P. 56 LF $ 98.00 $ 5,488.00 4 Tie Ins 2 EA $ 600.00 $ 1,200.00 5 Replace limerock 1 LS $ 1,800.00 $ 1,800.00 6 Replace Asphalt 1 lS $ 3,500.00 $ 3,500.00 7 Testing 1 lS $ 900.00 $ 900.00 8 Cleanup 1 lS $ 1,500.00 $ 1,500.00 9 Traffic Control & lights 1 lS $ 1,800.00 $ 1,800.00 $ 19,688.00 20% OVERHEAD $ 3,937.60 GRAND TOTAL OF BID $ 23,625.60 I NOTE SECTION*..... City to supply permits .- ~ ... i . s C--.-:~~~ .' ~ Thomas D. Thomson President 11.Mar-05 Accepted By Date MRR-14-2005 09:49R FROM: ru: .ql::lrYI::l~.31 (b p:~rc Conway Underground Construction, Inc. 4129 Stonewall Drive, Orlando. Fl32612 Phone; 407-050-5554 FAX: 407.850-5571 Certified Undergound Contractor #1 ~2391 0 A Complete Underground Company T o:City of Oooee Oate:3-14-05 AttBuddy Elmore RetAO Mimms Rd cue Inc. will provide Insurance. Labor & Materials to perform the following Scope of Work: MOBILIZATION: Mobilization/Demobilization MOT Demo Removal 1 Ls 1 Ls 1 La 4,004.50 93 Sy 51 If 51 If 2 Ea 1 Ls 93 Sy 1 Ls 19,894.02 I J23.698.S21 5JORM SEWER SYSTEM f Niaht Work 6PM- SAM ) Demo RoadWay Demo exist CMP 36" RCP Connect to Exist Inlet Dewatering ( Gravel Bed) Base & Asphalt Repair Plug Exi$t ReI' & Pump 'PROJECT TOTAL: EXCLUSIONS 1. Certified As Builts 2. RelOcation of Exist. Utility Unes 3. Shoring & Roadway Protection 4. Well Point Dewatering 5. Density Testing 6. Permits & Fees 7. Well point Dewatering All materials are guaranteed to be specified. This Scope of Work will be completed in workmanlike manner according to standard practices. Any changes or deviation from specifICations involving extra material or labor will be performed upon written acceptance Of extt. eosts, above this proposal price. Net 30 O.ys Accepted by: Date: Amount S Thank You for the opportunity to bid this project, should you have any questions about this proposal, please don't hesitate to call our office. This proposal is good for Thirty (30) days. Plans Dated: Conway Underground Construction. Inc. Robert Gomer Page 1 A D Mimms Rd Storm Repair PROPOSAU Contract Agreement Bid Numbor: 050308 To : Clly of Oeo08, Public Works 301 Mequlre Rd. Ocoee, Fl. 34761 ':sx407.90503176 Attn: Buddy Elmore Date: 31712005 Job Name: Location: 42" pipe replacB AD M1ms Rood Ocooe Phone: 407.905-3170 Wo horeby submll speclDcallans and ost/malos for: Provide MOT crew and materials Quanllty o o o 1 o o o Unit LS TN TON LS EA I.F LF Unit Price $0.00 SO,OO $0.00 $68,32820 SO.OO $0,00 $0.00 extension $0.00 SO.OO $0.00 $68,328.20 $0.00 $0.00 $0.00 1 2 3 4 5 6 7 DO$crlpUon Remove eKlstlng CMP, Replace with 42" Rep. backfill with flowabel fill, Mill 23' x 3D' and place 2" asphalt. 2 or 3 nights Total Nolus: 1. Prl&;o does nollnclude any englnoorlng !.ayoul. Tasting, As BullIS, Pormlt Fees, Maintenance of Truffle, RonJng Straight Edge or Bonet. 2. PrlCD for prime Is based upon 8 minimum billing of $SOD.DO per trip to thu proJol:t. 3. Bid based on 1 MobHlzatlons for Asphalt. Eech additional mob to bo billed at $25DD each. 4. Contractor I Ownor ;tgtoes to pay Ranger for any ovor.runs at 550.00 per Ton. 5. BaslJ to bo stable. unyielding and graded to plan prior to Rangar beginning work. 6. this Quolallon was based on 110 Ibs per sy Inch and was basad on using Rap materiel. 7. Bid based on all work being perfOmllld Monday through Friday. (Daytime with no hour restrictions) 8. Final paymont to be based on actual Quantltles as determined by measurement ~n complcUon of work. All matorlalls guaranteed to be as spec\nod. An work lD be completed In a wotkmanllke manner aCCOrding 10 standard pracl1ces. Any alterations ar deviation from above specifications Invohllng olrtra costs win be executed only upon wrltten orders and win bocome an extm ct1erge Dver and abovo tho BstlmBte. All agraements conllngunt upon sttlkes, accidents. or delays beyond our conlrol. Owner to carry fire, IOmGdo, end other nocessary Insurance. Our workers are fully cDverad by Workman's Componuatlon Insurance, This Praposalls COI'ItIngont upon accepleble and vorl \0 pro flnat'l"9. NOTE: This Proposal may be withdrawn by us If not ac:coptod within Thirty (30) days. SubmltlBd by: $68.328.20 PLEASE SIGN AND RETURN ORIGINAL UPON ACCEPTANCE. fJPONexECUTION OF THIS PROPOSAl. TI-lIS DOCUMENT BECOMES A CONTRACT. ThG abovo prlCOS, spoclflcaUOTls end conditions are satisfactory and are hereby accepted. You are authorized 10 do the work specified. Payment wnl bB made within 10 days of compleUon and mlm\hly pRlgro" payments will be mede by the 1 Dth of the month for work porfonned In the prevIous month. In tho ovont th;t ;mount herein shDwn /s not paId whon duo, Inlorost at tho highest le;(II rata per annum shall accumulato on total due. All costs of calladlon shall bo paid by the CUSlOmer Including reasonablD attornoy foes, Accepted by Client: Authorized Signature: Dato: Accopted by Ranger Constructlan Industries, INC. Authorized Signature DaIB: Credit Approval: 1200 Elboc Way, Winter Garden, Florida 34787, Phone (407) 656-9255, Fax (407) 656-3188